Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Exploration - First Step To A Mine - Methods And RequirementsAs knowledgeable men in the industry know, a mineral occurrence is found through prospecting but an ore deposit is "made" -made through, first, imaginative and effective exploration; thence through ef
Jan 10, 1967
-
Auxiliary Operations In Surface Mines - Electrical Apparatus And RequirementsElectrical requirements in surface mining can be divided into three categories: main substation, plant power, and pit distribution. A main substation may vary from a 500-kva transformer supplying 480-
Jan 10, 1967
-
Excavation And Loading – A Job For Giants – Stripping And Quarry-Mine ShovelsThere are two types of shovels currently used primarily as mining tools-the stripping shovel and the quarry-mine (Q-M) shovel. The two types have basically the same features, the main difference being
Jan 10, 1967
-
Haulage Methods Stress Speed, Capacity – RailroadFor handling rough rock, the shovel-train system is unexcelled. The ideal application is a physically large, but not excessively deep, open-pit mine from which the coarsely blasted ore and waste must
Jan 10, 1967
-
Surface Mining Continues To GrowThe history of surface mining is essentially that of mining coal, copper, and iron ores and the non- metallic minerals, i.e. clays, gypsum, phosphate rock, sand, gravel and stone. The accompanying tab
Jan 10, 1967
-
Maintenance - Key To Effective Operation – Equipment SchedulingIn any earth-moving operation, more profit may be earned or lost by equipment scheduling than by any other single facet of the project. Many now-defunct earth movers would have survived the cost-profi
Jan 10, 1967
-
Planning And Design - A Crucial Phase In Open Pits And Quarries - Pit Planning And LayoutKey elements of open-pit design fixing the ultimate pit limits are stripping ratio, pit slope angle, and grade cutoff. Results of exploratory and development drilling should be reduced to horizontal s
Jan 10, 1967
-
Drilling Selection Requires Value Judgments - Principles Of DrillingThe selection of a particular machine for production drilling is the most critical drill evaluation the pit engineer is called upon to make. It is a true engineering design problem requiring value jud
Jan 10, 1967
-
Blasting-Fragmentation Is The Measure - Blasting Theory And PracticeThe fundamentals of blasting involve both the properties of explosives and of the rock being blasted. Four of the most important explosive properties appear to be energy density, bulk density, rate of
Jan 10, 1967
-
Open-Pit Research And Development - Reporting And Evaluating R&DSome specific observations might be appropriate concerning the reporting of Research and Development results. Each report is usually directed towards a particular group, such as technical, operational
Jan 10, 1967
-
Recovery Of Molybdenite At ToquepalaBy L. C. De Jong, J. F. Shirley, M. L. Campbell
The Toquepala concentrator of the Southern Peru Copper Corp., located approximately 720 miles southeast of Lima near the Chilean border, processes 36,500 tons of ore daily containing between 0.50% and
Jan 9, 1967
-
Preventive Maintenance Of Control Equipment For ExcavatorsBy M. Safiuddin
Within the mining industry, open-pit mining has progressed to a point where a 200-yard walking dragline is as conceivable today as a 35-yard dragline was just a few years ago. This is possible due to
Jan 9, 1967
-
Crushing And Grinding The Experts View The Problems - Part IR. S. Shoemaker: Our first question is, is there a need for a grizzly before a primary crusher? What is its effect on crusher capacity and crusher maintenance? Is it worth the extra capital cost in a
Jan 9, 1967
-
Subsidence - A Real Or Imaginary Problem?By August E. Vandale
Mining of the Freeport and Pittsburgh coal seams in the Pittsburgh vicinity dates back more than 100 years, and Consolidation Coal Co., or its predecessor, Pittsburgh Coal Co., has been actively minin
Jan 9, 1967
-
Hydraulic Crane Used To Speed Roof Bolting At Goderich MineSifto Salt Div. of Domtar Chemicals Ltd. has developed a new method for installing roof bolts in the high backs of its 1-million-tpy rock-salt mine at Goderich, Ontario, on the east shore of Lake Huro
Jan 9, 1967
-
A Preliminary Economic Analysis Of The Underground Mining Of Minnesota TaconiteBy Eugene P. Pfleider, Jared Scofield
During the past ten years, the trend on the Mesabi Range has been toward the establishment of integrated operations which mine, concentrate, and pelletize the large reserves of magnetic taconite. Howe
Jan 9, 1967
-
Ocean Mining Faces Problems - Push In Oceanography May Yield SolutionsOceanographers are tooling up. Back of the build-up is Navy defense work and private business. Business is dipping toes in the ocean gingerly and not sure whether the motivation is based on logic or i
Jan 8, 1967
-
An Ore Grading Model For The Smallwood MineBy Erwin Zodrow, De Verle P. Harris
The Smallwood mine, owned and operated by the Iron Ore Co. of Canada, is one of the largest ore producers in Canada, producing about 15 million tons of crude ore per year. Located in the Labrador Trou
Jan 8, 1967
-
White Pine Experiments With Cyanide Leaching Of Copper TailingsBy V. Lessels, D. J. Buckwalter, D. H. Rose
At White Pine Copper Co.'s operation in the Upper Peninsula of Michigan, the company has been losing more than four lbs of copper in each ton of sand tailings. With an average rate of 12,000 tpd
Jan 8, 1967
-
Dust Collection In Coal Preparation PlantsBy D. T. King
In coal preparation plants, as in many industrial operations where raw materials are handled, nuisance, health, and equipment maintenance problems arising from the generation of dust are inevitable. D
Jan 8, 1967