Search Documents

Sort by

  • IMPC
    The Economic And Environmental Case For Recovering Cyanide From Gold Plant Tailings

    By Chris A. Fleming

    "The ability to recover cyanide from gold plant tailings has been known almost as long as the cyanidation process has been practiced, but there has been little incentive to process tailings in this wa

    Jan 1, 2003

  • AIME
    Problems of Steel Plant Metallurgy

    By WILFRED SYKES

    IT is with particular pleasure that I welcome the members of the Open-hearth Conference of the I American Institute of Mining and Metallurgical Engineers to this meeting, as I feel this is one of the

    Jan 1, 1930

  • AIME
    The 130th Meeting of the Institute at Birmingham

    By AIME AIME

    THE 130th Meeting of the Institute was held in Birmingham on Oct. 13 to 15, with visits to other mines and districts before and after. The last visit of the Institute to Birmingham was made in 1888, t

    Jan 1, 1924

  • AIME
    The Bogoslovsk Mining Estate.

    By William H. Shockley

    THERE was an, extensive mining and industrial exploitation of Russia, about 20 years ago, by Belgian, French and British capitalists; but the results were discouraging. It is said that the Belgian and

    Mar 1, 1908

  • AIME
    Safety in Mines

    By J. V. W. REYNDERS

    IN THE remarks which I am about to make concern¬ing the safety work of the Bureau of Mines, I want first of all to disengage myself from a disposition, which is frequently in evidence, to give spectac

    Jan 1, 1925

  • AUSIMM
    Increased drilling accuracy leads to significant improvement in ore recovery and dilution

    By R Stimpson, B Johnson, B Hesse

    During a period of twelve months between FY18-19, a series of trials were conducted to compare production drilling accuracy using two different methodologies, and the subsequent impact this had on sto

    Mar 15, 2021

  • AUSIMM
    Creating optimised drill programs that add real value, and integrate with mine planning

    By N Anderson

    With traditional grade control processes, geological models are created by geologists at the completion of the data collection stage and wireframe construction is closed off at a set date to allow for

    Mar 22, 2022

  • SME
    Back on Track: The Downtown Rail Extension - RETC2021

    By Meghan M. Murphy, Derek Penrice

    The Downtown Rail Extension (DTX) is principal element of the planned second phase of the Transbay Joint Powers Authority’s (TJPA) Transbay Program. When complete, this regionally critical project wil

    Jun 13, 2021

  • SME
    Empirical Approach Based Estimation of Charge Factor and Dimensional Parameters in Underground Blasting "Mining, Metallurgy & Exploration (2021)"

    By VIVEK KUMAR HIMANSHU, M. P. Roy, P. K. Singh, A. K. Mishra, RAVI SHANKAR

    Blasting with the aim to reduce oversize boulders in underground has many hurdles due to limited accessibilities and poor site conditions. Optimized drilling and blasting parameters can help to achiev

    Jan 4, 2020

  • SAIMM
    Value-add insights into technology adoption, implementation in mine planning and operational execution at Kumba Iron Ore Mines APCOM 2021

    By T. J. Otto, I. D. Ungerer, G. C. Lindeque, T. J. van Heerden

    Anglo American Kumba Iron Ore (Kumba) continues to implement technologies focussed on improving safety and productivity; this forms part of the groups FutureSmart Mining initiative. The paper provides

    Sep 1, 2021

  • AIME
    Colorado Paper - The Development of Colorado's Mining Industry

    By T. A. Rickard

    The history of this State is that of one generation. Thirtysix years only have elapsed since the birth of that beneficent industry whose footsteps were the first to traverse the wilderness of the prai

    Jan 1, 1897

  • CIM
    The Mathew's method for open stope design

    By S. B. V. Stewart, W. W. Forsyth

    "Since the Mathew's method for open stope design was first proposed by Golder Associates in 1980 it has been applied at a number of mine sites in Canada. The initial hypothesis was based on a rel

    Jan 1, 1995

  • AIME
    Annual Report of the Woman's Auxiliary

    ANNUAL meeting of the Woman's Auxiliary of the American Institute of Mining and Metal-lurgical Engineers convened on Tuesday morn-ing, Feb. 20, the president, Mrs. H. W. Hardinge, presiding. Pres

    Jan 4, 1923

  • TMS
    Expansion Plans at CPM's Electrolytic Zinc Refinery

    By S. J. Thiele, T. Newton, W. Magalhäes, T. Takayama, J. Welsh

    Companhia Paraibuna de Metais (CPM) is presently pursuing a zinc production expansion project. Besides increasing production, the goal of the project is to address existing problems while providing a

    Jan 1, 2000

  • SAIMM
    Contributions to the paper 'Uneconomic gold production in South Africa'

    By H. L. Monro

    Contribution by B. K. Martust I congratulate the author on his interesting paper. In my view, the establishment of the level at which South African gold output is at some kind of optimum is an interes

    Jan 1, 1984

  • CIM
    Teck Cominco's KivcetTM Furnace Operation - The First 10 Years

    By G. G. Richards, D. J. Rioux, R. L. Stephens

    Teck Cominco Metals Ltd. operates an integrated zinc-lead complex at Trail, British Columbia, Canada. The year 2007 marks ten years of operation of KIVCETTM flash smelting technology for the treatment

    Jan 1, 2008

  • DFI
    The Advantage Of Measurement While Drilling (Mwd) For Geotechnical Site Characterization

    By Anahita Modiriasari, Benjamin S. Rivers

    Measurement while drilling (MWD) is a subsurface exploration technique associated with real-time and continuous monitoring and recording of drilling data during the drilling process. This technique ca

    Oct 1, 2022

  • AUSIMM
    Advances in downhole assay measurements and calibration techniques

    By H Rossiter, C Simpson, J Market, P Jeanneau

    Downhole Assay tools are a geophysical method to collect an instigated response from the material surrounding a drill hole and deliver a multielement proxy-assay. They were first tested in the Pilbara

    Nov 8, 2021

  • AUSIMM
    Unlock potential opportunities through unexplored aspects of Grade Engineering

    By P Revell, G Wilkie, P Walters, L Keeney, F Faramarzi

    Grade Engineering® is a value-driven strategy aiming to maximise benefits by exploiting intrinsic grade variability of ore deposits. It utilises a multitude of separation techniques to remove low grad

    Nov 10, 2020

  • SME
    Ground Control Monitoring: A Comprehensive Guide for Mine Operators on Instrumentation and Data Acquisition Currently Used by the National Institute for Occupational Safety and Health (NIOSH) - SME Annual Meeting 2024

    By Todd Minoski, Matthew McElhinney, Mark Mazzella, Morgan Sears, Craig Compton

    The National Institute for Occupational Safety and Health (NIOSH) is staffed with Engineers, Geologists, and Field Technicians conducting a variety of ground control research. The mission of the groun

    Feb 1, 2024