Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Ore Selection Optimisation for an Iron Ore Deposit Using Linear ProgrammingBy M Aros, L Reilly
Iron ore is normally sold in bulk at certain specifications. These include iron grade and specific contaminant grades, typically silica, alumina, phosphorous and sulfur. These target grades are normal
Nov 24, 2014
-
Comparison between Gaussian Processes and Dynamic Time Warping for Classification of Marker Shales in Iron Ore DepositsBy A Melkumyan, K Silversides
The banded iron formation-hosted iron ore deposits located in the Hamersley Ranges of Western Australia contain marker shales that are used to distinguish lithology for geological and orebody mapping.
Nov 24, 2014
-
Sensor-based Real-time Resource Model Reconciliation for Improved Mine Production Control – A Conceptual FrameworkBy M W. N Buxton, M S. Shishvan, J Benndorf
The flow of information, and consequently the decision-making along the chain of mining from exploration to beneficiation, typically occurs in a discontinuous fashion over long timespans. In addition,
Nov 24, 2014
-
Parallel Implementation of a Tabu Search Procedure for Stochastic Mine SchedulingBy R Dimitrakopoulos, R Senécal
This paper presents a metaheuristic solution to the optimisation of open pit long-term production scheduling with a stockpile and geological uncertainty. The optimisation formulation is a two-stage st
Nov 24, 2014
-
A Stochastic Optimisation Formulation for the Transition from Open Pit to Underground Mining within the Context of a Mining ComplexBy J MacNeil, R Dimitrakopoulos
As open pit mining of a deposit deepens, the cost of extraction may increase up to a threshold where transitioning to mining through underground methods is more profitable. This paper provides an appr
Nov 24, 2014
-
Cut-off Grade-based Sublevel Stope Mine Optimisation – Introduction and Evaluation of an Optimisation Approach and Method for Grade Risk QuantificationBy M W. N Buxton, M T. Bootsma, J Benndorf, C Alford
Research in the field of cut-off grade optimisation has shown a relationship between cut-off grade, project life and net present value (NPV). Lane’s theory demonstrates that cut-off grades can be opti
Nov 24, 2014
-
Geometallurgical Modelling and Ore Tracking at Kittilä MineBy M Wortley, J Korteniemi, D La Rosa, L Rajavuori
Geometallurgical modelling of an orebody provides benefits to a mine by gaining a better understanding of the ore characteristics and how they affect the performance of the concentrator. With this kno
Nov 24, 2014
-
Applying Modern Heuristics to Maximising Net Present Value through Cut-off Grade OptimisationBy C A. Myburgh, S Craig, K Deb
In focusing on open pit mine scheduling, one of the biggest areas that a mining engineer can add value is in the area of cut-off grade optimisation. It is not atypical to add up to an extra 20 per cen
Nov 24, 2014
-
Aligning Resource Estimates with Mine PlanningBy D Kentwell
A resource model serves two main purposes depending on the stage of a project. The first is to provide an early indication of likely tonnages and grades at certain cut-offs so that decisions can be ma
Nov 24, 2014
-
Open Pit Strategic Mine Planning with Automatic Phase GenerationBy M Recabarren, A Echeverria, J Ronda, J I. Guzman, R Dodds, G Juarez, E Vila-Echague
A strategic mine plan is a fundamental part of any mining operation. It must provide a realistic and operative extraction and processing schedule, and yield the highest value for the business. For ope
Nov 24, 2014
-
Globally Optimising Open Pit and Underground Mining Operations under Geological UncertaintyBy R Dimitrakopoulos, K Kawahata, L Montiel
A method that optimises mining complexes that are comprised of multiple processing destinations, open pits and underground operations is presented. Mining, blending, processing and transportation deci
Nov 24, 2014
-
Is Truck Queuing Productive?By P Malkin, S Thomas, P M. Stone, D Kostyuk
In open pit mining, it is common that the bottleneck to productivity and profit lies in the truck-shovel mining operation, especially as strip ratios and mining intensity have increased with resource
Nov 24, 2014
-
An Application of Simultaneous Optimisation – Improving the Payback Period of a Zinc-Copper Open Cut ProjectBy D J. Thobaven
Project financing challenges caused by declining commodity prices have heightened the need to improve project metrics such as minimising capital payback and maximising net present value (NPV). Khnaigu
Nov 24, 2014
-
Simulating Extraction Shapes to Understand Financial Risk Using High Performance ComputingBy E Lima, D Gregory, C Faria, A Lapworth
Open pit mine enterprises are complex systems that depend on multiple parameters such as mineral grade distribution, geotechnical characteristics, economic conditions and engineering requirements, all
Nov 24, 2014
-
Mineral Supply Chain Optimisation under Uncertainty Using Approximate Dynamic ProgrammingBy R Dimitrakopoulos, C Paduraru
The optimisation of mine complexes and related value chains is a challenging problem due to the simultaneous presence of a highly-dimensional decision space, integer decision variables, non-linear con
Nov 24, 2014
-
Capital Expenditure Modelling for Strategic Mine SchedulingBy L Blackwell
Strategic mine scheduling is an industry best practice for increasing the long-term value of mining operations and supply chains. The application of optimisation technology such as mixed integer linea
Nov 24, 2014
-
Modelling Open Pit and Underground Production Scheduling in ConcertBy B King
A large number of mineral deposits contain regions in which it is economically beneficial to extract ore both via open pit and underground mining techniques. Current industry practice lacks an effecti
Nov 24, 2014
-
Life of Asset Planning, Uncertainty and Value Optimisation of the Iron Ore Business – From Exploration, to Market, to ClosureBy J McCluskey, N Barros
"Long-term strategic planning at BHP Billiton’s Western Australia Iron Ore business aims for sustainable value maximisation of its large, long-life, low-cost, expandable mineral inventory and supply c
Nov 24, 2014
-
Cost Management OptimisationBy B King
Processing expansion options and mining fleet purchases are major cost items that receive due focus in most cost management analyses. If these items are not needed, they can significantly reduce a pro
Nov 24, 2014
-
Predicting Mill Ore Feed Variability Using Integrated Geotechnical/Geometallurgical ModelsBy M Astorga, J Jackson, J Gaunt
The Ban Houayxai mine (BHX) is a relatively low-grade, low-cost, open pit gold-silver deposit in Laos operated by Phu Bia Mining, a subsidiary of PanAust. The ore production rate at BHX is 4.5 Mt/a, w
Nov 24, 2014