Search Documents

  • CIM
    Estimation of large open pit haulage truck requirements

    By G. H. Blackwell

    Open pit mine management must ensure that sufficient trucks are available and are being used effectively for production, and that operating costs are under continued control and review for improvement

    Jan 1, 1999

  • SME
    Applications of Fuzzy Theory‑Based Approaches in Tunnelling Geomechanics: a State‑of‑the‑Art Review - Mining, Metallurgy & Exploration (2023)

    By Vhutali Carol Madanda, FHATUWANI SENGANI, François Mulenga

    The first introduction of fuzzy theory in the nineteenth century created room for continuous research and application in various fields. Fuzzy set theory has been globally applied in geotechnical engi

    May 15, 2023

  • NIOSH
    IC 9507 - Reducing Low Back Pain and Disability in Mining

    By Sean Gallagher

    This report was written in an effort to provide better control measures for low back pain (LBP) and low back disability in the mining industry. There are numerous factors associated with development o

    Sep 1, 2008

  • SME
    Optimization Of An Iron Ore Flotation System

    By M. E. Volin

    Reagent control for optimum concentrate yield was studied by laboratory batch flotation tests simulating the Groveland plant flotation circuit in which a rougher concentrate is cleaned twice. The reag

    Jan 1, 1965

  • AIME
    Precipitating and Drying Cement Copper at Kennecott's Bingham Canyon Facility

    By W. Joseph Schlitt, William D. Southard, Bruce P. Ream, Lawrence J. Haug

    The operation of Kennecott's Bingham Canyon copper precipitation plant, one of the world's largest, is described. This description includes a brief historical review of precipitation at Bing

    Jan 6, 1979

  • AIME
    Precipitating and Drying Cement Copper at Kennecott's Bingham Canyon Facility (d99153e6-6508-48ae-be0b-262baadda362)

    By William D. Southard, Joseph W. Schlitt, Bruce P. Ream, Lawrence J. Haug

    The operation of Kennecott 's Bingham Canyon copper precipitation plant, one of the world's largest, is described. This description includes a brief historical review of precipitation at Bin

    Jan 1, 1980

  • SME
    Development of a Real‑Time Respirable Coal Dust and Silica Dust Monitoring Instrument Based on Photoacoustic Spectroscopy

    By W. P. Arnott, P. Nascimento, X. L. Wang, K. C. Kocsis, S. J. Taylor, H. Firouzkouhi

    We report the first spectral photoacoustic measurements of silica, coal, and kaolinite dust absorption coefficients from 11 to 13 μm at 5 nm resolution made with a tunable quantum cascade laser. This

    Aug 20, 2022

  • NIOSH
    IC 9358 A Microcomputer Network For Control Of A Continuous Mining Machine

    By William H. Schiffbauer

    This report details a microcomputer-based control and monitoring network that was developed in-house by the U.S. Bureau of Mines and installed on a continuous mining machine. The network consists of m

    Jan 1, 1993

  • TMS
    Process Control: From PID to CIM

    By J. Fraser Forbes

    "The meaning of the term ""process control"" has evolved significantly since its widespread use began in the manufacturing industries in the 1940s. Further, the scope of process control applications h

    Jan 1, 2000

  • AUSIMM
    Panel Caving Scheduling Under Precedence Constraints Considering Mining System

    By E Rubio, N Morales

    Currently, mine plans are optimised by using several criteria as objective functions, like profit, life-of-mine, concentration of some pollutants, mining costs, confidence level or ore resources, with

    Sep 26, 2011

  • CIM
    Solid-State Reduction of South African Manganese and Chromite Ores: Effect of an Organic Binder and B2O3

    By M. O. Makwarela, M. W. Erwee, K. Bisaka

    "Energy efficiency in mining and minerals processing forms part of Mintek’s long-term research strategy which includes a specific programme designed at overcoming the challenges faced by the South Afr

    Jan 1, 2016

  • CIM
    Preliminary Models for Basalt Evolution in the La Grande Greenstone Belt

    By B. Rivard, D. Francis

    A layered Archean magma chamber is exposed at the base of the Yasinski segment of the La Grande greenstone belt. This intrusive complex lies beneath a sequence of mafic volcanics and is underlain by g

    Jan 1, 1984

  • TMS
    Effects of Binders Additives on Compressive Strength of Hematite Pellets in Firing Process

    By Dan Wang, Yuanbo Zhang, Guihong Han, Guanghui Li, Tao Jiang, Yanfang Huang

    "Hematite concentrates are characterized by bad high-temperature reactivity and poor balling index, which restrict their large-scale application in the production of oxidized pellets. An organic addit

    Jan 1, 2012

  • NIOSH
    IC 8663 Hydraulic Sandfill In Deep Metal Mines

    By Lewis M. McNay

    The Bureau of Hines and industry (mining and private) have studied the placement of hydraulic sandfill in deep-vein mines to identify existing problems and to develop techniques to strengthen the supp

    Jan 1, 1975

  • NIOSH
    RI 2165 Engineering Applied to Oil Field Production Problems

    By A. W. Ambrose

    "Those having an intimate knowledge of the relation between production and consumption of crude oil in the United States have realized for some time that production will not be able to keep pace with

    Sep 1, 1920

  • CIM
    The Cablebolting Cycle —Underground support engineering

    By D. Jean Hutchinson, Mark Diederichs

    "Cable bolts are an important support component in modern underground mines. If an optimized cable bolt system is to be achieved, it is insufficient to focus on cable bolt layout design or on cable bo

    Jan 1, 1996

  • ISEE
    Advantages in Using Real-Time Blasting Simulation in Surface Blast Planning and Grade Control

    By Peter Dare-Bryan, Will Hunt, Lee Julian

    It is well-known that blasting has an economic effect on grade control activities. However, until recently, methods did not exist for measuring the grade control value change caused by the blast. Rule

    Feb 6, 2023

  • NIOSH
    IC 8729 The Bureau Of Mines Test Program For Clay And Ceramic Raw Materials

    By K. J. Liles

    The Federal Bureau of Mines conducts a comprehensive test program on clay and shale at the Tuscaloosa Metallurgy Research Center. All samples are subjected to standard preliminary ceramic tests, which

    Jan 1, 1977

  • AUSIMM
    The Integration of a Due Diligence Process into a Mining Operation

    A mining operation can be identified as demonstrating prudent management when a number of vital characteristics are evident.All risks and opportunities that are critical to the on-going success of the

    Jan 1, 1998

  • SME
    Case Study – UG Stope Optimization at Agnico Eagle’s Kittilä Mine

    By K. Huttu, A. van Wageningen

    "The Kittila underground mine is extracting one of the largest known gold deposits in Europe and has an estimated mine life through 2034. The Kittila mine is located in the Lapland region of northern

    Jan 1, 2015