Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Diesel Particulate Matter –So What’s The Big Deal?By E. A. Metz
Perfect combustion in an engine would produce only water vapor, carbon dioxide and nitrogen as by-products; however, complete combustion is never achieved. As a mobile power plant, the diesel engi
Jan 1, 2001
-
Flash Furnace OptimizationBy W. G. Davenport
A flash furnace can be run many different ways. It can, for example, be operated with: (a) highly 02"enriched, ambient temperature blast and no fossil fuel (b) considerable fossil fuel and hot, sl
Jan 1, 2001
-
An Analysis of Blasting Profitability and ProductivityThe mining industry is quite often faced with declining selling prices for its products in the face of rising prices for the input cost resources that it uses. Blasting is a key activity within the mi
Jan 1, 2001
-
Economics and Production of Primary Titanium by Electrolytic WinningBy Marco V. Ginatta
Current world production, 60'000 ton/y, is exceedingly too small for titanium's extraordinary combination of favorable properties; it should be 1,000,000 ton/y (7% of stainless-steel). Pric
Jan 1, 2001
-
Low-Temperature Roasting of Ilmenite ù Phase Chemistry and ApplicationsBy C Li
Removal of gangue minerals from ilmenite concentrates can be accomplished by relatively low temperature roasting in controlled gas atmospheres to selectively enhance the magnetic separation characteri
Jan 1, 2001
-
Outokumpu Flash SmeltingBy W. G. Davenport
Chapter 1 showed that flash smelting is a key step in extracting copper from sulfide ores. It also showed that there , are two versions of flash smelting: (a) Outokumpu flash smelting, which uses ox
Jan 1, 2001
-
Micro-Macro Modeling of Solidification Processes and PhenomenaBy Vaughan R. Voller
"The wide range of length and time scales found in solidification processes are outlined and discussed. Methods for Direct Microstructure Simulation (DMS) are introduced. Key features in sharp interfa
Jan 1, 2001
-
Design and Construction of a Multiple-Drift Subway Underpinning Structure for Boston’s Central Artery/Tunnel ProjectBy Robin B. Dill, Mark Pelletier, Daniel J. Dobbels, Subodh Bhaumik, Daniel J. VanRoosendaal
Although primarily cut-and-cover excavations are required for replacement of the existing elevated I-93 interstate highway through the heart of Boston for the Central Artery/Tunnel (CA/T) project, som
Jan 1, 2001
-
Presentation #7 - Bi-Directional Static Load Testing - Load Testing High Capacity Piles What Have We Learned?By Jorj Osterberg
550 load tests of up to 150 MN have been completed on driven and bored piles using the Osterberg Load Cell. Because the test measures side shear and end bearing separately, much can be learned about t
Jan 1, 2001
-
TPM (Total Productive Mining)By G. Budge
In the extractive industry the term ‘continuous improvement’ (CI) usually means procurement of the latest state of the art equipment. This is generally perceived as the only way to add further value
Jan 1, 2001
-
Fragmentation Assessment Using the FragScan System: Quality of a BlastBy B Tessier
Checking the quality of a blast may be considered as subjective. Checking this quality will require measuring objective parameters. One of them is the resulting fragmentation of the blasted product. N
Jan 1, 2001
-
Engineering Tools for Design, Analysis and Information Management Applied to Underground Drilling and BlastingBy D La Rosa, G Power, K Riihioja
In underground mining, the often unpredictable variability in ground conditions may lead to the application of suboptimal drilling and blasting patterns, resulting in poor performance. Experience and
Jan 1, 2001
-
Flash Furnace ControlBy W. G. Davenport
This chapter demonstrates how our matrices can be used for controlling a flash furnace. Specifically, it shows how we can determine the adjustments in industrial oxygen, air, oil and flux input rates
Jan 1, 2001
-
Gold Deposits, Exploration Realities, and the Unsustainability of Very Large Gold ProducersBy H. R. Bullis
"Abstract- This paper discusses what appears to be a flaw in the current belief, widely held within the gold mining industry and investment community, that the creation of ever-larger gold mining comp
Jan 1, 2001
-
Flash SmeltingBy W. G. Davenport
Flash smelting is used. mainly for making molten Cu-rich matte* from fine Cu-Fe-S** flotation concentrates. It blows dried concentrate particles into a hot fumace, surrounds them with 01-rich gas and
Jan 1, 2001
-
Internal Investigations And Preventive Safety Audits: You Are What You DocumentBy L. E. Beverage, K. L. Johnston
This paper will address methods for minimizing liability and protecting materials from disclosure as result of self- evaluative audits and internal investigations. Specifically, the paper will cover
Jan 1, 2001
-
Asarco Mineral Creek TunnelBy Shane Yanagisawa
The Mineral Creek Diversion Project is at the Asarco Ray Mine Complex, about128 km (80 miles) east of Phoenix, Arizona. The new tunnel will intercept the waters of Mineral Creek about 2,134 m (7,000 f
Jan 1, 2001
-
Hot Blast Autothermal Smelting to 65% Cu MatteBy W. G. Davenport
Most pre-t 988 Outokumpu flash furnaces were built with blast heaters. Many continue to use them. Blast temperatures in these smelters· are typically 400 to 700 K (Table 2. 1) This chapter: (a) sho
Jan 1, 2001
-
Grinding Control Strategy On The Conventional Milling Circuit Of Palabora Mining CompanyBy B. J. du Plessis
Automation of the conventional grinding circuits of Palabora Mining Company (PMC) required that adequate instrumentation and a control system had to be put in place, after which extensive testing had
Jan 1, 2001
-
Estimation of Flyrock Travel Distances: A Probabilistic ApproachBy M F. L Gibson
The issue of flyrock is very important in the operation of all mineral extraction sites that use blasting. Unlike the other environmental effects of blasting, ground vibrations and air overpressure, f
Jan 1, 2001