Rock Stresses at Ok Tedi, Papua New GuineaBy L Mollison, K W. Mills, N R. P Baczynski, M F. Lee, I A. de Bruyn
This is the first of two papers concerned with rock stress inputs to various mine design issues at the large Ok Tedi open pit mine in Papua New Guinea. The companion paper (also published at this conf
Nov 5, 2014
-
Mining through Sandfill Using Spiling BarsBy D Carroll
Mining of the zinc, lead and silver deposit at the Broken Hill Southern Operations site has been occurring for over 100 years. As a result of this, a significant amount of high-grade ore is now taken
Nov 5, 2014
-
Geotechnical Challenges for Underground Commercial Space and Quarrying in AustraliaBy A B. Bayooke, A C. Robertson
In terms of underground tunnelling in metres advance per capita, Australasia compares well with the best world performers. This is because of the large number of metalliferous mines, coalmines and civ
Nov 5, 2014
-
Towards the Implementation of Discrete Fracture Network Modelling as a Geotechnical Design Tool – Case Study of Callie Underground MineBy S F. Rogers, K Doumis, J H. Graaf, B J. Barsanti
Advances in technology now allow geotechnical practitioners to better describe the properties and variability of a rock mass through advances in surface and underground mapping, borehole technology an
Nov 5, 2014
-
LaModel – A Program for Coalmine ModellingBy K A. Heasley
The LaModel program was initially developed in 1993, and it is used to model the stresses and displacements in thin tabular deposits such as coal seams. It uses the displacement-discontinuity variatio
Nov 5, 2014
-
Exploring the Use of Fibre Reinforced Shotcrete in Large Diameter ShaftsBy D J. Kilkenny, D A. O’Toole, P B. Hills, K L. Seah
An investigation was undertaken to critically analyse the use of fibre reinforced shotcrete (FRS) for a variety of applications in large diameter shafts. Those applications included the use of FRS wit
Nov 5, 2014
-
A New Tool for Extensometer Data Analysis and Improved Understanding of Geotechnical Risk FactorsBy M Szwec, P Corbett, P Sheffield
Centennial Coal operates the Springvale and Angus Place longwall mining operations that extract coal beneath the Newnes Plateau in the Western Coalfields of New South Wales. Springvale and Angus Place
Nov 5, 2014
-
Geología minera modernaBy Rodrigo Zambra
El presente texto señala las funciones del geólogo minero moderno -en tanto aporte al sistema de control y pueda registrar las observaciones sobre geología y otros aspectos de la mina. En ese sentido,
Oct 1, 2014
-
Design and Construction Contract C916 Beauty World Station and Tunnels, SingaporeBy R McDonough
DTL2 contract C916 was awarded in March 2009 for S$340 M. This contract includes two mass rapid transit (MRT) 1100?m long bored tunnels using two slurry tunnel boring machines (TBMs), with an internal
Sep 17, 2014
-
Comparison of Excavation Methods in Different Ground Conditions with the Decision Aids for TunnellingBy F Sandrone, J-P Dudt, J Zhao, E Paltrinieri
Tunnel boring machines (TBMs) excavation is nowadays more and more considered a valuable alternative to conventional tunnelling. As a matter of fact, thanks to its advantages such as greater rate of a
Sep 17, 2014
-
Initial Thoughts on Application of the Volume Loss Approach for Estimates of Surface Settlement Due to Tunnelling in Weathered RockBy S Kowalczuk, S V. L Barrett
The potential for adverse surface settlement during tunnelling in soil and rock poses a significant risk to the successful completion of any tunnelling project. Undesirable ground movement may lead to
Sep 17, 2014
-
The Measurement of Rock Stress for TunnellingBy I Gray
While in some cases it is vitally important to measure the virgin stress in rock prior to tunnelling there are a number of cases where such stress measurement is really not required. The concept of ha
Sep 17, 2014
-
Discrete Fracture Network Modelling for Tunnel Design in the Sydney BasinBy A L. de Ambrosis, F M. Weir, M Fowler
Traditional kinematic and statistical analyses of geological structure for geotechnical engineering applications, while considered industry standard practice, have some limitations and unrealistic ass
Sep 17, 2014
-
Precast Concrete Segmental Tunnel Linings – The State-of-the-artBy A Harding, M Chappell
Precast concrete segmental linings have enjoyed widespread use around the world, and are the lining type of choice for tunnels constructed using a shielded tunnel boring machine. However, there is sig
Sep 17, 2014
-
Risk Management and Use of a Geotechnical Baseline Report for a Competitive Alliance Procurement?ProcessBy T Ireland, S Eratne, W Newns, P Spies
The approach to risk management during the procurement of major projects often has a significant outcome on the ultimate delivery of a project. The NZ$1.4 B Waterview Connection project is the largest
Sep 17, 2014
-
Design and Construction of Sydney’s South West Rail Link Hume Highway UnderpassBy B Chapman, R Nievergelt, J Hill
A major component of Sydney’s new South West Rail Link project is the Hume Highway Underpass (HHU), an 80 m long twin track mined tunnel excavated at a depth of just 5 m below the pavement of the Hume
Sep 17, 2014
-
Procuring Control and Intelligent Traffic Systems for Major New Build Projects – Avoiding Pitfalls and Maximising ValueBy G M. Taylor
The application of high technology to monitor and control fire life safety, critical functionality in tunnels and underground spaces generally has progressed at an ever accelerating rate over the past
Sep 17, 2014
-
Improving Excavation Efficiency at the St Helena Tunnel Using Best Practice Drill and Blast TechniquesBy D Miller, M Dowling, R Domotor
"This paper is focused on blasting activities undertaken as part of the Pacific Highway Upgrade – Tintenbar to Ewingsdale – project (T2E). This is a ‘priority 1’ Pacific Highway road construction proj
Sep 17, 2014
-
Estimation of Rock Load for Tunnels with Different Disturbance FactorsBy J Rostami, T Afshar, M Sharifzadeh
Accurate estimation of rock load and selection of types of ground reinforcement to match post-failure behaviour of rock mass are important issues to assure tunnel stability. This paper focuses on the
Sep 17, 2014
-
A Transparent and Pragmatic Quantitative Risk Assessment Process for Assessing Fire Safety in New Zealand TunnelsBy T Ireland, B Wright, S Weaver
All tunnels have unique characteristics that result in different fire and life safety risk. The fire safety systems for each tunnel also give different benefits at different costs. It is therefore nei
Sep 17, 2014