Hard Rock Tunnel Boring in Challenging Conditions at the Jefferson Barracks Tunnel - NAT2022By Doug Harding
The Metropolitan St. Louis Water District’s Project Clear is a 28-year program targeting wastewater capacity throughout St. Louis, MO. The extensive program includes the Jefferson Barracks Tunnel, run
Dec 1, 2022
-
Built to Last? A UK Initiative to Manage Tunnel Infrastructure - NAT2022By Martin Knights
The UK Industry is preparing a new guide on Tunnel Asset Management that reflects current industry advances, in developed technological innovation and evolving tunnel asset owner requirements. This wi
Dec 1, 2022
-
The Northeast Boundary Tunnel—A TBM Performance Review - NAT2022By Elisa Comis, Jeffrey Peterson, Yama Ebrahimi
Construction of the Northeast Boundary Tunnel (NEBT), the last leg of the Anacostia River Tunnel System on DC Water’s Clean Rivers Project, started in September 2018 and was completed in April 2021. T
Dec 1, 2022
-
Design and Construction of NEORSD’s Doan Valley Storage Tunnel - NAT2022By Timothy O’Rourke, Karrie Buxton, Chris Lynagh, Daniel Dobbels, Frederick Vincent
The Doan Valley Storage Tunnel Project in Cleveland Ohio was constructed to control Combined Sewer Overflows (CSOs). It is a complex system of three tunnels ranging from 8.5 to 18 feet in diameter wit
Dec 1, 2022
-
Design and Construction of a Shallow Twin Tube Bifurcation— Atlanta Plane Train West Extension Project - NAT2022By John Murray, Daniel Ebin, Robert Gould, Yiming Sun, Lizan Gilbert
The Atlanta Plane Train Tunnel West Extension is being constructed at Hartsfield-Jackson Atlanta International Airport using the Sequential Excavation Method (SEM). The tunnel has shallow ground cover
Dec 1, 2022
-
Courthouse Commons Tunnel: A Case Study of Modern SEM Tunneling - NAT2022By Yiming Sun, John Stolz, Jakob Walter, Drew Mason
The Courthouse Commons SEM Tunnel was excavated within 6 feet of cover beneath two buildings in downtown San Diego utilizing high-precision geotechnical instrumentation. The excavated dimensions are a
Dec 1, 2022
-
Planning for Emerging Technology Underground Connection Between Rancho Cucamonga Metrolink Station and Ontario International AirportBy Mike Wongkaew, Brandon Kluzniak, Per Vilhelmsson
Rail access to Ontario International Airport (ONT) has long been a goal of San Bernardino County Transportation Authority (SBCTA) to increase public transit options to ONT and provide incoming ONT pas
Dec 1, 2022
-
Applications of Artificial Intelligence in Tunnel Design and Construction - NAT2022By Gunjan R. Bhattarai, Kumar Bhattarai
Recently, there has been an enormous increase of interest in artificial intelligence (AI), machine learning (ML), and their applications by researchers, government agencies, and the underground constr
Dec 1, 2022
-
Bridging the Gap—From Borehole Spacing to DSC Claim Resolution - NAT2022By Kapila Pathirage, Michael S. Schultz, Gregory Sanders, Ulf G. Gwildis
Adequate understanding of the subsurface conditions along the alignment of a planned tunnel is key for managing project risk. For achieving this understanding, geotechnical borings are conducted durin
Dec 1, 2022
-
Breaking Conway’s Law: Getting the Benefits from Integrated Design Automation - NAT2022By David Wright, Jerome Chamfray, Anthony Harding, Brian Boye
Conway’s Law states that unless we intentionally design automation tools around what we need, we will simply replicate our existing processes. While we may achieve some savings this way, there is an o
Dec 1, 2022
-
Slurry Treatment Plants in Mechanized Tunneling Operations— Safety, Performance and Cost Factor for Jobsites - NAT2022By Gino Vogt
In mechanized tunnelling operations, performance, consumption and safety are main factors for jobsites. One of the most important components effecting these factors, especially in slurry TBM operation
Dec 1, 2022
-
The State of DRB’s in the Tunnel Industry - NAT2022By David Hatem, Michael Vitale, Joseph Gildner, Michael Roach, Fred Dunham
Dispute Review/Resolution Boards (DRB’s) are a highly successful dispute avoidance and resolution tool. In a joint effort between the UCA of SME and the Dispute Resolution Board Foundation (DRBF), the
Dec 1, 2022
-
Historic Rock Tunnel Rehabilitation—Designing for the Unknown - NAT2022By Ryan Marsters, Adam Pring, Robin Dornfest
Raw water supply in the central Rocky Mountains often relies on trans-basin conveyance. Many of these older diversions incorporate high-elevation, miles-long tunnels driven over a century ago in hard
Dec 1, 2022
-
The IPMI Journal 2022By IPMI Educational and Scientific Foundation
It is with great pleasure that we announce the availability of this fourth issue of the IPMI Journal, a publication of the International Precious Metals Educational and Scientific Foundation. This dig
Dec 1, 2022
-
Mechanized Tunneling in Flowable River Sands—The TBM Drives of the Annacis Island WWTP New Outfall System - NAT2022By John Newby, Edward Kennedy, Ulf Gwildis
Alluvial deposits of major rivers often provide relatively uniform tunneling conditions. However, these conditions pose specific challenges due to the tunneling behavior of the granular soils as flowi
Dec 1, 2022
-
Flow Control in Tunnels - NAT2022By Darold Woodward, Stefan Haydn, Petr Pospisil
Most fatalities in tunnel fires are caused by the spread of toxic smoke. Controlling the spread of smoke is crucial to provide a survivable environment for emergency egress. A properly designed and tu
Dec 1, 2022
-
E-Power Pipe®: Two-Stage Trenchless Method for Long Drives in Small Diameters - NAT2022By Peter Schmäh, Tobias Engel
The E-Power Pipe technology was originally developed for the trenchless installation of protective pipes and pipelines of 10" to 28" diameter, over long distances of more than 4,000 ft. The twostage p
Dec 1, 2022
-
The Machine Within a Machine: TBM Innovation in Vancouver, British Columbia, Canada - NAT2022By B. Catalano, D. Ifrim
The Annacis Island Outfall Project includes two TBM bored tunnels with face pressures above 3.5 bar, with an internal diameter of 4.2 metres. This paper discusses the innovative approach to TBM tunnel
Dec 1, 2022
-
Updating the GBR Gold Book - NAT2022By David Hatem, Paul Madsen, Daniel Adams, James Morrison, Randall Essex
Managing commercial risks associated with subsurface construction may be the greatest challenge the underground industry faces. The Geotechnical Baseline Report (GBR) was developed in the U.S. to help
Dec 1, 2022
-
Automation in Segment Production and Integration of Artificial Intelligence - NAT2022By Stefan Mede
Automation in segment production doesn’t necessarily mean the use of robots. Several other aspects of automation in the process are available. Herrenknecht has collected many experiences in the automa
Dec 1, 2022