Search Documents

  • AUSIMM
    Beneficiation of Nickel Laterites for HPAL Processing

    Nickel laterite HPAL circuits are known for their complexity and have presented a large number of challenges to process engineers worldwide. An attitude commonly encountered by the author is that the

    Jan 1, 2008

  • SAIMM
    Improving grade estimation using machine learning: A comparative study of ordinary kriging against machine learning algorithms

    By R. C. A. Minnitt, A. Akpabio

    This study presents a rigorous comparison between ordinary kriging and commonly used machine learning algorithms, those being, linear regression, support vector regression, decision trees, random fore

    Mar 30, 2026

  • AIME
    The Iron-Ore Supply Of The United States.*

    By C. WIFLARD HAYES

    (New Haven Meeting, February, 1909.) I DESIRE to make it perfectly clear at the outset that I fully realize the hazardous nature of any attempt to estimate the quantity of iron-ore or any other miner

    Apr 1, 1909

  • NIOSH
    RI 4147 Concentration of Oxide Manganese Ores from Havasu Lake District California and Arizona

    By R. R. Wells, G. M. Potter, R. Havens, W. W. Agey

    "INTRODUCTION As part of the program of investigating possible domestic sources of manganese, ore-dressing studies were conducted at Salt Lake City, Utah, on five samples of manganese oxide ore obtain

    Dec 1, 1947

  • CIM
    Long-term planning of an underground mine using mixed-integer linear programming (3f914add-ff63-4567-994a-ce69fb049d25)

    By G. McIsaac

    "This paper discusses the formulation of a linear program with the objective of maximizing the cash flow of the long-term plan of an underground operation. A mine is split into eleven independent ore

    Jan 1, 2005

  • CIM
    Long-term planning of an underground mine using mixed-integer linear programming

    By G. McIsaac

    This paper discusses the formulation of a linear program with the objective of maximizing the cash flow of the long-term plan of an underground operation. A mine is split into eleven independent ore z

    Sep 1, 2005

  • CIM
    On Increasing Reliance on Numerical Modelling and Synthetic Data in Rock Engineering

    By T. G. Carter

    "Tremendous progress has been made in recent years towards developing computational tools that allow ready solution of most common rock engineering problems, with amongst the most advanced of the tool

    Jan 1, 2015

  • AUSIMM
    Pilot Scale Study of De-silverising and De-bismithising of Lead by Fractional Crystallisation with Reflux

    By Iley J. D, Siviour N. g, Moffatt R. J

    The process of desilverising by fractional crystallisation with reflux was investigated through laboratory batch tests and continuous laboratory bench scale tests at CSIRO Clayton, to a 300 kg/hr p

    Jan 1, 1989

  • AIME
    Factors Affecting Probable Future Iron Ore Production

    By W. G. SWART

    THE best estimate on reserves of iron ore in the Lake Superior district is that made, in 1920, by Mr. R. C. Allen, amounting to 2,947,225,000 tons of assured and probable ore. This includes direct- sh

    Jan 1, 1926

  • NIOSH
    RI 4658 A Preliminary Survey Of Zirconium Alloys

    By C. T. Anderson

    In July 1947, the U. S. Bureau of Mines, in cooperation with the Air Materiel Command, started an investigation of zirconium alloys with the object of determining the suitability of such alloys for hi

    Jan 1, 1950

  • AUSIMM
    Value in Use ù Developing an Improvement Program for Success

    By M Gill, A Mathias

    The mining industry has always been cost-focussed but in recent times mining companies have moved towards obtaining a competitive advantage through the implementation and sustainability of best practi

    Jan 1, 2004

  • CIM
    An Automated Approach to Generating Haul Roads

    By S. Hill

    For a mining operation, the determination of the best place to build haul roads is typically done by hand, or with the assistance of rudimentary shortest path optimisation algorithms. Straight line, p

    Aug 1, 2013

  • SME
    Double Disc Cutter Consumption of an EPB TBM in Tuzla Wastewater Tunnel

    By Utku Gumus, Ertan Bostanci, Hanifi Copur, Ahmet Rüfai Bilgin, Ugur Altay

    "Field observations on replacements of 12-inch constant cross-section double disc cutters in Tuzla Wastewater Tunnel excavated by an EPB TBM with 3.151 mm excavation diameter excavating hard rock are

    Jan 1, 2016

  • ISEE
    The Fragblast History FB 1- FB 10

    By Agne Rustan

    This paper is intended to give a summary of the first ten Symposia on Rock Fragmentation by Blasting where the symposia activities were governed by a Steering Committee replaced at Fragblast 2 by an I

    Jan 1, 2014

  • NIOSH
    Bulletin 108 Melting Aluminum Chips

    By H. W. Gillett, G. M. JAMES

    In its work on mineral wastes the Bureau of Mines is studying losses in the melting of nonferrous metals and alloys. The greatest of these losses is that of zinc through volatilization in brass meltin

    Jan 1, 1916

  • NIOSH
    Development And Use Of Certain Flotation Reagents - Historical Development Of Flotation Reagents

    By R. S. Dean

    The original flotation reagents were certain oils selected for a combination of properties that occurred fortuitously. It was recognized quite early in the study of flotation mechanism that, in order

    Jan 1, 1944

  • AUSIMM
    Advances in the Simulation of Flexible Circuits

    By M M. Hilden, M S. Powell, B Foggiatto

    In an environment of decreasing ore grade, increasing costs and uncertainty with respect to commodity prices, the industry could benefit from evaluating alternative technologies and innovative circuit

    Sep 1, 2014

  • CIM
    Performance of Reserve Estimation Techniques in the Presence of Extremely High-grade Samples, Jasper Gold Mine, Saskatchewan

    By Chris M. Healey

    "Abstract- The Jasper Gold mine in northern Saskatchewan produced a total mill feed of 140 127 tonnes at an average grade of 19.0 g/t Au. Both diamond drilling and chip samples from under­ ground work

    Jan 1, 1993

  • AUSIMM
    Fosterville Gold Mine Heated Leach Process

    By M Binks

    The Fosterville Gold mine is located approximately 20km to the East of Bendigo in central Victoria. The gold at Fosterville occurs as solid solution within disseminated arsenopyrite and pyrite. The Fo

    Aug 8, 2011

  • CIM
    The Risk in Risk Management

    By D. S. Evans

    Major Project Blues Over the last two decades, almost every major project has suffered significant cost overruns, significant schedule delays, and/or poor quality work. Exceptions are rare and most

    May 1, 2013