Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Papers - Constitution of Copper-rich Copper-silicon-manganese Alloys. (T.P. 1418)By Walter R. Hibbard, Cyril Stanley Smith
IN 1929 one of the authors1 determined the constitution of copper-silicon-manganese alloys contailling over go per cent copper. Through a combination of circumstances the presence of the copper-silico
Jan 1, 1942
-
Virginia: 1835-1839The Enquirer of October 13, 1835 carried a letter signed "G," calling attention to the great number of Virginians who were leaving the state and to the lack of enterprise shown in not developing the
Jan 1, 1942
-
Mining And Reduction Of Enargite Ores At Lepanto, Mankayan, Philippine IslandsBy William G. [Peryam], Bishop Ottey M., Fred E. Johnson
THE Lepanto Consolidated Mining Company is the largest copper producer in the Philippines, and the only one that makes a concentrate valuable principally for its copper; also, it has the only producti
Jan 1, 1942
-
Title PageJan 1, 1942
-
A.I.M.E. Officers and DirectorsJan 1, 1942
-
ContentsJan 1, 1942
-
Foreword by Harry StolzJan 1, 1942
-
Petroleum Divisions Officers and CommitteesJan 1, 1942
-
The Anthony F. Lucas Fund and MedalJan 1, 1942
-
Production Engineering - Core Analysis-An Aid to Increasing the Recovery of Oil (T. P. 1487, with discussion)By James A. Lewis
It is the purpose of this paper to show the importance of sand characteristics, when combined with other physical data, in evaluating production obtained by secondary recovery operations, and to indic
Jan 1, 1942
-
Production Engineering - Electrical Resistivity Log as an Aid in Determining Some Reservoir Characteristics (T.P. 1422, with discussion)By G. E. Archie
The usefulness of the electrical resistivity log in determining reservoir characteristics is governed largely by: (I) the accuracy with which the true resistivity of the formation can be determined; (
Jan 1, 1942
-
Production Engineering - Possibilities of Secondary Recovery for the Oklahoma City Wilcox Sand (T. P. 1400, with discussion)By D. L. Katz
The Oklahoma City Wilcox sand, discovered on March 26, 1930, has produced 394 million barrels of crude oil and 819 billion cubic feet of natural gas as of July I, 1941. The 100,000-bbl. wells, pressur
Jan 1, 1942
-
Production Engineering - Sampling Gas-condensate Wells (T. P. 1374, with discussion)By J. M. Flaitz, A. S. Parks
OF the various methods of sampling gas-condensate wells, a method that secures a continuous representative sample of the well stream is desirable. Such a method, consisting of a sampling tube introduc
Jan 1, 1942
-
Production Engineering - Field Application of Core Analysis and Depth-pressure Methods to the Determination of Mean Effective Sand Permeability (T. P. 1464)By N. Van Wingen
EFFective sand permeabilities can be ascertained from core analysis if the laboratory data are compensated to allow for the presence of connate or residual water. Such adjustments can be made by apply
Jan 1, 1942
-
Production Engineering - Geology and Development of the Paloma Field, Kern County, California (T. P. 1471)By James T. Wood
Stratigraphy, structure and closure of the Paloma field are discussed, with some details regarding the present state of development. The Paloma anticline, a large dome modified by faults, is the large
Jan 1, 1942
-
Production Engineering - A Plan for Operation of the Paloma Field (T. P. 1472)By W. H. Geis
The following pages summarize the causes that led to the suggestion of unit operation of the paloma field, the organization of com-mittees, preparation of the Paloma Operators Agreement and the reason
Jan 1, 1942
-
Engineering Research - Effectiveness of Gravel Screens (T. P. 1325)By B. H. Sage, W. N. Lacey
The results of an extensive experimental program relating to the effectiveness of gravel screens have been correlated. The factors considered in some detail include gravel size and condition of packin
Jan 1, 1942
-
Engineering Research - Mechanism of Fluid Displacement in Sands (T. P. 1337)By M. C. Leverett, S. E. Buckley
The production of oil is accomplished as a result of its displacement from the reservoir by either gas or water, and the amount of oil recovery is limited by the extent to which the displacing gas or
Jan 1, 1942
-
Engineering Research - Control of Filtration Characteristics of Salt-water Muds (T. P. 1351, with discussion)By J. L. Foster, G. R. Gray, T. S. Chapman
The wall-building properties of salt-water drilling muds can be improved markedly by the addition of: (I) natural gums, such as traga-canth, karaya, and ghatti; (2) seaweeds, such as Irish moss; or (3
Jan 1, 1942
-
Engineering Research - Calculation of Theoretical Productivity Factor (T. P. 1352, with discussion)By H. H. Evinger, M. Muskat
A method has been developed whereby one may calculate the productivity factors of producing formations from a knowledge of the reservoir conditions. Account is taken not only of the heterogeneous char
Jan 1, 1942