Search Documents

Sort by

  • CIM
    New Dimensions in Seismic Data Interpretation for Burst-Prone Mines

    By P. K. Kaiser

    3-D virtual reality (VR) visualization has opened new opportunities for complex 3D (x, y, z), 4D (x, y, z, t) or even nD data interpretation. The integration of common earth models (3D geologic data),

    Apr 1, 2005

  • CIM
    Sustaining a natural balance: A practical guide to integrating biodiversity into Rio Tinto's operational activities

    In the past decade, the increased engagement of business in debates around sustainable development has prompted recognition of the importance of biological diversity at the local, national and global

    Apr 1, 2005

  • NIOSH
    IC 9480 - Programmable Electronic Mining Systems: Best Practice Recommendations (In Nine Parts) - Part 6: 5.1 System Safety Guidance

    By John J. Sammarco

    This report (System Safety Guidance 5.1) is the sixth in a nine-part series of recommendations and guidance addressing the functional safety of processor-controlled mining equipment. It is part of a

    Jan 8, 2005

  • NIOSH
    IC 9479 - Coaching Skills for On-the-Job Trainers

    By Launa G. Mallett, Kathleen Kowalski-Trakofler, Robert H. Peters, Charles PH. D. Vaught, Peter Keating, William J. Wiehagen

    On-the-job training is a common means of training or retraining workers and the practice may seem simple and straightforward. Doing it effectively however requires more thought and preparation than si

    Jan 7, 2005

  • SAIMM
    Estimation Of Mineral Resources Using Grade Domains: Critical Analysis And A Suggested Methodology

    Common practice in mineral resource estimation consists of partitioning the orebody into several domains defined by grade intervals, prior to the geostatistical modelling and estimation/simulation at

    Jan 1, 2005

  • AUSIMM
    Iron Ore Mine Reconciliation ù A Case Study From Sishen Iron Ore Mine, South Africa

    By R Moller

    Reconciliation at large iron ore operations is a complex and time- consuming process. Often the volume of data and the large range of different stakeholders makes the process almost impossible. Up unt

    Jan 1, 2005

  • AUSIMM
    Management of Change ù The Transformation of UK Coal Project 105

    In the UK during the 1990s the energy companies had developed a policy of æDash for GasÆ, building large natural gas power stations to produce more than 30 per cent of the UKÆs electricity demand. The

    Jan 1, 2005

  • CIM
    Electrochemical Behavior of An X-80 Pipeline Steel During Stress-Corrosion Cracking in Near-Neutral-pH Environment

    By B. Fang

    Electrochemical behavior of an X-80 pipeline steel, including frequency-sweep electrochemical-impedance spectroscopy (EIS), time-sweep EIS at a constant frequency and open-circuit potential (OCP) moni

    Jan 1, 2005

  • CIM
    Solution Chemistry of Trithionate with Relevance to Gold Leaching by Thiosulfate: A Review

    By N. Ahern, D. B. Dreisinger, G. Van Weert

    In the thiosulfate leaching of gold, degradation of the thiosulfate reagent is a major cost. One of the intermediary degradation products is trithionate, which also inhibits gold recovery from solutio

    Jan 1, 2005

  • AUSIMM
    The Resource Management Amendment Act 2005 û The Implications for the Mining Industry

    By M van Kampen

    The Resource Management Act 1991 has been amended on a number of separate occasions since its enactment in 1991, and has recently be subject to further amendment by way of the Resource Management Amen

    Jan 1, 2005

  • AUSIMM
    Differential Cut-Off Grades

    Detailed underground mine design and optimisation studies undertaken by the author over the past few years have clearly demonstrated that additional value can be created by varying the cut-off grade (

    Jan 1, 2005

  • DFI
    Thirty Years of Experience with the Wave Equation Solution Based on the Method of Characteristics

    By Peter Middendorp, Gerald E. H. Verbeek

    "This paper will describe a brief history of the method of characteristics as an accurate solution of the wave equation, and the author's experiences with the method of characteristics over a period o

    Jan 1, 2005

  • AUSIMM
    Testing of Bunton Wall Connection Characteristics

    A series of physical tests have been conducted to determine the actual performance of bunton to shaft side wall connections typically used in new shaft construction in South Africa. The test set-up is

    Jan 1, 2005

  • SME
    Records Retention And Recovery – Corporate Norms And Issues

    By Donald W. Stever

    In 1995 I was asked to participate in a litigation matter between a corporation and its insurance carriers concerning insurance coverage for remedial costs at a large, environmentally contaminated clo

    Jan 1, 2005

  • CIM
    Thermodynamically consistent versus completely empirical property models in process simulation

    By M. W. Wadsley

    "Physical and chemical property models are widely used in process engineering. There exist, in the published literature, completely empirical models of ''thermodynamic properties"", that is,

    Jan 1, 2005

  • CIM
    Flowsheet Design Using Flotation Rate, Selectivity and RTD Data

    By Manqiu Xu, Peter Wells, Gord Bacon

    "A methodology is proposed for milling flowsheet design using flotation rate, selectivity and residence time distribution data. The flotation rate data and the difference in flotation rates between th

    Jan 1, 2005

  • SAIMM
    1.1 Kenyon

    Standards And Laboratory Monitoring In Gold Assay Key Components Of Best Practice

    Jan 1, 2005

  • CIM
    Development of Corrosion-Resistant Low Alloy Steels for Commercialization

    By B. Voyzelle

    The deterioration of highway and bridge infrastructure has received considerable attention in recent years because of the billions of dollars needed for repair and rehabilitation. A major factor contr

    Jan 1, 2005

  • CIM
    A Personal View of the Nickel Industry in Australia - Where Have We Been and Where are we Going?

    By J. H. Canterford

    The nickel industry in Australia has followed the general pattern apparent in many other regions - lots of ups and downs, successes and failures, but always plenty of challenges. Some of these can be

    Jan 1, 2005

  • CIM
    The single train ultra reformer - an integrated catalytic design approach to PEMFC-quality hydrogen production

    By P Hulteberg

    In this article, an integrated catalytic reactor design approach to produce PEMFC-quality hydrogen is evaluated. The design is based on a high level of heat exchanging perfonned internally, highly act

    Jan 1, 2005