Implementation of Kalman Filtering Techniques for Filtering CPT Cone Tip MeasurementsBy Gerald Verbeek, Erick Baziw
Cone penetration testing (CPT) is a popular and cost effective tool for geotechnical site characterization. CPT consists of pushing at a constant rate an electronic penetrometer into penetrable soils
Sep 8, 2021
-
Incorporating Site Variability into LRFD Design of Pile FoundationsBy Murad Y. Abu-Farsakh, Md Habibur Rahman
The properties of all natural soil deposits are highly variable, and they are rarely homogeneous. Cone penetration tests (CPT) were used to assess the site variability, which was then incorporated in
Sep 8, 2021
-
Three-Dimensional (3D) Limit Equilibrium Method (LEM) Comparative Study of a Landslide Case Study Supported with PilesBy Terence Ma, Seok hyeon Chai, Jeff Lam, Thamer Yacoub, Brigid Cami, Sina Javankhoshdel
The Limit Equilibrium (LE) analysis of pile-supported geotechnical structures normally assumes a constant shear force for the pile instead of considering the non-linear capacity of the pile which is r
Sep 8, 2021
-
Top-Loaded Bi-Directional Test and the Conventional Bi-Directional Load Test, a Direct ComparisonBy Patrick J. Hannigan, Seth Robertson, Frank Rausche, Rozbeh B. Moghaddam
The Top-Loaded Bi-Directional Test (“TLBT”) and the conventional Bi-Directional Load Test (“BDLT”) are full-scale load tests where loads are applied bi-directionally to the foundation element. The BDL
Sep 8, 2021
-
Top-Loaded Bidirectional Test, a New Approach to Deep Foundations Load TestingBy Patrick J. Hannigan, Frank Rausche, Rozbeh B. Moghaddam
The Top-Loaded Bi-Directional Test (“TLBT”) is a new method to apply bi-directional loads to a deep foundation element with the loading source located above the foundation head. In the TLBT reusable l
Sep 8, 2021
-
Replacement Bored Piles for the Houphouet-Boigny Bridge, Cote D'ivoireBy Adrian Mercer, Ashkan Ameri
Due to general degradation, increased traffic levels, and historical ground movement, this road and rail bridge which provides an essential link between the interior of the country and the Port of Abi
Sep 8, 2021
-
Design and In-Construction Geologic Characterization of Micropiles to Support a Historic Transmission Line Upgrade in the Steep Talus and Basalt Slopes of the Columbia River GorgeBy Brian J. Olson, Kevin Haiar
Originally constructed between 1939 and 1941 as part of Franklin D. Roosevelt’s New Deal programs, the Bonneville to Hood River 115 kV Transmission Line required an infrastructure upgrade to remain re
Sep 8, 2021
-
Ground Improvement Using Compaction Techniques on Calcareous Sands and Verification Tests ProceduresBy Vijaya Bhushan Rao, Jason Redgers
A mixed-use development comprising of multistoried residential towers, retail and associated infrastructure covering an area of 500,000 m2 is under construction in Dubai. The subsoil conditions consis
Sep 8, 2021
-
3D FEM Modelling of a Ground Improvement SolutionBy Yazen Khasawneh, Osvaldo P. M. Vitali, John E. Agee, Mohammad Nassim
A 3D FEM modeling of a ground improvement solution for an ice rink slab with stringent differential settlement limits is presented. Due to the complexity of the geotechnical conditions and strict defo
Sep 8, 2021
-
A DC Electrical Resistivity Method for Jet Grouting Column Diameter Quality Control with Case Studies from Grand Paris ProjectBy Sina Z. Yekta, Zhangwei Ning, Pierre Frappin
This paper describes a DC (direct current) electrical resistivity method, which uses the contrasts in resistivity measurements to estimate the diameter of jet grouted columns as soon as they have been
Sep 8, 2021
-
Comparing Conflicting Conclusions from Different Integrity Testing Methods on the Same Drilled ShaftsBy Alex Ryberg, Matthew L. Becker
Several integrity testing methods exist which may be used to evaluate drilled shafts. Each test method has advantages and limitations. On occasion, the results from different test methods may lead to
Sep 8, 2021
-
Completely Automatized Recognition of the Installation Process in Special Foundation ConstructionBy Christian Hoyme, Jochen Maurer, Hans Regler
Up to today, it has been very difficult to obtain qualitative and quantitative information about the status and production process of a construction site. It is becoming more and more important to be
Sep 8, 2021
-
Constructing Tsunami Walls with Pressed-In Sheet and Pipe Pile Combi-WallsBy Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano
The city of Naruto in the southwestern part of Japan is situated at the mouth of the mighty Yoshino River. An approximately 1,000m-long levee/bulkhead along one of the river’s tributaries in the city
Sep 8, 2021
-
Construction of a Deep Slurry Cutoff Wall for the Sacramento River East Levee ProgramBy Louay Owaidat, Daniel Jabbour, Allan Frappier, Jose Gomez, Mark Stanley, Tino Maestas
The U.S. Army Corps of Engineers (USACE) is implementing a levee strengthening program along the Sacramento River East Levee (SREL) designed to correct 11 miles of deficient levees as identified by re
Sep 8, 2021
-
Controlling Thermal Stresses in Barrier WallsBy Karsten Beckhaus
Barrier walls in levees and dams are designed and constructed for new structures and for rehabilitation or upgrade of existing structures to control seepage. Construction methods applied are often dee
Sep 8, 2021
-
CPT Methods for Helical Pile DesignBy Howard A. Perko, Margaret Dring, Gerald Verbeek, Scott Slaughter
Helical piles have become a widely used deep foundation system in recent years due to their many inherent advantages. The cone penetration test (CPT) is commonly used in geotechnical practice to evalu
Sep 8, 2021
-
Cyclic Degradation on Wind Turbine Foundations in Cohesive SoilsBy Yazen Khasawneh, Osvaldo P. M. Vitali, Mohammad Nassim
Wind turbines are subjected to complex form of cyclic loadings with variable amplitudes and frequencies. The cyclic loading and the accumulation of plastic strains with the number of cycles will resu
Sep 8, 2021
-
Data Collected and Lessons Learned from Load Test Program for ACIP Piles Supporting Highway BridgesBy Reinaldo J. Villa, Joshua C. Adams
The I-395/SR-836/I-95 reconstruction project is an $818-million design-build construction effort that includes construction of viaduct, segmental and signature bridges in Miami leading into Miami Beac
Sep 8, 2021
-
Deep Soil Mixing Design and Construction for Surface Fault Rupture MitigationBy James R. Gingery, Byron Foster, Bret Lingwall
While microzonation and setbacks are the typical mitigation for structures exposed to surface fault rupture hazards, lifelines and lifeline facilities are not easily relocated to avoid faulting. In th
Sep 8, 2021
-
Design Methodology for Multi-Facetted, Winged Steel FoundationsBy Phillip E. Glogowski, N. Catherine Bazan-Arias
Steel foundations can be designed to cross-sectional configurations ranging from triangular and square to other multi-side shapes. Adding lateral extensions (hereby called wings) along the length of t
Sep 8, 2021