Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Industrial Minerals review 2015By Daniel M. Flanagan
"Editor’s note: Each year, Mining Engineering features an industrial minerals review. Several people put in a fair amount of time in developing the material for this issue, all the while doing their o
Jul 1, 2016
-
Mini Symposium - Crushing And Grinding Large Diameter Mill Drives - Gears For Large Diameter Mills DrivesBy Russell G. Shomperlen
Grinding mills in excess of 5 meter diameter and 3500 kilowatts per mesh are putting new demands on big gears. This paper returns to the basics of ring gear design beginning with the fundamental power
Jan 1, 1981
-
OFR-129-76 Ignition Suppression DeviceBy Will B. Jamison
An ignition detection and suppression system was developed under the scope of this contract. The objective of this machine mounted system was to detect flames caused by frictional sparking from the cu
Jan 1, 1976
-
Introduction - The Mission (4ab67ebe-10bd-4fce-bf8d-8ce8ca71886d)The Bureau of Mines is responsible for a broad spectrum of programs for meeting the diverse and changing mineral resource needs of the Nation. These programs are managed by the Director and two Deputy
Jan 1, 1979
-
OFR-68-75 Feasibility Of Hydraulic Transportation In Underground Coal Mines ? Executive SummaryBy James M. Link
Underground coal mining is the most hazardous industrial occupation in the United States.. Haulage accidents in underground coal mines contribute substantially to the occupational hazards of this type
Jan 1, 1975
-
IC 8479 Review Of Bureau Of Mines Coal Program, 1969 ? IntroductionBy John D. Spencer
Projects aimed at achieving the least disturbance to the Nation's air, water, and land resources in the mining and utilization of coal continued to be a feature of the Bureau of Mines coal progra
Jan 1, 1970
-
Introduction - The MissionThe Interior Department's Bureau of Mines is the Federal Government's primary research arm in the mineral and fossil-fuel fields. In accordance with its Organic Act of 1910, the Bureau'
Jan 1, 1972
-
IC 6688 Cut-And-Fill Stoping ? Introduction And AcknowledgmentsBy C. H. Johnson
This paper on the out-and-fill method of mining is one of a series on mining methods published by the United States Bureau of Mines. It has been compiled chiefly from recent publications of the bureau
Jan 1, 1933
-
Bulletin 197 Sampling and Examination of Mine GasesBy George A. Burrell, G. W. Jones, Frank M. Seibert
In this bulletin, the style of Bulletin 42 has been closely followed. Much of the material is reprinted on the following pages in its original form, and changes have been made only where manifestly ne
Jan 1, 1926
-
Piping and Segregation in Steel Ingots - Preliminary PaperBy HENRY M. HOWEL
1. Introduction.-The first part of this papers treats of the causes and the restraining of piping in steel ingots; the second& considers the causes and the restraining of -segregation; and the third p
Mar 1, 1907
-
Methods Of Mining Bedded Deposits - IntroductionBy John P. Weir
The planning of an underground mine for successful extraction of a bedded deposit in sedimentary rocks requires the integrated evaluation of many interdependent problems. The development and coordinat
Jan 1, 1966
-
OFR-84(6)-76 A Master Environmental Control And Mine System Design Simulator For Underground Coal Mining - Volume VI - Production Subsystem ? I. IntroductionBy C. B. Manula
Simulation continues to hold the spotlight among the Operations Research applications in the operational side of mining. One reason for this is the need to solve the many waiting line and storage prob
Jan 1, 1974
-
Mine Projects 101: Challenges Of TodayBy M. Javier
Mining is an industry of experimentation throughout human history. Recently, societies are giving a clear message about mining because many projects are being rejected around the world. These refusals
Feb 27, 2013
-
Comparative Analysis Of Open Pit Mine Scheduling Techniques For Strategic Mine Planning Of The Tintaya Copper Mine In PeruBy D. Bernabe
The mine scheduling process defines a mining sequence across the life of the mine and stipulates the amount of ore, waste, and specific blocks to be mined each year so that the highest economic return
Jan 1, 2002
-
The Development of a Robust Sampling Strategy and Protocol in Underground Gold MinesThe development of a robust belt sampling strategy and protocol inunderground gold mines is a fundamental requirement for effective grade quality control, ore accounting and mine-mill reconciliations.
Jan 1, 1999
-
The Use And Abuse Of Feasibility Studies (c627553d-2bd9-45a2-832d-29f2383e03fc)By W. Mackenzie
The development of a resource project inevitably requires the investigation of a vast range of issues across most engineering disciplines - mining, metallurgical, chemical, civil, electrical, mechanic
Jan 1, 2007
-
A Shaba-type Cu-Co(-Ni) Deposit at Luamata, West of the Kabompo Dome, Northwestern ZambiaBy Nicholas Macrae Steven
Abstract - The Shaba-type Luamata Cu-Co(-Ni) deposit (11°50_S, 24°28_E) is located in a tectonic slice of Katangan Roan Supergroup (Mines Group) sedimentary rocks, surrounded by younger Kundelungu Sup
Jan 1, 2000
-
Barrick Goldstrike Roaster Facility Dry Grinding And LeachingBy D. Denton, L. Buckingham
The dry grinding and leaching circuits of the Barrick Gold’s new Roasting Facility at Goldstrike Mine in Nevada, USA incorporate well proven technologies in a unique combination. During the design of
Jan 1, 2001
-
19. Fluorite-Zinc-Lead Deposits of the Illinois-Kentucky Mining DistrictBy Robert M. Grogan, James C. Bradbury
The Illinois-Kentucky mining district has, since 1880, accounted for 80 per cent of all U.S. production of fluorspar. The ore deposits are of two types: vein deposits formed by fissure fillings along
Jan 1, 1968
-
OFR-97(1)-77 Development Of A Conveyor-Type Cross Pit Overburden And Material Handling System - Revision -1By L. J. Defferding
This report documents the work performed by Battelle-Northwest and its sub-contractors in Phase I of a project to develop a cross pit conveyor system for the Bureau of Mines. The conveyor system des
Jan 1, 1976