Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Developments in Mine Hoist DesignBy J. M. Whatley
"IntroductionIN UNDERGROUND mining operations, the mine hoist has become one of the most important and one of the most expensive single pieces of equipment. As the means of transporting men and materi
Jan 1, 1953
-
Violence Factor – The New Tool for Blast Performance AnalysisBy Dr. Calvin J. Konya, Anthony Konya
Blast violence has always been a criteria that has been analyzed without a quantitative approach relying on opinions of those viewing the blast and oftentimes does not transfer between open-pit mines,
-
Managing health and safety risks: Implications for tailoring health and safety management system practices - SME Transactions 2016By D. R. Willmer, E. J. Haas
As national and international health and safety management system (HSMS) standards are voluntarily accepted or regulated into practice, organizations are making an effort to modify and integrate strat
Jan 1, 2016
-
Prediction Of Blast Induced Ground Vibrations In Karoun III Power Plant And Dam: A Neural NetworkBy M. Kamali
In this research, in order to predict the peak particle velocity (PPV)(as vibration indicator) caused by blasting projects in the excavations of the Karoun III power plant and dam, three techniques in
Jan 1, 2010
-
Programmes in Safety Prevent AccidentsBy C. S. Gibson
INTRODUCTION I WELCOME the opportunity to speak on Programmes in Safety. The invitation to do so shows that those guiding affairs of the Institute in this District realize the practical importance of
Jan 1, 1951
-
Mine Scheduling Optimization With Mixed Integer ProgrammingBy Mark E. Gershon
A mixed-integer formulation of the mine scheduling problem is discussed and applied for the purpose of optimizing both the mine production sequencing and the mill blending and processing problems simu
Jan 1, 1982
-
Applications of collectors containing thioamide groups in the flotation of copper, copper-molybdenum, and gold ores, V.I. Ryaboy, V.P. Kretov, and I.V. RyaboyBy V. I. Ryaboy, V. P. Kretov, I. V. Ryaboy
Attachment of collectors containing thioamide groups to sulfide minerals is interpreted as interaction between NH-acids and sulfides acting as solid bases with the formation of a donor–acceptor reagen
Jan 1, 2020
-
Performance Comparison Of Various Kriging Techniques Using Exhaustive Data SetBy Y. C. Kim
Using an exhaustive data set of Walker Lake, four different kriging techniques plus the inverse distance squared weighting were compared with regards to each one's performance in accurately estim
Jan 1, 1995
-
RI 3777 Wartime Application of Air-Gas Injection and Oil-Well Reconditioning in the Appalachian RegionBy Sam S. Taylor
"INTRODUCTION This report deals with a comparatively simple application of some of the engineering principles involved in the evaluation, installation, and operation of air- or gas-injection projects
Sep 1, 1944
-
An Analysis of the Mixing of Air and Methane in the Stream Produced by the Mine Injector Station - Presenting Preliminary Results of Measurements and ModellingBy J Janus, J Krawczyk
Local accumulation of methane in workings of a longwall is one of the most common causes of mining accidents. This gas has many sources: it may leak from goaf through permeable sealings, or through ga
Jul 1, 2013
-
Guidelines For Improving Trailing Cable Splice Performance ? IntroductionBy R. H. King
Underground coal mining machinery utilizes portable electric sables, "trailing cables." to obtain power from load centers or distribution boxes. Cables are frequently damaged since mobile equipment, p
Jan 1, 1975
-
Geotechnical Challenges in Narrow Vein MiningBy J Hadjigeorgiou
Narrow vein mining, as most types of mining, faces important geotechnical challenges. The specificity of geotechnical challenges in narrow vein mines stems from the nature of the deposits, which are o
Mar 26, 2012
-
Large Diameter Steel Pipe Piles Running Under Self Weight In Soft Clay ' Predicted Vs. Observed Behavior ' Richmond San Rafael Bridge Seismic RetrofitBy A. R. Dover
The Richmond San Rafael Bridge (Figure 1) is a 4.3 mile long major toll bridge span across northern San Francisco Bay. Tutor-Saliba/Koch/Tidewater (TSKT) conducted a comprehensive seismic retrofit, wh
Jan 1, 2006
-
Modeling Viscosities Of Ferromanganese SlagsBy Merete Tangstad, Kai Tang
The primary aim of the present investigation is to develop a model which permits to calculate/predict the viscosities of ferromanganese slags, typically focus on the MnO-SiO2-Al2O3-CaO-MgO-FeO multico
Jan 1, 2007
-
Bench Stoping at Mount Isa Mines Limited Isa Lead Mine - Mount Isa, QueenslandBy J Robinson, D Herbert
Bench stoping operations at the Isa Lead mine have been underway for over 11 years. They were implemented to address safety, productivity and mining cost concerns noted with cut and fill mining operat
Jan 1, 1998
-
Development Of Subsidence And Horizontal Strain Models For Longwall Mining At The York Canyon Mine ? IntroductionBy Robert P. King
In April, 1975 the Colorado School of Mines began monitoring rock mass response associated with a long- wall shield demonstration project near Raton, New Mexico. This project was sponsored by the U. S
Jan 1, 1979
-
Styles of Pacific Rim epithermal gold mineralizationBy Greg Corbett
The paper point out the styles of Pacific Rim epithermal gold mineralization. Some characteristics of differing styles of epithermal gold mineralization influence investment decisions (metallurgy, met
Apr 24, 2001
-
Room-and-pillar panel design method to avoid surface subsidence (baff531e-1217-4963-ad11-1cde90cbd566)By Y. Luo
Cuando se diseña y operan minas de carbón subterráneas con el método de cámaras y pilares, es siempre difícil obtener un buen equilibrio entre la prevención de subsidencia de la superficie y la obtenc
Jan 1, 2014
-
Flotation of Uranium from Elliot Lake OresBy S. Kaiman
This paper describes flotation test work conducted over the past several years at the Mines Branch, Ottawa, on the radioactive quartz-pebble conglomerate ores of the Elliot Lake area of Ontario. The p
Jan 1, 1966
-
Needed Improvements in Rotary-Drilling EquipmentBy J. E. Brantly
THE oil-producing industry may logically be 'divided into four independent branches: (1) Acquisition of possible productive lands by lease, fee purchase, concession, or otherwise and the perfecti
Jan 1, 1937