Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Arsenic Trioxide From Flue Dust.By James Elton
THIS paper covers, besides laboratory work, a study of actual operation at the Washoe Smelter over a considerable period of time, together with the results of a visit to the Midvale plant of the Unite
Jan 8, 1913
-
Ore Deposits At Butte, MontBy Reno Sales
INTRODUCTION. THE geology of Butte possesses especial interest on account of the magnitude of the ore deposits, their extraordinary richness and persistence in depth. Since its discovery in the early
Jan 8, 1913
-
Timbering In The Butte Mines.By B. H. Dunshee
THIS paper is not intended to be a technical discussion of square-set framing as used in mines, but merely a short description of the different kinds of framing that have been used in the Butte mines,
Jan 8, 1913
-
Membership. (088f5ff1-92c1-4b65-9912-55e2d172c1a5)Due to the advanced date of publication of this Bulletin, the lists of new members, changes of address, etc., for the month of July will be printed in the September number of the Bulletin. CANDIDAT
Jan 8, 1913
-
Great Falls Converter Practice.By Archer Wheeler
The Boston & Montana Reduction Works at Great Falls, Mont., was formerly the reduction works of the Boston & Montana Consolidated Copper & Silver Mining Co., and continued as the reduction plant for t
Jan 8, 1913
-
Technical Committees' ActivitiesThe experience of the Committee in connection with securing papers for the Butte meeting in August has shown that authors should begin early on papers contemplated for the New York meeting next Februa
Jan 8, 1913
-
The Smelting Of Copper 'ores In The Electric Furnace.By Dorsey Lyon
I. INTRODUCTION. In presenting, this paper the writers wish to call attention first of all to the fact that the electric furnace was not developed as a competitor of the combustion furnace, but: 1.
Jan 8, 1913
-
Notes On The Electrolytic Refining Of Copper Precipitate Anodes. (dd6dc84e-9a22-400e-b0a6-f932db07baa2)By W. F. Burns
(Butte Meeting, August, 1913.) ATTEMPTS were made in 1908, at the Great Falls Works, to produce ingots direct from the Butte precipitate by smelting- the material in a reverberatory refining furnace.
Jan 7, 1913
-
Valuation Of Coal Land. (69f162b0-08c8-4882-9aea-3dc7269438a8)By H. M. Chance
(Butte Meeting, August, 1913.) ADEQUATE treatment of the difficulties surrounding the valuation of mineral lands requires that agreement be first reached defining value as understood for the purpose
Jan 7, 1913
-
The Metaline Plant Of The Inland Portland Cement Co., Metaline Falls, Wash. Metaline Falls, Wash.By Milo W. Krejci
(Butte Meeting, August, 1913.) THE plant and quarries of the Inland d Portland Cement Co.. are located- at Metaline Falls, Wash, about 128 miles north of Spokane, on the Fend Oreille river, and 10 mi
Jan 7, 1913
-
Shock Tests of Cast Steel.By John Hall
(New York Meeting, October, 1913.) THE Fremont test for measuring the energy consumed in breaking a notched bar of steel is not so well known in this country as it deserves to be. The test specimen u
Jan 7, 1913
-
Thermal Effect Of Blast-Furnace -Jackets.By Robert Roberts
(Butte Meeting, August, 1913.) IN order to obtain data on the thermal effect of the blast-furnace jacket and oil the water consumption in these jackets a series of tests were run on the 56 by 180 in.
Jan 7, 1913
-
Notes On The Electrolytic Refining Of Copper Precipitate Anodes.By W. F. Burns
(Butte Meeting, August, 1913.) ATTEMPTS were made in 1908, at the Great Falls Works, to produce ingots direct from the Butte precipitate by smelting the material in a reverberatory refining furnace.
Jan 7, 1913
-
The Reducibility Of Metallic Oxides As Affected By Heat Treatment. (0b03a972-43cb-44e0-8f29-72676e61f4f7)(Butte Meeting, August, 1913.) IN metallurgical circle it is. known widely, but somewhat vaguely, that the ease of reduction of metallic .oxides. depends largely on the way they have been prepared. I
Jan 7, 1913
-
Miscellaneous Announcements (cf3982a7-b235-4012-bfaa-7c3686111f81)Meetings of this committee were held at the Institute headquarters on April 18, May 2 and 15, and June 19. At the meeting of June 19, the Secretary reported that letters of invitation to apply for me
Jan 7, 1913
-
Special Notices (35da1bed-981e-469f-88a3-8d0e0a68646c)Advantages to Members of Our Advertising Section.-It is our intention to make the advertising section of the Bulletin as comprehensive as possible, so that members can turn to it for complete informat
Jan 7, 1913
-
Iron And Steel Committee (09c5fed5-2336-4336-8b50-2ddf969ae1f9)CHARLES KIRCHHOFF, Chairman. ALBERT SAUVEUR, Vice-Chair-man. A. A. STEVENSON, Vice-Chair-man. HERBERT M. BOYLSTON, Secretary, Abbot Bldg., Cambridge, Mass. John Birkinbine, J. Esrey Johnson, Jr.,
Jan 7, 1913
-
Roasting And Leaching Tailings At Anaconda, Mont. (b37ef3c3-981b-448d-8781-a7a5d1b823de)By Frederick Laist
(Butte Meeting, August, 1913.) WHILE remodeling No. 1 section of the concentrator at the Washoe Reduction Works of the Anaconda Copper Mining Co. during the summer of 1912, for the purpose of ascerta
Jan 7, 1913
-
Roasting. and Leaching Tailings at Anaconda, Mont.By Frederick Laist
(Butte Meeting, August; 1913.) WHILE remodeling No. 1 section of the concentrator at the Washoe Reduction Works of the Anaconda Copper Mining Co. during the summer of 1912, for the purpose of ascerta
Jan 7, 1913
-
Notes On The Metallography Of Refined Copper. (94acaab8-f2b0-476b-bd2d-208119134c46)By Earl Bardwell
THE structural relations existing between cuprous oxide and copper -were first systematically studied by Heyn1', who suggested that a study of the microstructure of refined copper might be substi
Jan 7, 1913