Search Documents

  • CIM
    Management of Environmental Emissions at Boliden Harjavalta Oy’s Smelter

    By H. -L. Heikkilä, E. Peuraniemi

    "Boliden Harjavalta Oy has a long tradition in the Finnish metal industry starting from the 1930's. The Smelter consists of copper and nickel flash smelting lines. Off-gases are captured in the acid p

    Jan 1, 2012

  • CIM
    The Hall-Héroult Process in Canada

    By F. McGravie, S. T. Solinski, W. W. Robertson

    During this, the Centennial year of the discovery of the Hall-Heroult process, it seems appropriate to review some of the developments which have taken place in Canada and to explain why it has become

    Jan 1, 1999

  • NIOSH
    IC 8464 Silver Potential And Economic Aspects Of The Leadville District, Lake County, Colo.

    By Henry C. Meeves

    The Bureau of Mines investigated the silver production potential of the Leadville (California) mining district, Lake County, Colo., in 1966-67. The mining history of the district, the ground condition

    Jan 1, 1970

  • CIM
    Application of Net Carbonate Value Characterization Methods to Gard Guide Implementation

    By C. H. Bucknam

    Net carbonate value (NCV) characterization methods for acid generation potential measurement originated from studies on the Carlin Trend during the 1990's and have been subsequently standardized

    Jan 1, 2011

  • CIM
    Instrumentation and Control for Industrial Minerals - Current and Future

    By J. Scrimgeour

    "The word ""instrumentation"" has expanded from its original meaning, which in engineering perhaps referred to measuring apparatus alone. In its broadest form, it now includes sensors, display instrum

    Jan 1, 1967

  • AIME
    The Role of the Platinum Metals in Dental Alloys

    By E. M. Wise

    THE practice of dentistry, particularly the construction of artificial dentures and "bridges," involves a unique and difficult application of the precious-metal alloys. Appliances used in the mouth ar

    Jan 1, 1932

  • AUSIMM
    Unlocking value in drill and blast at Olympic Dam – Lime 390 case study

    By P Vaikkattil, K Li, J Bullock

    Unlocking maximum value is essential when designing a stope and the associated drill and blast packets. This is becoming increasingly important at Olympic Dam as the operation continues to expand sout

    Mar 15, 2021

  • SME
    Laboratory Testing Of Residential Masonry Foundations To Minimize Damage Due To Mining-Induced Subsidence

    By R. A. Allwes

    In-plane bending and torsion tests were conducted on full-scale masonry walls to evaluate three post-reinforcement designs. The designs were developed to minimize longwall mine subsidence damage to ex

    Jan 1, 1995

  • AIME
    Papers - Metal Testing and Technology - The Role of the Platinum Metals in Dental Alloys (With Discussion)

    By J. T. Eash, W. S. Crowell, E. M. Wise

    The practice of dentistry, particularly the construction of artificial dentures and "bridges," involves a unique and difficult application of the precious-metal alloys. Appliances used in the mouth ar

    Jan 1, 1932

  • AIME
    Mining and Metallurgy - Nonferrous Physical Metallurgy

    By H. W. Gillett

    MAINTENANCE of membership by the technical so¬cieties and the activity of these societies in spite of the adverse business situation have been noteworthy. This forcibly brings home the fact that indus

    Jan 1, 1933

  • ABM
    Value In Use Of Pasek Dunite Improving The Return Sinter Fines

    By Aitor Elorriaga Fernandez de Arroyabe

    The purpose of Sinter plants is to heat iron ore fines along with fluxes and coke fines or coal, to produce a semi-molten mass that solidifies into porous pieces of sinter with the needed size and str

    Oct 30, 2017

  • CIM
    Hoisting at the Stobie Mine

    By A. M. Cameron

    THE HOISTING PLANT at the Stobie section of the FroodStobie mine is a two-shaft installation designed to handle a daily production of 18,000 tons of ore at depth. The two vertical shafts are within 10

    Jan 1, 1956

  • TMS
    Operations at the Doe Run Company's Herculaneum Primary Lead Smelter

    By N. D. Schupp

    The Doe Run Company's Herculaneum, Missouri lead smelter has existed in continuous operation since 1892. Throughout the history of the plant extensive developments have been made to improve throughput

    Jan 1, 2000

  • SME
    Scalable Framework for Worker Safety Assessments Inspired by Navajo Nation Mine Reclamation - SME Annual Meeting 2026

    By Ashley Woodward, S. Katharine Hammond, Mayela Padilla-Salas

    This paper presents a scalable framework for worker safety assessments. The paper focuses on uranium mine reclamation in underserved communities, specifically Cove Chapter of the Navajo Nation. By int

    Feb 22, 2026

  • NIOSH
    IC 7105 Annual Report Of Research And Technologic Work On Coal, Fiscal Year 1939 ? Introduction

    By A. C. Fieldner

    This report is the fourth of a series of annual summaries of research and technologic work on coal by the Technologic Branch of the Bureau of Mines. The coal research program of the Bureau has been

    Jan 1, 1940

  • NIOSH
    RI 7235 Use Of Antifissurants In Making Better Coke From Sunnyside Coal From Utah

    By M. J. Kovalik

    Lower Sunnyside seam coal from Utah was blended with various proportions of char and high-temperature coke to improve the quality of the coke obtained from carbonizing this coal. The Hanson 5-pound ca

    Jan 1, 1969

  • NIOSH
    IC 8849 Room And Pillar Retreat Mining - A Manual For The Coal Industry

    By Peter W. Kauffman

    This Bureau of Mines publication is designed primarily to provide mine engineers and production-level mine managers with the following: 1. Information to assist them in making the decision to retr

    Jan 1, 1981

  • IOM3
    Discussions and contributions: Geology and evaluation of placer gold deposits in the Klondike area, Yukon Territory

    By B. W. Hester

    Report of discussion at January, 1971, general meeting (Chairman: M. J. Cahalan, President) of the paper published in Transactions/Section B (Applied Earth Science), vol. 79, May, 1970, pp. B60-B67, a

    Dec 1, 1971

  • CIM
    Building from the ground up in the Sahara The complexities of project execution in a developing country

    By Olivia Gamache

    When working in remote and extreme environments, projects are faced with new challenges for engineering and project execution. This is heightened when also working in countries with a developing env

    May 1, 2013

  • NIOSH
    Bulletin 54 Foundry-Cupola Gases and Temperatures

    By A. W. BELDEN

    Among the investigations that the Bureau of Mines is conducting witha view to increasing efficiency in the utilization of fuels belonging to or for the use of the Government is an investigation of the

    Jan 1, 1913