Search Documents

  • SAIMM
    Review of machine learning-based Mineral Resource estimation

    By M. A. Mahboob, T. Celik, B. Genc

    Mineral Resources estimation plays a crucial role in the profitability of the future of mining operations. The conventional geostatistical methods used for grade estimation require expertise, understa

    Nov 30, 2022

  • CIM
    Fibrous Dust -Its Measurement and Control

    By Gyan S. Rajhans

    "The strategy of fibrous dust sampling is discussed, various sampiing methods are critically reviewed .and their application to coal dust is demonstrated. Fibre counting is described in detail. An att

    Jan 1, 1970

  • AUSIMM
    Designing Interferometric Synthetic Aperture Radar Surveys for Mine Monitoring with Accuracy Assessment

    By R Ahola, M D. Henschel, M A. McParland

    With the introduction in recent years of third-generation interferometric synthetic aperture radar (InSAR) techniques, monitoring of mine slopes, benches and surrounding areas has benefitted from incr

    Nov 5, 2014

  • TMS
    Tensile Behavior of Epoxy Matrix Composites Reinforced with Pure Ramie Fabric

    By Marcos V. F. Fonseca, Djalma Souza, Luiz G. X. Borges, Sergio Monteiro, Caroline G. de Oliveira, Ygor M. de Moraes, Janine F. de Deus, Frederico M. Margem

    Recently, the natural fibers have been studied as alternative reinforcement material to the use of synthetic fibers. Aiming to improve the properties of natural fibers composites, it is investigated t

    Mar 1, 2017

  • SAIMM
    Stability analysis of a free-standing backfill wall and a predictive equation for estimating the required strength of a backfill material – a numerical modelling approach

    By S. Sekhar, S. Bhargava, A. K. Godugu, J. L. Porathur

    Cemented backfilling has enabled underground hard rock mines to extract orebodies more safely with improved ore recovery. It is important to estimate the minimum required strength parameters for a bac

    May 2, 2022

  • SME
    Control Of Crushing Circuits Will Reduce Capital And Operating Costs

    By Malcolm D. Flavel

    As indicated in the introduction to this paper, it is a sequel to that which I gave to the last annual meeting in Atlanta in march. This paper goes further into aspects of crushing and screening, prim

    Jan 1, 1977

  • NIOSH
    OFR-11(2)-82 Recontouring Of Steep-Slope Abandoned Contour Mines - Volume II - Appendices

    By Daniel I. Carey

    Current and potential dragline reclamation usage was evaluated for the U.S. coalfields based on data gathered and analyzed during field surveys, literature reviews and contacts with manufacturers. It

    Jan 1, 1981

  • IOM3
    Kinetics of pyrite decomposition in a fluidized bed: part 1: removal of ambient sulphur vapour is rate-limiting; part 2: influence of transfer processes in the bed

    By M. D. Gibbs, T. N. Smith, B. Verbaan

    When heated in the absence of oxygen, pyrite from refractory gold concentrates decomposes endothermically to pyrrhotite, releasing sulphur. The decomposition starts at the particle surface and progres

    Jun 19, 1905

  • SME
    Blue Flame Burner Report

    By R. R. Givler

    Since the 1860's the good ole days, oil has been nozzle fed to burners under pressure atomizing the oil into droplets -- 1960's has produced vaporized oil that burns oil with the flame color

    Jan 1, 1975

  • SME
    Discussion - Computer-aided schedule optimization in room-and-pillar and longwall operations

    By G. Johnston, P. K. Chatterjee, S. Holguin

    M. Gershon The article is an excellent one, providing a basis for the conduct of the major tasks in underground mine planning and scheduling. I object to only one word. Since that word is featured

    Jan 8, 1988

  • DFI
    Measurements of CDSM Strengths and Seepage Data Following Seismic Upgrades of San Pablo Dam

    By Atta B. Yiadom, A. David Miller, Robert C. Kirby, Sean M. Todaro

    "San Pablo Dam is a 170-foot (52-meter)-high earthfill embankment, located approximately 10 miles (16 kilometers) north of downtown Oakland, California, that impounds a 38,600 acre-feet (47.6 million

    Jan 1, 2015

  • AUSIMM
    A ‘no tailings dam future’ – preconcentration strategies ‘down the sizes and across the value chain’

    By P Revell, B Adair, D King, L Keeney

    Grade Engineering®, integrated across the mine value chain, has a pivotal role to play in achieving step change reductions in energy and water usage in mine operations. High levels of gangue rejection

    Nov 10, 2020

  • TMS
    Production of Structural Products from Copper Mining Tailings

    By Thomas Weyand, Thomas Claridge, Dale Nickels

    "This paper addresses the initial results of a project to evaluate the suitability of copper mining tailings as raw material for the production of structural products using PMET’s patented technology.

    Jan 1, 2008

  • SME
    Use of Subsidence to Estimate Secondary Extraction of Trona (c58fbfc6-051e-430f-a2c4-f6e817c31939)

    By P. W. Conrad, C. Todd, N. A. Degerstrom, N. West, R. Kramer

    "Surface subsidence caused by underground room-and-pillar mining operations and by solution mining operations have been studied separately but never in combination. In 2008, FMC Minerals began using s

    Jan 4, 2018

  • CIM
    Long-term planning of an underground mine using mixed-integer linear programming (3f914add-ff63-4567-994a-ce69fb049d25)

    By G. McIsaac

    "This paper discusses the formulation of a linear program with the objective of maximizing the cash flow of the long-term plan of an underground operation. A mine is split into eleven independent ore

    Jan 1, 2005

  • CIM
    Long-term planning of an underground mine using mixed-integer linear programming

    By G. McIsaac

    This paper discusses the formulation of a linear program with the objective of maximizing the cash flow of the long-term plan of an underground operation. A mine is split into eleven independent ore z

    Sep 1, 2005

  • CIM
    Evaluation of Groundwater Leakage into a Dam Foundation Drainage Tunnel

    By J. M. Hong, H. K. Zheng, R. Hu, C. B. Zhou

    The Jinping-I double curvature arch dam, located in the middle reach of the Yalong River and with a maximum height of 305 m, is the world highest dam of the same type that has been completed. Since th

    Jan 1, 2015

  • AIME
    Superlatives and the Superflous

    By T. A. Rickard

    The purposes of composition are various; one purpose, for instance, is to make a record for the writer's own use, as in a diary. That does not involve responsibility to others. There is also the

    Jan 1, 1931

  • AUSIMM
    The Role of Government in the Northern Territory Mining Industry

    By C Berglin

    Is the Northern Territory different? Certainly it is more remote, has less people and relies more heavily on two or three industries for its survival. On the other hand, its mining industry is govern

    Jan 1, 1994

  • CIM
    Mining in a Lateral Stress Field at White Pine

    By Jack Parker

    "The original design of mine openings and pillars at White Pine was based upon traditional assumptions; i.e., that the principal load is due to the weight of overburden, and that horizontal stresses a

    Jan 1, 1966