Beneficiation of Nickel Laterites for HPAL ProcessingNickel laterite HPAL circuits are known for their complexity and have presented a large number of challenges to process engineers worldwide. An attitude commonly encountered by the author is that the
Jan 1, 2008
-
Improving grade estimation using machine learning: A comparative study of ordinary kriging against machine learning algorithmsBy R. C. A. Minnitt, A. Akpabio
This study presents a rigorous comparison between ordinary kriging and commonly used machine learning algorithms, those being, linear regression, support vector regression, decision trees, random fore
Mar 30, 2026
-
The Iron-Ore Supply Of The United States.*By C. WIFLARD HAYES
(New Haven Meeting, February, 1909.) I DESIRE to make it perfectly clear at the outset that I fully realize the hazardous nature of any attempt to estimate the quantity of iron-ore or any other miner
Apr 1, 1909
-
RI 4147 Concentration of Oxide Manganese Ores from Havasu Lake District California and ArizonaBy R. R. Wells, G. M. Potter, R. Havens, W. W. Agey
"INTRODUCTION As part of the program of investigating possible domestic sources of manganese, ore-dressing studies were conducted at Salt Lake City, Utah, on five samples of manganese oxide ore obtain
Dec 1, 1947
-
Long-term planning of an underground mine using mixed-integer linear programming (3f914add-ff63-4567-994a-ce69fb049d25)By G. McIsaac
"This paper discusses the formulation of a linear program with the objective of maximizing the cash flow of the long-term plan of an underground operation. A mine is split into eleven independent ore
Jan 1, 2005
-
Long-term planning of an underground mine using mixed-integer linear programmingBy G. McIsaac
This paper discusses the formulation of a linear program with the objective of maximizing the cash flow of the long-term plan of an underground operation. A mine is split into eleven independent ore z
Sep 1, 2005
-
On Increasing Reliance on Numerical Modelling and Synthetic Data in Rock EngineeringBy T. G. Carter
"Tremendous progress has been made in recent years towards developing computational tools that allow ready solution of most common rock engineering problems, with amongst the most advanced of the tool
Jan 1, 2015
-
Pilot Scale Study of De-silverising and De-bismithising of Lead by Fractional Crystallisation with RefluxBy Iley J. D, Siviour N. g, Moffatt R. J
The process of desilverising by fractional crystallisation with reflux was investigated through laboratory batch tests and continuous laboratory bench scale tests at CSIRO Clayton, to a 300 kg/hr p
Jan 1, 1989
-
Factors Affecting Probable Future Iron Ore ProductionBy W. G. SWART
THE best estimate on reserves of iron ore in the Lake Superior district is that made, in 1920, by Mr. R. C. Allen, amounting to 2,947,225,000 tons of assured and probable ore. This includes direct- sh
Jan 1, 1926
-
RI 4658 A Preliminary Survey Of Zirconium AlloysBy C. T. Anderson
In July 1947, the U. S. Bureau of Mines, in cooperation with the Air Materiel Command, started an investigation of zirconium alloys with the object of determining the suitability of such alloys for hi
Jan 1, 1950
-
Value in Use ù Developing an Improvement Program for SuccessBy M Gill, A Mathias
The mining industry has always been cost-focussed but in recent times mining companies have moved towards obtaining a competitive advantage through the implementation and sustainability of best practi
Jan 1, 2004
-
An Automated Approach to Generating Haul RoadsBy S. Hill
For a mining operation, the determination of the best place to build haul roads is typically done by hand, or with the assistance of rudimentary shortest path optimisation algorithms. Straight line, p
Aug 1, 2013
-
Double Disc Cutter Consumption of an EPB TBM in Tuzla Wastewater TunnelBy Utku Gumus, Ertan Bostanci, Hanifi Copur, Ahmet Rüfai Bilgin, Ugur Altay
"Field observations on replacements of 12-inch constant cross-section double disc cutters in Tuzla Wastewater Tunnel excavated by an EPB TBM with 3.151 mm excavation diameter excavating hard rock are
Jan 1, 2016
-
The Fragblast History FB 1- FB 10By Agne Rustan
This paper is intended to give a summary of the first ten Symposia on Rock Fragmentation by Blasting where the symposia activities were governed by a Steering Committee replaced at Fragblast 2 by an I
Jan 1, 2014
-
Bulletin 108 Melting Aluminum ChipsBy H. W. Gillett, G. M. JAMES
In its work on mineral wastes the Bureau of Mines is studying losses in the melting of nonferrous metals and alloys. The greatest of these losses is that of zinc through volatilization in brass meltin
Jan 1, 1916
-
Development And Use Of Certain Flotation Reagents - Historical Development Of Flotation ReagentsBy R. S. Dean
The original flotation reagents were certain oils selected for a combination of properties that occurred fortuitously. It was recognized quite early in the study of flotation mechanism that, in order
Jan 1, 1944
-
Advances in the Simulation of Flexible CircuitsBy M M. Hilden, M S. Powell, B Foggiatto
In an environment of decreasing ore grade, increasing costs and uncertainty with respect to commodity prices, the industry could benefit from evaluating alternative technologies and innovative circuit
Sep 1, 2014
-
Performance of Reserve Estimation Techniques in the Presence of Extremely High-grade Samples, Jasper Gold Mine, SaskatchewanBy Chris M. Healey
"Abstract- The Jasper Gold mine in northern Saskatchewan produced a total mill feed of 140 127 tonnes at an average grade of 19.0 g/t Au. Both diamond drilling and chip samples from under ground work
Jan 1, 1993
-
Fosterville Gold Mine Heated Leach ProcessBy M Binks
The Fosterville Gold mine is located approximately 20km to the East of Bendigo in central Victoria. The gold at Fosterville occurs as solid solution within disseminated arsenopyrite and pyrite. The Fo
Aug 8, 2011
-
The Risk in Risk ManagementBy D. S. Evans
Major Project Blues Over the last two decades, almost every major project has suffered significant cost overruns, significant schedule delays, and/or poor quality work. Exceptions are rare and most
May 1, 2013