  • SME
    Site-specific blasting model for mine-to-mill optimization - SME Transactions 2011

    By J. Kemeny, K. M. Kim

    A site-specific blasting model has been developed for the Asarco Mission mine. The main inputs to the model are the in situ block size (F80), the post-blast fragmentation (P80) and the intact tensile

    Jan 1, 2011

  • SME
    Investigation of subsidence events over inactive room-and-pillar mines - SME Transactions 2011

    By Yi Luo

    Subsidence events occurring above inactive room-and-pillar (R&P) mines, including abandoned mines or sealed portions of active mines, are classified as unplanned subsidence, because of their timing an

    Jan 1, 2011

  • AUSIMM
    Application of Multi-Slicing Highwall Mining System with Stowing at Surface Coal Mine in Thailand

    The Electricity Generating Authority of Thailand (EGAT) Mae Moh coal mine is an open-cut coal mine in Thailand that produces about 16 Mt of lignite annually to generate 2400 MW of electricity. The sur

    Dec 6, 2010

  • AUSIMM
    The Next Challenge in Optimising Mining Operations

    This paper describes the past, normal and advanced practice of optimisation in mining. It then discusses what needs to happen for the mining industry to make full use of what is now available.

    Dec 6, 2010

  • AUSIMM
    Equipment Selection - What is the Issue? What About the Application of Simulation Packages?

    The selection of the mining fleet can have as much of an effect on the efficiency and effectiveness of an operation as the mining method. This is not to say that inefficiencies are only attributable t

    Dec 6, 2010

  • AUSIMM
    Advances in Continuous Miner Automation

    This paper describes new research and development currently being undertaken by the CSIRO Mining Technology Group to advance the automation capability of continuous mining equipment in underground coa

    Dec 6, 2010

  • AUSIMM
    She'll be Right Mate - Culture and Safety

    By N S Melkoumian

    While improvements in occupational health and safety (OHS) in the mining industry have decreased fatalities and accidents, little attention has been paid to the cultural confound of 'safety'

    Dec 6, 2010

  • SME
    NAT 2010 Full Proceedings - NAT2010

    By Bradford F. Townsend, Matthew E. Fowler, Michael F. Smithson, Lawrence R. Eckert

    All Rights Reserved. Printed in the United States of America. Information contained in this work has been obtained by SME, Inc. from sources believed to be reliable. However, neither SME nor its autho

    Dec 1, 2010

  • AUSIMM
    Managing the Transition from Low Stress to High Stress Conditions

    The transition from low stress to high stress conditions is a challenge eventually faced by most mines in Australia that extend to depths greater than (generally) about 1000 m. In areas with strongly

    Nov 25, 2010

  • AUSIMM
    Managing Geotechnical Risk Through Non-Destructive Rock Reinforcement Testing Trialled at the George Fisher Mine, Mt Isa

    Corrosion affects the performance of rock support and reinforcement at various underground mines, including the George Fisher Mine, where recent studies showed that this risk to mining operations is g

    Nov 25, 2010

  • AUSIMM
    Ground Support Selection and Performance Considerations in Seismically Active Mines

    This paper presents a rationale for selecting appropriate support elements which combine to form a support system to maintain stability in mines subjected to both strainburst and the shaking that occu

    Nov 25, 2010

  • AUSIMM
    A Computer Program for Analysing Rock Behaviour Based on the Bieniawski Criterion

    Development of a global failure criterion for rocks has been a desired goal in rock mechanics. Due to variations in factors affecting rock specifications and their mechanical properties, proposing a s

    Nov 25, 2010

  • AUSIMM
    Stope Performance in Challenging Ground Conditions: Observed Versus Predicted - A Case Study

    Throughout the study phases (scoping, prefeasibility and feasibility) of new mining projects one is forced to work with and make predictions based upon limited date obtained from diamond and reverse c

    Nov 25, 2010

  • AUSIMM
    Proactive Strata Control Management at Anglo American Metallurgical Coal Australian Open Cut Operations

    Anglo American Metallurgical Coal (AAMC) manages five open cut coal mines in Queensland and New South Wales, producing approximately 30 million tonnes per annum. The size and complexity of these mines

    Nov 25, 2010

  • AUSIMM
    Changing the Ground Support in Cemented Hydraulic Backfill at CSA Mine

    CSA mine, which is a deep level copper operation, located 12 km north of Cobar, NSW, currently uses a top down stoping method, utilising cemented hydraulic backfill (CHF) to fill and stabilise the sto

    Nov 25, 2010

  • AUSIMM
    Managing the Closure and Reopening of the South Ramp at Telfer Gold Mine During Sublevel Cave Breakthrough into the Open Pit

    The Newcrest Mining Limited Telfer Gold Mine consists of an underground sublevel cave (SLC) operation located 734 m directly below active open pit operations. Open pit and underground current producti

    Nov 25, 2010

  • AUSIMM
    Design of Air-Blast Plugs for a Sublevel Caving Operation

    The Telfer Underground sublevel cave (SLC) Operation is located approximately 850 m below surface. The cave was designed to propagate through an old decline which was initially used to monitor the cav

    Nov 25, 2010

  • AUSIMM
    Pillar Design Procedures and Research Methodologies - Can There or Should There be a Unified Approach?

    After some 50 years of worldwide research in relation to coal pillar mechanics and design as well as numerous workshops and technical papers related to these issues there is still some significant dis

    Nov 25, 2010

  • AUSIMM
    Pastefill - A Multi-Disciplined Review of Barrick Gold Corporation's Pastefill Operations in Australia

    During 2009 the technical services staff at Barrick Gold Corporation's Australian Business Unit conducted a review of their five underground mines that utilise pastefill as the backfill component

    Nov 25, 2010

  • CIM
    An Economical Vertical Transport System to Hoist 3 Mt of Ore per Annum from 1640 m

    By Wendy L. Naysmith

    This paper deals with the various options considered and factors that influenced the final selection of the headframe, shaft layout and hoisting systems required at the Impala No 16 Shaft in order to

    Oct 1, 2010