Search Documents

Sort by

  • SAIMM
    Modelling and optimization of a rotary kiln direct reduction process (e79e28aa-8eb6-430d-8d63-682078aabe5e)

    By H. P. Kritzinger, T. C. Kingsle

    "Rotary kilns are used for a variety of mineral processing operations. Hatch makes use of a kiln model developed from first principles to evaluate designs for its clients. This tool has been applied t

    Jan 1, 2015

  • SME
    Minimizing Impacts on Streams due to Underground Mining by Predicting Surface Ground Movements

    By Gabriel Böde Jimenez Leon, Michael Karmis, Christopher Newman, Zach Agioutantis

    "When utilizing high recovery underground mining methods, such as longwall or high-extraction room-and-pillar mining, the movement and deformation of the overburden propagate toward the surface and ma

    Jan 1, 2015

  • CIM
    Learnings from Infrastructure Replacement within an Operating Refinery

    By L. Trytten, S. Bass, P. Nawrocki, J. Mercer

    The Sherritt Fort Site nickel refinery and fertilizer plant has been operating continuously since 1954. The ammonia leach process uses ammonia and sulphuric acid, producing nickel and cobalt and an am

    Jan 1, 2015

  • SME
    Development of Mine Haul Road Surfacing Condition Monitoring Through Digital Image Processing

    By S. Pastor, S. Hahn

    "As the concept of autonomous haulage systems (AHS) moves from proto-types to production-ready applications, the operating performance of the haul road will become ‘mission critical’ to the overall su

    Jan 1, 2015

  • CIM
    Two New Structures of Hydroxamate Collectors and Their Application to Ilmenite and Wolframite Flotation

    By Brian Hart, Hong Zhong, Liuyin Xia, Kyle Douglas

    "The application of hydroxamic acid as flotation collectors is fast becoming of significant interest for the selective flotation of oxide minerals along with upgrading oxidised based metal ores and mi

    Jan 1, 2015

  • CIM
    Innovative Perspectives on Effective Development Methods for Mining Processing Plants

    By Thomas Glück

    Established and emerging mining companies face significant challenges in managing their operations and projects. Outcomes often do not meet the expectations of all the stakeholders of particular devel

    Jan 1, 2015

  • CIM
    Throughput and Recovery Improvements Following Commissioning of the Mount Milligan Mine

    By P. Miranda, K. Le, G. Maes, R. Peters

    "The Mount Milligan Mine, owned by Thompson Creek Metals Company Inc. (TCM), started operations in September of 2013. It is located between the communities of Fort St. James and Mackenzie and is the f

    Jan 1, 2015

  • SAIMM
    Titanium and Zirconium Metal Powder Spheroidization by Thermal Plasma Processes

    By J. L. Havenga, L. J. van der Walt, J. T. Nel, H. Bissett

    "SynopsisNew technologies used to manufacture high-quality components, such as direct laser sintering, require spherical powders of a narrow particle size distribution as this affects the packing dens

    Jan 1, 2015

  • SAIMM
    Transformation in the South African Mining Industry – Looking Beyond the Employment Equity Scorecard

    By Moraka N. V., van Rensburg M. Jansen

    "SynopsisGoing beyond transformation claims contained in employment equity scorecards and industry compliance reports, this article provides qualitative insight into the initiatives employed and chall

    Jan 1, 2015

  • SME
    Increasing Availability through Advanced Gearless Drive Technology (bdb34c0f-eece-4038-82e2-fac055da3c4a)

    By C. Dirscherl

    "Declining ore grade, leading to increased material transport and plant throughput requirements, is one of the major challenges in the current mining environment. This is accompanied by rising energy

    Jan 1, 2015

  • CIM
    Design Methodology for Large Underground Powerplants

    By R. Plassart, F. Laigle

    "As a powerhouse, a transformer or a valve chamber, large underground caverns are a major element of hydropower plant. On the contrary to galleries and shafts which are linear and long underground str

    Jan 1, 2015

  • SAIMM
    A validation study of the King stratification model

    By M. Bwalya, L. Mabokela, L. C. Woollacott

    This paper presents a study on the ability of the King stratification modelto describe density stratification patterns that are achieved under idealizedconditions. Tests were conducted in a batch jig

    Jan 1, 2015

  • CIM
    Test Work and Geochemical Modeling for Copper in Situ Leaching

    By L. K. Sinclair

    In situ leaching of copper has the potential to deliver low-cost recovery for soluble copper deposits of sufficient permeability. In order to provide key inputs for modeling of the in situ leaching pr

    Jan 1, 2015

  • SAIMM
    Application of Systemic Flow-Based Principles in Mining

    By J. O. Claassen

    "SynopsisMining value chains are dynamic systems and should be managed according to systemic flow-based principles. This includes a detailed focus on the impact of variable geological conditions on ma

    Jan 1, 2015

  • SME
    Coarse and Fine “Fish Hook” Inflections in Hydrocyclone Efficiency Curves

    By H. Walqui, S. K. Kawatra, C. H. N. Jeltema, T. C. Eisele

    "The literature contains many cases where the shape of hydrocyclone efficiency curves vary from the ideal “S” shape. These often appear as changes in slope, or inflections. These inflections can be di

    Jan 1, 2015

  • CIM
    Looking to the Future

    By Chris Twigge-Molecey

    Demand for metals will continue to grow as global population numbers and prosperity levels steadily increase. Consequently, there will continue to be a need to design and construct new metallurgical p

    Jan 1, 2015

  • CIM
    Study on the Impact of Using Cyclones Rather than Screens in the Grinding Circuit at Niobec Mine

    By Y. Sasseville

    "Niobec has been using vibrating screens and screw classifiers as a double stage classification in its grinding circuit since the very beginning of its operation in St-Honoré. Most of the other minera

    Jan 1, 2015

  • CIM
    Project Implementation

    By Randy McMeekin, Chris Twigge-Molecey, J. Peter Blake

    The project implementation phase, FEL4, is generally a complex undertaking. The project has been approved for construction and the capital has been allocated. At this point the project team comes unde

    Jan 1, 2015

  • SME
    Sealed Spherical Roller Bearings Used on Conveyors Improve Production

    By J. Oliver, J. Cleason

    "With maintenance costs rising and an increasing demand for higher production, the use of sealed spherical roller bearings can reduce maintenance costs while providing increased production uptime. The

    Jan 1, 2015

  • CIM
    Implementation of a Flotation Expert Control System at the Raglan Mine

    By G. Couture

    "The Glencore Raglan mine Concentrator, located in Quebec’s Nunavik region, has been in operation since 1997. The nickel metallurgical plant was originally designed to process 100 tonnes per hour of o

    Jan 1, 2015