Search Documents

Sort by

  • SME
    Bench-Scale Testing Of A Micronized Magnetite, Fine-Coal Cleaning Process

    By E. R. Torak

    Custom Coals, International has installed and is presently testing a 225 kg/hr. (500 lb/hr.) micronized-magnetite, fine-coal cleaning circuit at PETC's Process Research Facility (PRF). The cost-s

    Jan 1, 1996

  • CIM
    Past And Future Cycles Of Copper: Regional And Global

    By M. D. Gerst

    The degree to which copper will continue to be in an integral part of the world economy in the future will depend largely on the dynamics of global economic development, the primary and secondary copp

    Jan 1, 2007

  • ISEE
    Seismic Blasting Between the North Poles

    By Lloyd Litwin

    The ARTA 2008 Project (Alpha Ridge Test of Appurtenance) was a Canadian Government sponsored deep water seismic survey carried out on the high arctic permanent polar ice cap. This Geological Survey of

    Jan 1, 2011

  • CIM
    Numerical Modelling of Longwall Panels as an Aid to Mine layout Design

    By D. J. Reddish

    The paper describes a case study where numerical modelling has been applied to predict potential risks associated with inflows of water in active mine workings from an overlying sandstone aquifer. The

    May 1, 2003

  • CIM
    Some Notes on the Problem of Gob Fires in Thick, Highly Inclined Seams

    By J. B. De Hart

    In the September issue of the Bulletin, 1923, there is a paper by J. A. H. Church on "The Spontaneous Combustion of Coal in Mines", which is more or less a general discussion of the subject. Mr. Churc

    Jan 1, 1924

  • NIOSH
    RI 7992 Elemental Composition of Coal Mine Dust

    By T. C. Wesson

    The need for elemental-analysis information on coal mine dust for use in health and safety research prompted this study by the Bureau of Mines. Neutron-activation and X-ray fluorescent techniques were

    Jan 1, 1974

  • NIOSH
    RI 4316 Diamond Drilling At The Tallapoosa Copper Mine Haralson County, Ga.

    By T. J. Ballard

    The Tallapoosa Copper mine in Haralson County, Ga., has been operated, or under development at various times since before the Civil War. The geology of the deposit is similar to that of many of the py

    Jan 1, 1948

  • CIM
    Leaching Behaviour of a Colombian Nickel Laterite in Aqueous Alkaline Glycine Solutions

    By G. T. Lapidus, A. Garcés, O. J. Restrepo

    "Colombian nickel laterites have historically been processed by pyrometallurgy. However, due to the depletion in ore grades, alternative processes are required. Hydrometallurgical processes, such as p

    Jan 1, 2017

  • SME
    Considerations for Hydrogeological Testing Using Inflatable Packers, Lessons Learned & Project Examples

    "INTRODUCTION The characterization of groundwater hydrogeology is a common component in feasibility studies, geotechnical investigations and regulatory permitting for mining operations. The lithology

    Jan 1, 2017

  • TMS
    Nanoindentation and Tem Characterization of ION Irradiated 316L Stainless Steels

    By Khalid Hattar, Alexander McGinnis, Buchheitm Thomas, Paul Kotula, Luke Brewer

    "Understanding the effects of extensive radiation damage in structural metals provides necessary insight for predicting the performance of those metals considered for application in the extreme radiat

    Jan 1, 2012

  • CIM
    Sinking No. 5 Winze at Wright-Hargreaves Mine

    By W. T. Sampson

    Introduction The Kirkland Lake (Ontario) property of Wright-Hargreaves Mines, Limited, - consists of four claims. The two main shear zones or 'breaks' of the Kirkland Lake camp extend thr

    Jan 1, 1948

  • CIM
    Use of Conditional Simulation to Assess Mesclassifcation of Ore and Waste in a Highly Discontinuous Gold/Copper Deposit

    By W. Hardtke, B. Perry

    Model reconciliation problems at the low-grade, high-nugget Phoenix gold-copper deposit led to an examination of the influence of production decisions on ore-waste classification. A conditional simula

    Jan 1, 2011

  • CIM
    Tin at the Sullivan Concentrator

    By H. R. Banks

    SHORTLY after the commencement of operations at the Sullivan concentrator, the use of a pilot table was instituted in order to present a visual control of various products by showing the amount of gal

    Jan 1, 1941

  • SME
    The Longest Pipe Conveyor Of The World With Double Load Transport At Cementos Lima In Peru

    By J. Wiedenroth

    Since the end of the 1970s Pipe Conveyors have become increasingly important for conveying bulk materials because they have some specific advantages over conventional troughed belt conveyors. FLSmidth

    Jan 1, 2010

  • CIM
    Mine ventilation: Waste heat recovery

    By L. Henry Smith, David C. Arthur

    "The Williams Mine is Canada’s largest gold producer, with annual production of 450 000ounces from 2 300 000 tonnes of ore. Highly mechanized and automated underground mining practices are employed in

    Jan 1, 1996

  • NIOSH
    RI 9018 - High-Temperature Relative Enthalpies and Related Thermodynamic Properties of Na2 Ti6 013

    By M. J. Ferrante

    Relative enthalpies of high-purity disodium hexatitanate (Na2Ti6013) were measured at the Bureau of Mines to provide new thermodynamic data needed to advance the technology of materials. Measurements

    Jan 1, 1986

  • CIM
    Effect of Reheating Schedules on the Hot Working Behavior of Az31 Magnesium Alloy

    By L. Shang

    In conventional continuous hot rolling processes, metals are usually reheated to a temperature such that the workpiece will maintain appropriate hot working characteristics as it proceeds through the

    Jan 1, 2006

  • NIOSH
    IC 7029 Cost Of Mining 55 Tons Of Copper-Nickel Ore At The Great Eastern Prospect, Bunkerville, Clark County, Nev. ? Introduction

    By Paul T. Allsman

    This paper gives the cost and describes the mining of 55 tons of nickel-bearing rock by hand methods from a prospect in southern Nevada, June 15, 1937, by the Mining Division of the Bureau of Mines. T

    Jan 1, 1938

  • CIM
    Why Aren?t We Using More Thermal Coal in Canada? ? The Real Reasons

    By Roger K. M. Bellows

    The last coal-fired power plant to be built in Canada came into operation in 1994. Since then, Canada?s electricity requirements have grown substantially but no new coal-burning plants have been built

    May 1, 2001

  • CIM
    Ventilation Design and Operating Issues Relating to Underground Mines with High Elemental Sulphur Content

    "The ventilation-related risks from mines with elemental sulphur include dust explosions, spontaneous combustion with emission of heat and toxic sulphur dioxide or hydrogen sulphide gases, reactions w

    Jan 1, 2019