Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Diseño óptimo, construcción y mantenimiento de sistemas de izajeBy Graham Speirs
La minería del siglo XXI requiere que ingenieros, consultores y proveedores brinden apoyo a promotores, desarrolladores y operadores para lograr una extracción y procesamiento de minerales segura, efi
Sep 30, 2017
-
ADEQUAÇÃO DO SOPRO DE EMERGÊNCIA PARA OS AF’s 2 E 3By Fábio Rogério do Carmo
O ar soprado é uma das principais utilidades responsáveis pelo processo de transformação do minério de ferro em gusa no Auto Forno. Para que ocorra o processo de redução o ar soprado é superaquecido n
Sep 25, 2017
-
Metodologia Inovativa Para Programas De Redução De Consumo De Energia Combinando Análise De Processos Industriais E Participação De OperadoresBy Juliana Fonseca Paim
A eficiência energética na indústria vem ganhado destaque no contexto atual. Um dos grandes desafios da atualidade é de utilizar os vários milhares de medidas de processos industriais coletadas, armaz
Sep 25, 2017
-
Olympic Dam rock quality designation model – an integrated approachBy M Passmore, N Poznik
Olympic Dam is a world-class deposit and is unquestionably one of the most geologically, structurally and texturally complex orebodies in the world. As development advances into the Southern Mine Area
Sep 20, 2017
-
The necessary role of the geologist in geotechnical data gatheringBy P B. Hills
Almost a quarter of a century since Bridges (1993) documented techniques for the assessment of ground conditions in a seminal paper in the Proceedings Second International Mining Geology Conference, t
Sep 20, 2017
-
Rewriting the rule book – geology organisational designBy T McLeod, B Catto
AngloGold Ashanti Australia’s (AGAA) Tropicana gold mine (TGM) geology department seized the rare opportunity of building a new geology department for a new operation: the philosophy, the people and t
Sep 20, 2017
-
Why combine reverse circulation and diamond drilling in Mineral Resource estimation at Purnama?By A N. Kasnanto, D A. Sims, J Pocoe, B Pulungan
In this case study we compare the sampling quality of diamond drilling (DD) and reverse circulation (RC) drilling at the high sulfidation Purnama gold–silver (Au-Ag) deposit located in northern Sumatr
Sep 20, 2017
-
Empirical mill throughput modelling and linear programming for blend optimisation at the Phu Kham copper-gold operation, LaosBy B Saunders, J Carpenter
PanAust’s Phu Kham copper-gold operation (Phu Kham) in Laos is currently limited by throughput in the Semi Autogenous Grinding (SAG) mill. The ability to accurately predict SAG mill throughput (throug
Sep 20, 2017
-
Findings from a transient electromagnetic trial for heat-affected coalBy H J. Stedman
A Transient Electromagnetic (TEM) geophysical survey was trialled in Bowen Basin Permian coal measures overprinted by Cretaceous intrusion. The trial’s intention was to compare whether TEM could asses
Sep 20, 2017
-
Public reporting – new standards or no standards?By J Coombes, R Sterk
The efficiency of the Australian and New Zealand stock exchanges relies on a fully informed market: shareholders and investors are fully and transparently informed of all material information relating
Sep 20, 2017
-
Sulfur – the new geometallurgical grade in gold-sulfide depositsBy S Juras
To our geologists at Eldorado Gold Corporation, the release of the gold assays on a new ore zone causes a flurry of excitement. But to our metallurgists, that news is often greeted with the question ‘
Sep 20, 2017
-
Starting from scratch – defining remnant resources from publicly available data: a case study from the Lord Nelson and Lord Henry gold depositsBy C Jia, J Graindorge, L M. Olssen
Picking up abandoned mining tenements and looking to recover remnant resources around old operations is an opportunity that comes with its own challenges and risks. Reliance on information released to
Sep 20, 2017
-
Geoscience input into blasting operations – let’s set a new standardBy T N. Little
The author contends that geoscience is presently under-utilised in the rock fragmentation by blasting process. Before we can set standards in this area, the following is required: mine geologists need
Sep 20, 2017
-
The importance of geometallurgical test work for industrial minerals projectsBy A J. Scogings, W J. Shaw
The successful development of industrial minerals projects requires an integrated, holistic understanding of the metallurgical and product performance test work in the context of the geological settin
Sep 20, 2017
-
Improved assurance for Mineral Resource and Ore Reserve estimates and reporting through peer review and auditingBy M A. Noppé
Mining is inherently a risk-based business and risk governance is an integral part of corporate assurance and business decision-making. Mineral Resources and Ore Reserves are the key assets for a mine
Sep 20, 2017
-
Washability modelling and estimation techniques used to improve coal handling preparation plant beneficiationBy P J. Handley
"Predicting how coal seams will be beneficiated through the coal handling processing plant (CHPP) has long been challenging within BHP Coal. Various coal seams from different areas are mined and stock
Sep 20, 2017
-
Charles Dickens on the (potentially) changing role of globalisation and sustainability in the long-term future of mining and explorationBy J P. Sykes, T C. McCuaig, M Jessell, A Trench
The election of Donald Trump and the Brexit referendum herald a shift towards a tighter definition of economic value, at the expense of the broader value concept of sustainable development; as well as
Sep 20, 2017
-
Pattern recognition in transformed data – the search for domain shapes in mine geology dataBy S McKinley, S Juras, E Uludag
More and more, today’s mining geologists are asked to identify and create 3D value domains for multidisciplinary usage: grade definition, geometallurgical performance and geotechnical characteristics,
Sep 20, 2017
-
An integrated approach to mine planning – building the integrated planning model at Tropicana gold mineBy M Kent, D Elder, J Woodward, R Edwards, B Catto
At Tropicana gold mine (TGM), mine planning is completed from ‘one source of truth’ known as the Integrated Planning Model (IPM). The IPM is a block model which forms a core component of the TGM Mine
Sep 20, 2017
-
The discovery of the QTS Central ore system, CSA mine, Cobar, NSW, AustraliaBy E Apaza, R Neumayr
This paper aims to summarise the discovery of the QTS Central resource, a previously unidentified +1 Mt inferred resource that lies between two major CSA resource systems.The 1.7 Mt at 5.76 per cent C
Sep 20, 2017