Search Documents

Sort by

  • ISEE
    Use of a Scaled Concrete Model to Determine the Origins of Air Overpressure

    By N. Skopak, W. Birch, A. Douglas, C. Johnson

    Determining the origins of air overpressure has been a long-debated topic within the explosives engineering community. Historically, it has been accepted that the initial face movement gave rise to ai

    Jan 1, 2024

  • NIOSH
    OFR-18-90 Back Injuries In Underground Coal Mining

    By Terrence J. Stobbe

    The authors investigated the nature, cause and treatment of 234 back injuries which occurred in 156 different situations in underground coal mines. A detailed interview was conducted with each injured

    Jan 1, 1989

  • NIOSH
    OFR-112-85 Generalization Of Medical And Health Compliance Research To Coal Mine Safety

    By H. P. Cole

    Methods for increasing compliance to medical and health regimens were reviewed along with similar research in industrial and mine safety. Principles abstracted from both areas suggest that compliance

    Jan 1, 1985

  • NIOSH
    OFR-64-75 Proceedings Of The Second WVU Conference On Coal Mine Electrotechnology

    A compilation of papers presented at The Second WVU Conference on Coal Mine E1ectrotechnology in Morgantown, West Virginia on June 12 -14, 1974. Papers cover areas of electric power, electronic commun

    Jan 1, 1974

  • NIOSH
    Bulletin 222 Metallurgy of Quicksilver (Mercury)

    By L. H. Duschak, C. N. Schuette

    In the years 1850 to 1923, the United States produced 2,426,000 flasks- (73,600 metric tons) of quicksilver worth $120,500,000. California yielded 2,195,000 flasks of this total; the remainder came fr

    Jan 1, 1925

  • AUSIMM
    Geostatistical Modelling of Geometallurgical Variables - Problems and Solutions

    By C V. Deutsch

    "Geometallurgical variables often cause problems to conventional geostatistical workflows. There are many variables; some are compositional and some are non-additive. They often show: complex multiva

    Sep 29, 2013

  • NIOSH
    Bulletin 98 Report of the Selby Smelter Commission

    By J. A. Holmes, EDWARD C. FRANKLIN, RALPH A. GOULD

    The commission may be permitted to express its earnest hope that the litigation which comes to an end with the findings and recom- mendations herein set forth will be considered by both parties to the

    Jan 1, 1915

  • CIM
    A Comparison Of Equipment And Methods Used In Flat.-Seam Stripping In The United States And Mountain Stripping In Western Canada

    By Fred Horne

    1N THIS PAPER, the writer proposes to limit his comments to few generalized phases of the subject, based on his personal experience in the midwestern United 'States and in one section .of the Coa

    Jan 1, 1951

  • CIM
    Pretreatment of Silver Separated Residue by Alkaline Smelting at Low Temperature

    By Qing-hua Tian, Li-then Cheng, Xue-yi Guo

    In order to recycle valuable metals from silver separated residue, a novel method using alkaline smelting at low temperature was proposed. The main factors affecting the main metal recovery such as th

    Jan 1, 2011

  • TMS
    Linear Intercept Analysis of Mineralogical Texture

    By R. P. King

    The linear intercept distributions provide unambiguous and accurate characterizations of the texture of mineralogical materials. The relation between the measured linear intercept distributions and th

    Jan 1, 1991

  • IMPC
    Improving AG/SAG Mill Performance with Optimised Pulp Discharger Design

    Nowadays, the more successful plants are those who have adopted effective and efficient strategies to optimise their plant operation. As the ?heart of the plant? could be viewed as the mil-ling/grindi

    Jan 1, 2014

  • AUSIMM
    Commissioning the Cannington Project ù Creating Success

    By C Torrisi, J Andreatidis, M Duffy

    BHPÆs Cannington process plant was commissioned in October 1997. The Cannington ore contains high grades of silver, lead and zinc but also contains high levels of fluorine which must be removed to pro

    Jan 1, 2000

  • TMS
    New Operational Calculation Process for the T-FSF

    By M. Hamamoto, S. Tanaka, K. Noda

    "Tamano Smelter or Hibi Kyodo Smelting Co. Ltd. is operating with the Tamano Type Flash Smelting Furnace method which is a flash smelting furnace without slag cleaning furnace but which can discharge

    Jan 1, 2000

  • AUSIMM
    Risk assessment tool for mines using diesel-powered mobile equipment

    By A Reid, A W. Musk, O Jones

    In this paper, the authors attempt to bridge the gap that currently exists between the duty-of-care responsibilities of underground mining industry personnel, and the multifaceted health challenges fa

    Oct 16, 2017

  • TMS
    Recent Operations At The Atlantic Copper Smelter In Huelva

    By Patricio Barrios

    In February 1996, ATLANTIC, COPPER completed the construction of a Project for Expansion and Environmental Improvements in its Smelter and Electrolytic Refinery located in Huelva. Following the expans

    Jan 1, 1998

  • SME
    Knowledge-Based Ore Control Systems For Associated Manganese Mines In South Africa

    By R. Cook

    Knowledge based applications are becoming important to Associated Manganese for efficiently dispatching ore of appropriate grades to customers on time. The G2 expert system shell has been used to deve

    Jan 1, 1997

  • TMS
    Remediating an Integrated Copper Complex: Past Problems, Present Issues and Lessons for the Future

    By Sandra M. Stash

    An integrated copper production complex includes mining, milling and smelting facilities which are usually at or near a common site, and sized to complement one another in capacity. There may also be

    Jan 1, 2003

  • CIM
    Water management simulation for the Pogo Gold Mine

    By G. Beckstead, L. Gormely, R. Zimmer, K. Hanneman, B. Nethery

    As part of the EIS and permitting activities for the Pogo Mine in Alaska, a risk assessment study for the water management plan was carried out. The basis for the study was a site water volume and con

    Jan 1, 2005

  • SME
    Surface Mining And The Forest Environment

    By Don Cchultz

    The United States Forest Service, as a land managing agency, is responsible for the surface administration of National Forest lands. The basic objectives of management are protection and utilization o

    Jan 1, 1971

  • ISEE
    Underground Remote Firing System

    By Tom Paynter

    In an underground mining environment, the primary method of firing a blast is using a combination of an electric detonator and a detonating cord to initiate the Nonelectric detonators. This method has

    Jan 1, 2017