Search Documents

  • AUSIMM
    Mine Scheduling and Optimisation

    Mine scheduling is a process which represents what happens in a mine over time. An optimised plan involves selecting the best workable plan which meets a stated objective. This paper discusses some

    Jan 1, 1991

  • AUSIMM
    People-A Behavioural Scientists View

    The determinants of human behaviour are numerous and complex. Many scientific disci- plines focus on various processes which play some part in shaping the actions of individ- uals and groups. Behavi

    Jan 1, 1982

  • AIME
    Computerized Determination Of Mine Planning Data From Boreholes

    By Christopher Haycocks, J. Richard Lucas

    The growth of computer and ground control technology in recent years, combined with an urgent demand for low-cost fossil fuels and mineral resources, has set the stage for full-scale utilization of co

    Jan 4, 1973

  • DFI
    Engineering Practice Of Ground Improvement ? Introduction

    By H. R. Taber

    The extensive subject area "Engineering Practice of Ground Improvement" will be treated within the limitations of space and the writer on the basis of personal practice and experience?largely in North

    Jan 1, 2010

  • AIME
    Institute of Metals Division - Heat Content and Specific Heat of WC-Co Alloys (TN)

    By H. J. Booss

    THERE is a considerable lack of data on thermody-namic properties of hard-metal alloys. Only two papers 1,2 give mean values of specific heat in an unknown temperature range; more recently the author3

    Jan 1, 1960

  • SME
    Precious Metal Heap Leaching In A High Rainfall Alpine Setting At The Barrick Gold Pierina Mine In Peru

    By G. Bee, Z. Gavelan, R. Espinel, Y. Roditis, X. Ochoa

    In August 1996 Barrick Gold Corporation acquired the Pierina property, an advanced stage exploration project, high in the Andean Cordillera of Peru and in November 1998, in a record time of just over

    Jan 1, 2002

  • SME-ICGCM
    Computer Modeling Of Yield Pillar Behavior Using Post-Failure Criteria

    In this paper, the plastic increment theory was applied in a 2-D finite element model, and a generalized Von Mises yielding criterion adopted to simulate the progressive failure of coal pillars. Exten

    Jan 1, 1988

  • SME
    Floodplain Aggregate Mining in Western Oregon

    By E. F. Schnitzer

    During 1996 and 1997, Oregon experienced flooding on a scale not seen in many years. Some gravel pits located near rivers experienced erosion. In several cases, breaches occurred between the gravel p

    Jan 1, 1999

  • AIME
    Summary of Experimental Work Comparing Three Ventilation Configurations in a Downsloping Dead-Ended Drift

    By B. G. Bunting, J. H. Johnson, H. J. Schock

    This paper describes an experimental method for monitoring diesel-generated exhaust gas pollutants in a deadended drift to assess the effect of control approaches. Experiments were conducted to determ

    Jan 1, 1982

  • NIOSH
    IC 9025 Tungsten Availability - Market Economy Countries - A Minerals Availability Program Appraisal

    By T. F. Anstett

    The Bureau of Mines estimated the potential availability of tungsten from 57 mines and deposits in 19 market economy countries. The tungsten resources of China and the U.S.S.R. were also estimated. Th

    Jan 1, 1985

  • SME
    Ore Mineral Particles Morphology And Modelling By On Line Optical Systems

    By G. Bonifazi

    In the present work the possibility to utilize the morphometrical and morphological characteristics of an articulate solids system in a slurry flow to monitorate and to control a continuous process is

    Jan 1, 1994

  • NIOSH
    IC 6864 Accidents In Tennessee Coal Mines 1932-34

    By Frank E. Cash

    The work of the United States Bureau of, Mines is concerned primarily with the prevention of accidents in the mining, petroleum, and allied industries. This report analyzes the fatal accidents in the

    Jan 1, 1935

  • SAIMM
    Guidelines for geotechnically anomalous conditions in tabular hard rock mines

    By A. R. Leach

    Anomalous mining conditions can be described where the level of hazard is increased relative to normal conditions within a mining area. Normal conditions would be those defined as a Ground Control Dis

    Jan 1, 2003

  • AUSIMM
    Do All MetPlants Work Well? PlantMets can Ensure They Do

    By P Cameron

    MetPlant conferences have focused on ensuring mining projects are well designed then optimised to operate safely and effectively at the top end of world’s best practice to ensure shareholders are not

    Sep 7, 2015

  • NIOSH
    RI 5928 A Rapid Twist Test For Determining Hot-Forming Temperatures Of Steels ? Summary

    By C. S. Tout

    While investigating methods for determining the best temperatures for hot-working experimental stainless steels, the Bureau of Mines Albany Metallurgy Research Center developed a machine in which hot-

    Jan 1, 1962

  • IOM3
    Discount rates and risk assessment in mineral project evaluations; Risk assessment in reserve estimation and open-pit planning; Inclusion of risk assessment in open-pit design and scheduling: contributed remarks

    By H. K. Taylor, B. Denby, L. D. Smith

    Contributions by H.K. Taylor and G.A. Davis discuss the three papers published in Transactions IMM A, vols. 103 and 104, with responses by Smith and Dowd

    Dec 1, 1995

  • DFI
    Man - Organisation - Technology - Proposals For Optimising Preventive Work

    By Walter Ensinger

    Working safely means working cost-effectively. Every "dangerous occurrence" and - even more so - every industrial accident causes disruptions in the planned course of construction. Besides moral and l

    Jan 1, 2006

  • NIOSH
    IC 8038 Developments In Waterflooding And Pressure Maintenance In Osage County, Okla. Oilfields, 1961 ? Introduction And Summary

    By Kenneth H. Johnston

    Records show that waterflooding was tried in Osage County as early as 1934, but it was not economically important until a large unitized flood in the North Burbank field was begun in 1950. Development

    Jan 1, 1961

  • SAIMM
    Importance of pore pressure monitoring in high walls - Synopsis

    By K. L. Morton

    Groundwater and associated pore pressure represent elements that can have a negative impact on surface mining and slope stability. Groundwater flow and deformation within a slope influence each other.

    Jan 1, 2008

  • AUSIMM
    Cost Management Optimisation

    By B King

    Processing expansion options and mining fleet purchases are major cost items that receive due focus in most cost management analyses. If these items are not needed, they can significantly reduce a pro

    Nov 24, 2014