Aspects of Wear in Mill Circuit PumpsBy C. I. Walker
Field tests at a number of large mineral processing operations have been undertaken to better understand the wear life impact of different aspects of pump design, materials of construction and mainten
Jan 1, 2012
-
A Reservoir Study of the Excelsior PoolBy W. A. Bain
"AbstractProduction from the Excelsior Reservoir has amounted to approximately one million barrels. This production has caused a 'Pressure •drop of 10 p.s.i. from the original pressure of 1,245 p.s.i.
Jan 1, 1952
-
Improving Mine Performance Through Contract Mining (The Australian Experience)By T. S. Golosinski
Use of contractors to excavate, load and haul mined material is widespread in Australia. It is also becoming a common practice in many other countries. The paper reviews current practices in Australia
Jan 1, 1998
-
Practical rock engineering in the optimization of stope dimensions – application and cost effectivenessBy J. W. Bawden, J. Nantel
"The mine operator has two prime objectives when he operates a mine: (l) the mine must be safe, and (2) the mine must operate with the lowest possible costs. The operator constantly faces a dilemma; i
Jan 1, 1989
-
Understanding Cyanidation of Silver from Batch and Continuous Medium Temperature Pressure Oxidation Generated ResiduesBy R. T. Seaman
Pressure oxidative treatment of whole ores and/or mineral concentrates is used to leach or liberate metals of value for downstream recovery. Silver, when present, is often lost in processing, precipit
-
Direct Block-Support Simulation of Grades in Multi-Element Deposits: Application to Recoverable Mineral Resource Estimation at Sungun Porphyry Copper-Molybdenum DepositBy S. A. Hosseini, O. Asghari
"Recoverable mineral resources assessment has become a standard geostatistical application in the mining industry, with various geostatistical techniques currently available. This investigation aimed
Jan 1, 2017
-
Incorporating the true costs and opportunities of rehabilitation and closure in project selection, design and approvalsBy C Tomlin, C Gimber
Historically, key closure risks have been studied during operations and then further assessed as cessation of mining approaches. Only in the past couple of decades or so has progressive rehabilitation
Aug 2, 2023
-
On The Beneficiation Of High-Dolomitic Pebbles: Exploring The Use Of A High-Pressure Roll MillBy F. J. Sotillo
The objective of this investigation was to determine the feasibility of using a high-pressure roll mill (HPRM) to improve the separation efficiency of dolomite from apatite in downstream operations wh
Jan 1, 1998
-
Metallurgy and mineral processing plant at St. Joe's El Indio mine in ChileBy E. H. Smith
St. Joe Minerals Corp., a subsidiary of Fluor Corp., treats high-grade gold, silver, and copper ore at its El Indio plant at an altitude of 4 km in the Chilean Andes. The ore is complex, being a mixtu
Jan 1, 1987
-
Using Simul8 to model underground hard rock mining operationsBy N. Vayenas, G. Yuriy
"The combination of a predictive reliability assessment model and discrete-event simulation can be an effective methodology to study the impact of equipment failures on the capacity of production syst
Jan 1, 2005
-
Design Software for Electronic DetonatorsBy Kia Riihioja, Mike Higgins
A major difference between electronic and pyrotechnic detonators is that, in almost all but the simplest of blast layouts, computer software is required to plan a blast using electronic detonators. Wh
Jan 1, 2004
-
Hydrometallurgical Processing Of EAF Steelmaking FumesBy C. Lupi
Electric arc furnace dust generated during the production of steels is regarded as hazardous waste because of the presence of leachable elements such as Cr, Pb, Cd .... Different processes are availab
Jan 1, 1996
-
Mitigation Banks Add Certainty to Mining Timelines and CostsBy Nate Ober, Heath Rushing
"Mining companies want to be in a position to move quickly and seize a favorable market or to keep their key staff productively busy. One of the problems for these companies is the time required to co
Jan 11, 2017
-
Highwall mining technology— A review of current status and design methodsBy N. R. Thote, J. L. Porathur, C. P. Verma
Highwall mining is a highly mechanized coal mining method associated with several advantages, such as a very high production rate (approximately 3,000 t/d) and low production costs. There is no requir
Jan 1, 2014
-
Plasma Technology for the Manufacturing of Nuclear Materials at NecsaBy J. L. Havenga, L. J. van der Walt, J. T. Nel
"SynopsisThe development of plasma technology at Necsa started in the early 1980s, when the applicability of high-temperature plasmas in the nuclear fuel cycle was investigated. Since 1995, this plasm
Jan 1, 2015
-
Improving Grinding Efficiency By Rationed Ball Charging At Amax's Climax Molybdenum MineBy Robert R. Dorfler
AMPS[. has completed a rationed grinding ball test in a 2.93 m x 2.93 m ball mill at Climax Molybdenum Company. The test consisted of purging the ball distribution formed by charging 100%, 76 mm carbo
Jan 1, 1981
-
Investigation Of Fire And Explosion Accidents In The Chemical, Mining, And Fuel- Related Industries - A ManualBy Joseph M. Kuchta
This Bureau of Mines manual is oriented to the technical needs of an investigation of fire or explosion accidents and includes various practical and theoretical information that is needed in analyzing
Jan 1, 1985
-
Treatment Of Steel Industry Wastes With Magnetic HydrocyclonesBy Charles H. Rawlins
Reported is work done on processing of steel mill effluents in the areas of dewatering and separation. Much of the waste from these operations is in the form of sludges from scrubbers, in which the pr
Jan 1, 1994
-
Predictable Blasting With In Situ Seismic SurveysBy C. D. Broadbent
Open pit blasting can be a low cost routine or a high cost bottleneck depending on geology, environment and the operator's ability to master site conditions. Because blasting is a repetitive oper
Jan 4, 1974
-
Technical Problems Of Underground Stress Instrumentation ? IntroductionBy Robert Stefanko
The importance of underground stress instrumentation cannot be minimized. It was Lord Kelvin who said that unless you can assign a number to a quantity,, you know very little about it. Most engineers
Jan 1, 1963