Search Documents

Sort by

  • AUSIMM
    Reconciliation Principles for the Mining Industry

    Reconciliation involves the collection of tonnage, grade (quality) and contained metal (product) data from disparate and hopefully independent sources. Examples are exploration data, production sampli

    Sep 26, 2011

  • AUSIMM
    A Numerical Approach for Prefeasibility Analysis of Tailings Disposal Options

    By B Muller

    The disposal of tailings has become a greater issue due to the changing economics of mineral extraction. The processing of lower grade deposits and tougher environmental regulations has led to the sel

    Sep 26, 2011

  • AUSIMM
    Data Generation in the Hunter Valley Coal Chain - A Case Study in Capacity Assessment

    By M Reisi, H Waterer, M Savelsbergh, F Engineer

    The Hunter Valley Coal Chain Coordinator (HVCCC) Limited is the primary planning organisation responsible for the export of coal through the Port of Newcastle, Australia. HVCCC stakeholders include pr

    Sep 26, 2011

  • AUSIMM
    The Decision of Stationarity in Modern Resource Estimation

    By B J. Wilde

    Evaluating the resources and reserves in a mineral deposit requires many interdependent subjective decisions. The decision of stationarity is arguably the most important. This decision includes: the

    Sep 26, 2011

  • AUSIMM
    The Effects of Considering the Spatial Bulk Density Variability in Mineral Resources and Reserves

    By J F. C L Costa, J C. Koppe, C Diedrich

    Currently mineral resources evaluation is firstly expressed in terms of volume. Next the resources are transformed into tonnes by using an average bulk density applied to the whole deposit or, in some

    Sep 26, 2011

  • AUSIMM
    "What do Geostatistics and Cut-Off Grade Optimisation have to do with Real Options Applied to Mine Project Evaluation?"

    By J Araya, O Leiva

    The mine evaluation process, composed of the designing, planning and valuation of a mine project, is, among other variables, based on an estimated orebody model. However, as the information from the d

    Sep 26, 2011

  • AUSIMM
    Long-Term Scheduling

    This paper describes modern long-term mine scheduling and gives an example of its application. It then discusses the obstacles to the implementation of such schedules.

    Sep 26, 2011

  • AUSIMM
    A Practical Approach to Truck Dispatch for Open Pit Mines

    By D M. Silva, J C. Alves

    According to the literature, material transportation represents 50 per cent of the operating costs for an open pit mine. In this context, this paper proposes a multistage approach for dynamic truck di

    Sep 26, 2011

  • AUSIMM
    The Resource Valuation and Optimisation Model Real Impact from Real Options

    By C Tonkin, S D. Howell, P V. Johnson, J Moriarty, P W. Duck

    This paper presents the scientific framework underpinning the resource valuation and optimisation model (RVOM). The RVOM is a partial differential equation based real options software package, which h

    Sep 26, 2011

  • AUSIMM
    Interactive Modelling and Visualisation of Large Deposits Using Linear Octrees

    Large deposits present computational challenges to todayÆs commercial orebody modelling systems that are based on conventional block models. We describe a system that is specifically engineered to mod

    Sep 26, 2011

  • AUSIMM
    "Development of a Real-Time Adherence to Mine Plan Tools as Part of an Integrated Remote Mine Control Centre"

    By S D. Dessureault

    In one of North AmericaÆs largest mines, which contains more than six active coal-producing faces, mine controllers must meet the complex challenge of adhering to the mine plan while also ensuring cus

    Sep 26, 2011

  • AUSIMM
    Mill Modelling Using an Extensible Station-Based Framework

    By E A. Gunn, J Zhou

    In this paper a project to develop a joint optimisation/simulation model for production planning in a mine-mill complex is presented. The system involves a mill receiving ore from a number of differen

    Sep 26, 2011

  • AUSIMM
    Four-Dimensional Network Relaxation Method for Long-Term Open Pit Mine Scheduling

    By J Yamatomi, Y Tamanishi, S Miwa

    The four-dimensional (4D) network relaxation method, originally developed by Akaike in 1999, uses Lagrange relaxation and is known for its ability to include the price change and possible better outpu

    Sep 26, 2011

  • AUSIMM
    Multi-Disciplinary Engineering Research and Development Skills for Mining û A Case Study

    By S Van Duin, I Porter

    This paper discusses how advanced manufacturing technology (AMT), which is fundamentally reliant on and developed via multi-disciplinary skills, has benefitted non-mining industries, and what lessons

    Sep 26, 2011

  • AUSIMM
    Application of Simulation Technology to the Design of Coal Clearance Systems

    Longwall mining operations have been in place in Australia since the early 1960s. This mining method is currently used to extract the bulk of coal obtained from underground mines in Australia (CSIRO,

    Sep 26, 2011

  • AUSIMM
    Visual Computing and Mine Design

    Visual computing opens the design process to a wider audience and allows rapid communication of mine plans to all stakeholders. The integration of software and hardware technologies that take advantag

    Sep 26, 2011

  • AUSIMM
    "Gravity Flow Under Moisture Conditions Control and Management of Drawpoint Mudflow"

    After many years of studying the rock mass gravitational flow phenomenon, it is well known that moisture conditions may change the mechanical properties of the caved and broken material, causing diffe

    Sep 26, 2011

  • AUSIMM
    Mining Network and the Security Question

    By A Huebner, A Noack

    Companies all over the world are very sensitive concerning their IT and network security. In most network connected technical installations and machines however, network security is not taken into acc

    Sep 26, 2011

  • AUSIMM
    Eight-Dimensional Planning Construction of an Integrated Model for Mine Planning Involving Constructability

    By E Rubio, N Morales

    A common practice in the mining industry is to decompose the planning process into different tasks, so the overall process and specific schedules can be constructed easily. Nevertheless, currently the

    Sep 26, 2011

  • AUSIMM
    Learning from Simulation at Boddington Gold Mine

    Various methods and software have been trialled for simulation of Au grades at Boddington Mine. This covers in-house and public software as well as sequential and turning bands methods. The diversity

    Sep 26, 2011