Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Testing new estimation techniques – rank and replace: a stockwork case studyBy D Finn, D Kentwell
Experience has shown that the E-Type multiple indicator kriging (MIK) estimation technique often works well for resource estimation in stockwork mineralisation that contains a mixture of high and low-
Sep 20, 2017
-
Empirical mill throughput modelling and linear programming for blend optimisation at the Phu Kham copper-gold operation, LaosBy B Saunders, J Carpenter
PanAust’s Phu Kham copper-gold operation (Phu Kham) in Laos is currently limited by throughput in the Semi Autogenous Grinding (SAG) mill. The ability to accurately predict SAG mill throughput (throug
Sep 20, 2017
-
Public reporting – new standards or no standards?By J Coombes, R Sterk
The efficiency of the Australian and New Zealand stock exchanges relies on a fully informed market: shareholders and investors are fully and transparently informed of all material information relating
Sep 20, 2017
-
Sulfur – the new geometallurgical grade in gold-sulfide depositsBy S Juras
To our geologists at Eldorado Gold Corporation, the release of the gold assays on a new ore zone causes a flurry of excitement. But to our metallurgists, that news is often greeted with the question ‘
Sep 20, 2017
-
Local uncertainty benchmarking – a coal case studyBy R Saha, D Barry, C Mawdesley, O Bertoli
Kriged estimates are not typically calculated on blocks substantially smaller than the sample spacing (eg the Standard Mining Unit or SMU). Moreover, the sample spacing for quality variables is often
Sep 20, 2017
-
Geoscience input into blasting operations – let’s set a new standardBy T N. Little
The author contends that geoscience is presently under-utilised in the rock fragmentation by blasting process. Before we can set standards in this area, the following is required: mine geologists need
Sep 20, 2017
-
Diamond drilling at Efemçukuru gold mine, Turkey – a case study on the benefits of timely and cost-effective drilling to short-term planningBy M Ozkayhan, N Arslan
"The Efemçukuru underground mine in western Turkey is an intermediate sulfidation, epithermal gold deposit. The bulk of the mineral resources and all of the mineral reserves lie within the Kestanebele
Sep 20, 2017
-
Best practice sampling QA/QC for gold and base metal mining – including how to assess the applicability of underground reverse circulation grade control samplingBy J T. Carswell
Best practice mine sampling should provide a detailed quantification of all potential sources of error at each stage of sampling, sample preparation and assaying.Quality assurance (QA) should include
Sep 20, 2017
-
Improved assurance for Mineral Resource and Ore Reserve estimates and reporting through peer review and auditingBy M A. Noppé
Mining is inherently a risk-based business and risk governance is an integral part of corporate assurance and business decision-making. Mineral Resources and Ore Reserves are the key assets for a mine
Sep 20, 2017
-
Washability modelling and estimation techniques used to improve coal handling preparation plant beneficiationBy P J. Handley
"Predicting how coal seams will be beneficiated through the coal handling processing plant (CHPP) has long been challenging within BHP Coal. Various coal seams from different areas are mined and stock
Sep 20, 2017
-
Charles Dickens on the (potentially) changing role of globalisation and sustainability in the long-term future of mining and explorationBy J P. Sykes, T C. McCuaig, M Jessell, A Trench
The election of Donald Trump and the Brexit referendum herald a shift towards a tighter definition of economic value, at the expense of the broader value concept of sustainable development; as well as
Sep 20, 2017
-
Pattern recognition in transformed data – the search for domain shapes in mine geology dataBy S McKinley, S Juras, E Uludag
More and more, today’s mining geologists are asked to identify and create 3D value domains for multidisciplinary usage: grade definition, geometallurgical performance and geotechnical characteristics,
Sep 20, 2017
-
An integrated approach to mine planning – building the integrated planning model at Tropicana gold mineBy M Kent, D Elder, J Woodward, R Edwards, B Catto
At Tropicana gold mine (TGM), mine planning is completed from ‘one source of truth’ known as the Integrated Planning Model (IPM). The IPM is a block model which forms a core component of the TGM Mine
Sep 20, 2017
-
Improving coal quality estimations using geostatistics and auxiliary variablesBy P Dowd, R Jeuken, C Xu
In Australian coalmines there are a number of coal quality parameters that are measured by analysing samples from boreholes. The data points are used to generate spatial models of these parameters, ty
Sep 20, 2017
-
Situational 3D variography – determining the variogram in the context of geologyBy P Gleeson, J Coombes, P Suresh, T McLennan
The last 20 years have seen a dramatic rise in the use of 3D visualisation and modelling for geological data, but there has been relatively little effort to do the same for the variogram models that u
Sep 20, 2017
-
Application of normative ore mineralogy to geological and metallurgical data sets at the Hera Au-Pb-Zn-Ag mine, New South Wales, AustraliaBy A R. McKinnon
The recently opened Hera Au-Pb-Zn-Ag mine in central New South Wales has provided an ideal opportunity to demonstrate the calculation of sulfide ore mineralogy using normative methods. Normative miner
Sep 20, 2017
-
Minimum sample mass from reverse circulation grade control drilling at Rocklands copper projectBy M G. Hawtin
The Rocklands copper project is a multilode, iron oxide copper gold (IOCG) + cobalt mineralised system located in the Eastern Fold Belt of the Mt Isa Inlier. Rocklands orebodies cover a range of oxida
Sep 20, 2017
-
Steve and Fred would have been mates – a comminution design evolution storyBy D David
Amongst those whose task it is to design tumbling mills and other comminution machines there is an almost religious divide between devotees of the Bond method and devotees of other methods developed i
Sep 11, 2017
-
Critical process design considerations from test work to operationsBy A Dennis, T Hunter, R Coleman
For metallurgical plant design, it is necessary to progress through successive phases of test work, piloting and process development before involving all the other engineering disciplines and “freezin
Sep 11, 2017
-
Pressure filtered tailings – environmental and cost benefitsBy R Williams, P Godwin
In a time of changing rainfall patterns and in the light of recent tailings dam failures, there is closer environmental scrutiny for proposed tailings dam construction or expansion. Therefore the elim
Sep 11, 2017