Search Documents

  • AIME
    Heat Treatment Of Rock-Drill Steel

    By George H. Gilman

    THE campaign now being waged to improve the quality of the rock-drill bit is the natural outcome f the scientific development of the drilling machine during the past twenty years. In this development

    Jan 6, 1921

  • CIM
    Environmental Relevance of the Leachate Potential for Dry Storage of Delayed Coke

    By Joseph L. Fournier

    Suncor Oil Sands employs delayed coking technology in converting bitumen into synthetic crude oil. Currently up to 10,000 m3 of delayed coke (coke) is produced per day as a byproduct of the upgrading

    May 1, 2011

  • SME
    Geology Of The Syncrude Mine Site And Its Application To Sampling And Grade Control (7f5d80e2-f9f1-41b4-8041-3d14a94ec21c)

    By Neil D. Donnell, O&apos

    Bituminous sands of the Lower Cretaceous McMurray Formation in northern Alberta constitute the ore for the surface mining operation at Syncrude Canada Ltd. These sediments represent a complex successi

    Jan 1, 1984

  • AUSIMM
    The Application of Operations Research to Some Technical and Management Problems

    ABSTRACTOperations Research and associated techniques have wide application in the Mining Industry and have been used in Mount Isa since 1961.Typical of the projects undertaken by the OperatIons Resea

    Jan 1, 1968

  • CIM
    Flash Flotation at Hudson Bay Mining and Smelting

    By L. Betteridge, A. Marks

    "An OK 300 cu. ft. Skim - Air cell was installed at the HBM&S concentrator in Flin Flon in 1987. Since that time, 3 additional OK Skim - Air cells have been installed in HBM&S concentrators. The cell

    Jan 1, 1991

  • AUSIMM
    Mining and Sustainable Development ù A WWF Perspective

    Mineral exploration and development can have a significant impact on the environment and local communities, in some circumstances extending well beyond the mine site. Poor environmental performance an

    Jan 1, 2002

  • AIME
    Ore Concentration and Milling ? Some New Types of Equipment Noted, and Sink-Float Continues to Gain

    By F. M. Jardine

    I1944 the cry was for higher production more tons, more metal. New plants were built, capacity of old plants was increased and millmen all over the country were treating tonnages far above normal, sac

    Jan 1, 1945

  • CIM
    Challenges of Mines Rescue in Expanding Mine Operations

    By J. K. Armstrong, C. Feyerabend

    "As mines are constantly growing and expanding, so do the challenges for emergency response teams. They have to keep up with the pace set by current and future production techniques. Although mines ha

    Jan 1, 2019

  • TMS
    Analytical Model of Mechanics of Solidification in Metal Casting

    By Douglas J. Harvey, Chi-Mou Ni

    "This paper presents an analysis technique for the solidification of metal castings. This method, based on a modified finite difference scheme with an irregular mesh, is capable of dealing with the co

    Jan 1, 1986

  • SME
    Water Resources Development In The Arid Andean Antiplano Southern Bolivia

    By S. A. Osterberg, J. L. Breckenridge, R. S. Popielak

    Multidisciplinary investigations were completed to prove the availability of water resources for the proposed San Cristóbal silver-lead-zinc mine in the arid Altiplano of Bolivia. Surface water resour

    Jan 1, 2002

  • NIOSH
    RI 2433 Metallurgical Possibilities of the Descloizite Ores at Goodsprings, Nev

    By H. A. Doerner

    For the past three or four years attention has been attracted to the deposits of lead vanadate in the Goodsprings , Nevada , district . Some ore running as high as 9 per cent 205 has been produced , b

    Jan 1, 1923

  • CIM
    A Reservoir Study of the Excelsior Pool

    By W. A. Bain

    "AbstractProduction from the Excelsior Reservoir has amounted to approximately one million barrels. This production has caused a 'Pressure •drop of 10 p.s.i. from the original pressure of 1,245 p.s.i.

    Jan 1, 1952

  • ABM
    Development Tapered Plate On Gerdau Plate Mill

    By Antônio Augusto Gorni, Fabio Adriano da Silva, Emanuelle Garcia Reis, Afrânio Márcio Costa

    Gerdau Ouro Branco´s plate mill started the operation in 2016 with high level technology. Stands out the capacity to produce different thicknesses in a same plate, therefore allowing special service f

    Oct 1, 2019

  • AIME
    Basic Factors Involved In Bloating Of Clays (46e2422c-ad80-4be2-9af0-589b63d7e3ce)

    By J. D. Sullivan, Chester R. Austin, J. L. Nunes

    IT is characteristic of most shales and surface clays that a bloated or vesicular structure is produced by burning to a sufficiently high temperature, usually about 150° to 200°F. above the normal mat

    Jan 1, 1942

  • AIME
    Coal - Fine Coal Drying

    By G. A. Vissac

    The drying of fine coal involves special techniques, which are discussed and analyzed. Types of dryers employing these techniques are described. Calculations are presented for new methods of dealing w

    Jan 1, 1954

  • AUSIMM
    New reagents for beneficiation of lithium ores

    By T Walsh, S R. Mudnuru

    The development of lithium-ion batteries, coupled with the global trend towards electrification of transportation, has led to a dramatic increase in the demand for lithium. The production of lithium f

    Aug 24, 2022

  • SME
    Microtunneling Through Designed Curves

    By D. Craig Camp

    Microtunneling has successfully completed both horizontal and vertical curves. This paper covers the historical development of curved microtunneling and a description of one microtunneling project. Th

    Jan 1, 2001

  • SME
    Second Avenue Subway—Tunneling Beneath Manhattan

    By Geoffrey Fosbrook, Donald Phillips, Anil Parikh

    The Second Avenue Subway is a $16.8 billion project planned by the Metropolitan Transportation Authority (MTA) in New York City. It will reduce overcrowding and delays on the Lexington Avenue Line, im

    Jan 1, 2005

  • ABM
    Engenharia De Processo Em Um Laminador De Barras E Perfis Leves

    By José Aparecido Pereira

    Em um laminador de barras e perfis leves (MBQ) é necessário ter um padrão técnico corretamente elaborado a fim de facilitar a preparação do câmbio e tornar o ajuste de bitola (set up) mais rápido gera

    Aug 16, 2017

  • AIME
    Papers - Basic Factors Involved in Bloating of Clays (T. P. 1486, with discussion)

    By J. D. Sullivan, Chester R. Austin, J. L. Nunes

    It is characteristic of most shales and surface clays that a bloated or vesicular structure is produced by burning to a sufficiently high temperature, usually about 150° to 200°F. above the normal mat

    Jan 1, 1942