Search Documents

Sort by

  • IMPC
    Bioleaching Performances Comparison Between a Series of Mechanically Agitated Tanks and a Bubble Column (c65c1c77-589b-410b-821a-7910f3ed8f98)

    By Morin D. H., Battaglia-Brunet F., D'Hugues P.

    "In the mineral-processing field, bioleaching of metal sulphide concentrates is currently operated in very large mechanically agitated tanks. Such bioreactors have considerable requirements in terms o

    Jan 1, 2003

  • SME
    Plant Design, Practice Conference Attracts Processing Specialists

    By William R. Yernberg

    The Mineral Processing Plant Design, Practice and Control Conference was held from Oct. 20through 24, 2002, at the Fairmont Hotel, Vancouver, British Columbia, Canada. The conference was attended by

    Jan 1, 2003

  • TMS
    Process Design and Optimization for High-Temperature Vacuum Carburizing

    By X. Jay Gao

    A fast high-temperature carburizing process integrated with materials design and optimization via a systems design approach was developed to significantly reduce process cycle time. Process experimen

    Jan 1, 2003

  • AUSIMM
    Modelling of Universal Mining Technological Process

    By I Kolomaznik

    Each technological process can be reduced on the transport networks, and namely on the parametric networks and the non-parametric ones. The parametric networks are created by the piping, electrical ca

    Jan 1, 2003

  • IMPC
    The Western Cape Mineral Processing Facility (6ce87ab7-cec6-4e3c-92ea-d76440232f3d)

    By Dave Deglon

    The Western Cape Mineral Processing Facility (WCMPF) is a collaborative educational initiative between the Departments of Chemical Engineering of the University of Cape Town, the University of Stellen

    Jan 1, 2003

  • AUSIMM
    Case Study ù Final Closure Water Balance of a Tailings Impoundment Using Direct Vegetation

    By N Currey, G W. Wilson, P Ritchie

    Kidston Gold Mine in Queensland, Australia has a 310 ha tailings impoundment that has undergone final closure rehabilitation. Kidston Gold Mine evaluated their closure options for this low acid genera

    Jan 1, 2003

  • AUSIMM
    Highlighting Project Risk Following Completion of the Feasibility Study

    By C Gypton

    This paper gives some insights into what to look for when reviewing feasibility studies. The review by a third party is an important element of the risk management process and may be the last remainin

    Jan 1, 2003

  • AUSIMM
    Water Flow in Uncovered Waste Rock ù A Multi-Year Large Lysimeter Study

    By L Smith, R Beckie

    An intermediate scale (8 m + 8 m + 5 m high) constructed waste rock pile experiment was built upon a contiguous grid of 16 gravity drainage lysimeters to investigate the flow of water in unsaturated w

    Jan 1, 2003

  • TMS
    A Microstructure Evolution Model Used For Hot Strip Rolling

    By Richard A. Shulkosky

    The American Iron and Steel Institute (AlSO, in conjunction with the U.S. Department of Energy (DOE) jointly funded the development of a mechanical properties model for Hot Strip Mills. INTEG process

    Jan 1, 2003

  • IMPC
    Grinding Mills: How to Accurately Predict Their Power Draw

    "The first 90 years of the last century generated a considerable volume of technical literature on the subject of grinding mill power and its prediction. It is therefore surprising that during this ti

    Jan 1, 2003

  • SME
    Market Access Through Transportation Efficiency

    By J. M. Barker

    The concept of global-market access through transportation efficiency is a concept whose time has come. The basis of this approach is customer satisfaction—the higher the better. But beyond what seems

    Jan 1, 2003

  • TMS
    Interfacial Area In Pyrometallurgical Reactor Design (ab8c7594-3864-41b4-b282-17535b9f1242)

    By G. A. Brooks

    Increasing interfacial area through gas injection is one of the main methods for accelerating reaction between slag, metals, and gases in modern pyrometallurgical reactors. In slag-metal reactors, the

    Jan 1, 2003

  • TMS
    Copper Converting Versus Steel Converting A Critical Comparison (Invited)

    By Lauri Holappa

    Copper converting is mostly performed in Peirce-Smith converters. The process is still very similar to the original one developed in the early 20th century. It is a batch process in a horizontal cylin

    Jan 1, 2003

  • SME
    Price Assumptions for Reserve Estimation

    By David Humphreys

    Assumptions about future commodity prices need to be made with close regard to the purposes for which they are being used. Prices generated for financial planning or trading purposes are unlikely to b

    Jan 1, 2003

  • DFI
    Helical Foundations And Tiebacks: Quality Control, Inspection And Performance Monitoring

    By John S. Pack

    The last 25 years have seen rapid expansion in the use of helical screw pile foundations and tiebacks for new and retrofit construction of buildings and earth retention structures. An estimated $100 m

    Jan 1, 2003

  • SME
    What A Mineral Processor Needs To Know About Metal Chloride Pyrohydrolysis, And Why!

    By E. Sehner, G. Van Weert

    Metal chloride pyrohydrolysis is a fifty year old technology, operating satisfactory in many plants around the world, mainly on ferrous chloride, The capabilities and costs of its two equipment option

    Jan 1, 2003

  • TMS
    Utilization of an Equilibrium Calculational Program to Demonstrate the Hydrometallurgical Treatment of Mercury Wastes

    By Hsin H. Huang

    Equilibrium calculational software programs can be effectively utilized to model the importance of activity or concentration, solubility, temperature, solution pH, solution potential, and ligand compl

    Jan 1, 2003

  • IMPC
    Model Predictive Control in the Minerals Processing Industry (5f227471-d147-46e3-b94b-02751537edb1)

    By Vincent C. Smith, Agit Singh, Bernard Muller

    The control of minerals processing plants is by no means trivial. In order to address some of the difficulties, it was decided to develop and test a model predictive controller (MPC) for a milling cir

    Jan 1, 2003

  • CIM
    Chapter 2. The Courts, the Law and Litigation

    By Karl J. C. Harries

    "2.1. INTRODUCTIONNo agreement can be perfect in the sense that it contemplates and provides for all eventualities. Mineral acquisition agreements are usually negotiated and drafted at a time when an

    Jan 1, 2003

  • TMS
    Detailed Mathematical Modeling Of Liquid Metal Streamer Formation And Breakup (Invited)

    By Adam Powell

    A Cahn-Hilliard phase field model is formulated to describe transport-limited electrochemical reactions coupled with fluid flow in a metal reduction cell. When the reaction is limited by mass transfer

    Jan 1, 2003