Search Documents

Sort by

  • SME-ICGCM
    Progression of Longwall Gateroad Support as Conditions Change at Lodestar Energy's Baker Mine

    By David Miller

    Longwall gateroad support can be supplied by a variety of methods. The system of support also needs to be flexible as conditions change. This is especially true in the complex geological conditions of

    Jan 1, 1998

  • SME
    Geology Of Wyoming's Powder River Coal Field

    By G. B. Glass

    In 1996, 92.5% or 233 Mt (257.4 million st) of coal produced in Wyoming came from the Wyodak coal zone in the eastern Powder River Coal Field. While the mined portions of the zone consist of one to th

    Jan 1, 1998

  • SME
    Powder River Basin: Mother Lode Of The Nation's Compliance Coal

    By L. Alan Weakly

    The Powder River Basin of northeastern Wyoming and southcentral Montana contains the largest strip minable reserve of compliance coal (0.27 kg or 0.6 or less Ibs of sulfur per million Btu) in the Unit

    Jan 1, 1998

  • SME
    Twentymile Coal's East Mine District Panel Conveyor Systems

    By P. K. Sollars, M. A. Alspaugh

    In May of 1996, Twentymile Coal Co. began Longwall mining in the Foidel Creek Mine's East Mine District. These Longwall panels are some of the longest in the world (5.48 km/18,000 ft) with very d

    Jan 1, 1998

  • SME
    Identification Of Sources And Interception Of Water Inflow At P.T. Freeport Indonesia's IOZ Block Cave Mine

    By D. A. Bird

    Water chemistry data were used to identify the sources of ground-water and surface-water inflow to the IOZ block cave mine. Water samples were collected to obtain vertical and lateral hydrochemical pr

    Jan 1, 1998

  • TMS
    Metallurgical Gas Cleaning Effluent Decontamination' And Acid Recovery

    By D. W. Lawler

    Prior to the manufacture of sulphuric acid in metallurgical plants, the SO2 rich gas from the smelter, roaster, or furnace must be cleaned to removed particulates, volatile contaminants, SO3, and wate

    Jan 1, 1998

  • SME
    Preparation Of Environmental Impact Study (EIS) And Environmental Adjustment And Management Program (PAMA) Guidance Documents For Peru's Ministry Of Energy And Mines

    By R. L. Kloberdanz

    Peruvian legislation requires the preparation of an Environmental Impact Study (EIS) for new and expanding mines/beneficiation facilities and the preparation and implementation of an Environmental Adj

    Jan 1, 1998

  • SME
    Today's Technology for Conveyor Drive Controls

    By J. A. Ehler

    Speed and torque control of standard A.C. induction motors can be accomplished using a variety of devices ranging from mechanical, hydraulic, and electrical. Also, the motor can be specified as an A.C

    Jan 1, 1998

  • SME
    If You're Not Using Predictive Tools, You're Behind the Curve

    By Jerry Williams

    GEORGE WEINMAN: At this time, our co-chair, Jamie Davis from Phelps Dodge, will come to the podium. JAMIE DAVIS: Our next speaker is Jerry Williams from Phelps Dodge, Morenci. Jerry is the mainten

    Jan 1, 1998

  • SME
    Heap Leach Pad Design Criteria Examples Of Design Nomographs

    By Donald R. East

    There has been an increasing trend in recent months by regulatory agencies to require that estimates be made of the hydraulic head acting, under operational conditions, on the surface of primary leach

    Jan 1, 1998

  • SME
    Engineering, Operating And People (Humorous) Lessons To Be Learned

    By Kathleen A. Altman

    INTRODUCTION The basic premise of the ideas presented in this paper are as follows: Engineers believe that "theoretically" it will work. Operators ask what they must do to make it work. And, people c

    Jan 1, 1998

  • SME
    Enhanced Gold Recovery During Heap 810-detoxification At Cripple Creek And Victor Mining Company

    By C. S. Caldwell, L. C. Thompson

    Mine closure and reclamation issues have evolved over the past several years becoming further complicated by stricter standards and by the cmrent economic climate and price of gold. Many mine permits

    Jan 1, 1998

  • SME
    Turnkey Projects

    By Michael Mccorkle

    The Turnkey Project contracting approach is a very viable project delivery system for many mine and mill owners. Generally speaking, the Turnkey Project approach makes sense when the owner knows what

    Jan 1, 1998

  • AUSIMM
    Recent Developments and Trends in Backfill in Canada

    By J Nantel

    Planning of modern mines entails considerable challenges in the areas of ground control, materials handling, safety, environment, equipment and personnel. Many orebodies are not economical unless e

    Jan 1, 1998

  • AUSIMM
    Numerical Simulation of the Drainage in a Mining Stope Filled with Hydraulic Bakcfill

    By Servant S

    In the mine of this study, cemented hydraulic backfill is placed under the form of a slurry at a percentage of solid by weight varying from 50 to 65 per cent. This slurry settles and cures in the st

    Jan 1, 1998

  • AUSIMM
    Design and Operation of Backfill for Reliable High Solids Concentration Discharge

    By A G McLean

    This paper will first discuss the fundamental requirements for reliable discharge of backfill by gravity alone at high per cent solids. This discussion will include brief mention of the underlying p

    Jan 1, 1998

  • SME
    Waste Clay Ponds In Florida-Regulatory Status Report

    By S. Partney

    Waste clay ponds are a necessary part of the phosphate rock beneficiation process. They are large, averaging a square mile in size; unsightly, in that they protrude 20 to 50 feet (6 -15 meters) above

    Jan 1, 1998

  • SME
    Metal Recovery Aids In Heap Leaching Appucations

    By James H. Nulty, Joseph S. Roti

    Wetting agents used for heap leach gold applications would appear to have technical merit in aiding in recovering higher levels of precious metal. Many questions, however, remain as to whether they wi

    Jan 1, 1998

  • SME
    Ilvipact Of Top Management Phil.dsophy On Heap Leach Design

    By R. Bruce Thorndycraft

    Heap leaching should not be chosen for development of a property solely on the basis of paper studies. Management should be made to understand where the risks are in heap leaching, and management shou

    Jan 1, 1998

  • AUSIMM
    From Green Field Site to Block Cave Mine - Results of Northparke's Drill and Blast Design Process

    The green field site is one that has no history of mining and as such it presents the designer with a blank canvas, on which any number of drill and blasting options can be drafted. No matter which mi

    Jan 1, 1998