    Geology‑Oriented Load Estimation Approach for Underground Coal Mines (Mining, Metallurgy & Exploration)

    By Ihsan Berk Tulu, Haochen Zhao, Deniz Tuncay

    This paper proposes a new method to estimate the percentage of load carried by the gob in underground coal mines using a new parameter that introduces the site-specific overburden geology. The new par

    Jul 18, 2022

  • SME
    Predicting and Optimising the Strength of Cemented Paste Fills

    By Kanhaiya Mishra, Phanil. K. Mandal, S. K. Behera, P. S. Paul, Prashant Singh, C. N. Ghosh

    The techno-economic and social benefits of cemented paste backfill (CPB) resulted in its wide acceptance by the mining industry. The Ordinary Portland Cement (OPC) remains the key binder but to dimini

    Jul 14, 2022

  • SME
    Study on Mine Tailings Classification Effected by Co‑disposal of Drilling Wastes with Geochemical Cations

    By J. Stawovy, A. Fourie, J. D. Quaranta

    Coal refuse impoundments are disposal facilities specifically designed for the coal mining industry. Re-purposing refuse impoundments for co-disposal with natural gas flowback water and waste rock ove

    Jul 5, 2022

  • SAIMM
    Costs and benefits of fit-for-purpose sampling solutions

    By T. Bruce, R. C. A. Minnitt

    Mining operations are generally reluctant to install high-cost sampling systems at operations that have been functioning for many years. The principal objection to installing appropriate equipment to

    Jul 2, 2022

  • SAIMM
    A review of readiness assessments for mining projects

    By H. Mulder, M. C. Bekker

    The objective of this paper is to describe the research followed in creating a generalized, readiness assessment tool for mining projects. We start by highlighting the need for the assessment tool and

    Jul 2, 2022

  • SAIMM
    Optimizing cut-off grade considering grade estimation uncertainty – A case study of Witwatersrand goldproducing areas

    By C. C. Birch

    Due to grade estimation uncertainty, two statistical errors can occur. The Type I error is where material is classified as ore and mined, despite the true value being below the break-even grade. This

    Jul 2, 2022

  • SAIMM
    Quality control in tailings resource exploration at Havelock Mine, Eswatini

    By S. Gan, E. van Niekerk, L. Birrell, D. Robbertze, L. Ncubi, B. Zhao

    Quality assurance and quality control (or QAQC) plays a key role in safeguarding the level of confidence of the data generated during mineral exploration and mine development, and is also part of the

    Jul 2, 2022

  • DFI
    Long, High-Capacity Ground Anchors for Soldier Pile Walls

    By Bryan Bet

    Retaining wall systems of soldier pile ground anchors (SPGAs) have been used for many decades to stabilize landslide activity. Due to successful use of these walls to address slope instability on the

    Jul 1, 2022

  • AUSIMM
    Wall control blasting – the influence of engineering geology on blast design

    By T N. Little

    This paper is concerned with the influence of engineering geology on design of Wall Control Blasts. In the Introduction, the Blast Management Framework and the Blast Design Requirements classification

    Jun 22, 2022

  • AUSIMM
    How innovation trumps isolation, one mine at a time

    By J Pearce, R Ramanathan

    hortly after the World Health Organization declared COVID-19 a pandemic, the words ‘social distancing’ entered the global lexicon. The effects on the public of social distancing, lockdowns and travel

    Jun 22, 2022

  • AUSIMM
    Strategic short-term geotechnical design

    By K T. Mandisodza, T J. Cartledge

    The principal objective of Geotechnical Engineers supporting operating mines is to provide safe working conditions and ensure that pit designs are geotechnically optimised to site conditions and pre-d

    Jun 22, 2022

  • AUSIMM
    Learning from and managing a significant saprolite instability

    By M Bouare, C Holland, K N’Diaye

    Two adjacent open pits in Mali hosted by deeply weathered saprolitic materials were mined consecutively over the course of approximately 12 months. During excavation, both pits experienced significant

    Jun 22, 2022

  • AUSIMM
    Quantifying iron ore ‘handleability’ to reduce processing plant delays

    By P Cherepanskiy, G Elphick, R Hus, C Perring

    When an iron orebody nears its end of life, the extracted material can become increasingly problematic to handle. Higher moisture content occurs as larger portions of originally-below-water-table mate

    Jun 22, 2022

  • AUSIMM
    Re-defining Compliance Planning through data integration and ultra-short-term scheduling

    By C Fong

    Compliance Planning is an active approach to ensure mining operations align more closely to their longer-term plans. Through Compliance Planning, operations can not only measure their performance on i

    Jun 22, 2022

  • AUSIMM
    Applying control frameworks to enhance vehicle interaction technology outcomes

    By P Standish

    Qualitative risk assessment methods are not well suited to considering complex systems and potential interactions of new technology. As part of supporting tier one mining organisations and internation

    Jun 22, 2022

  • AUSIMM
    Back analysis of pit slope performance in a saturated alluvial sediment

    By J Player, G Sweby

    The material properties and hence performance of saturated alluvial sediments slope can be incorrectly forecast if the water content is not preserved, and materials properties not correctly determined

    Jun 22, 2022

  • AUSIMM
    The use of collaboration and management to turn-around the performance of a failing copper mine

    By M Jacobs

    This abstract discusses a heap leach copper mine that was failing to perform and as a result was not meeting targeted production. The mine had numerous technical challenges including: high water inflo

    Jun 22, 2022

  • AUSIMM
    A tailored solution to determine plant capacity using strategic analysis

    By J Nortier, J Dray

    There is no single factor that determines the appropriate capacity for a mining project. It is driven by the size of the resource, the capacity of the market, the availability of capital, the availabi

    Jun 22, 2022

  • AUSIMM
    The role of fleet management in reducing carbon emissions from haul trucks

    By D Prior

    The Australian mining industry is a significant contributor to the nation’s greenhouse gas (GHG) emissions, and like any industry, it must make efforts to reduce these. Medium- and long-term strategie

    Jun 22, 2022

  • AUSIMM
    Transition from owner mining to contract mining – a structured tender process using a holistic approach

    By Y G. Anoman

    This paper discusses the operating model within Endeavour Mining Corporation regarding the options of owner mining against contract mining. It’s based on the concept of ‘are we carrying out the most e

    Jun 22, 2022