Search Documents

  • CIM
    Process Control in Gold Milling at Noranda's Hemlo Gold Mines Inc.

    By C. Larsen, R. A. Walker, A. Voth, C. Daoust

    "The 3000 t/d mill at Hernia Gold Mines Inc. was commissioned in March, 1985. By Canadian standards the concentrator is highly automated, however, unlike the retrofit systems in many other plants, the

    Jan 1, 1988

  • NIOSH
    RI 5407 Spectrographic Determination Of Beryllium In A Variable Matrix - Summary

    By E. E. Creitz

    Application of the usual chemical methods to the determination of beryllium in the mineral-dressing products of a spodumene pegmatite was found to be unsatisfactory as to speed, accuracy, sensitivity,

    Jan 1, 1958

  • AUSIMM
    Getting it right from the beginning – ESG in mineral exploration

    By L H. G McClean

    Environmental, social and governance (ESG) factors have always been important to the minerals industry and is now considered one of our most important opportunities (and risks). Getting it right from

    Sep 1, 2024

  • AUSIMM
    Situational 3D variography – determining the variogram in the context of geology

    By P Gleeson, J Coombes, P Suresh, T McLennan

    The last 20 years have seen a dramatic rise in the use of 3D visualisation and modelling for geological data, but there has been relatively little effort to do the same for the variogram models that u

    Sep 20, 2017

  • DFI
    Is the use of Residual Strength Justified in Excavation Support Design?

    By George Aristorenas, Carlos Englert, Jesús Gómez

    "Laboratory test data of strain softening soils exhibit the development of a maximum (peak) shear strength followed by a decrease in the strength with continued straining. The rate of strength loss de

    Jan 1, 2015

  • TMS
    Improvements on the Process of Gold-Antimony Concentrate Smelting in China

    By Wei-feng Liu

    On the basis of the brief introduction of the gold-antimony concentrate smelting process in China, some problems in the original process were analyzed and the corresponding improvements were introduce

    Jan 1, 2008

  • ABM
    Adequação Das Propriedades Mecânicas De Perfis Astm A572 G60 Para Produção De Torres De Transmissão

    By Izabelle Lannes Salgueiro Ferreira

    O presente trabalho teve como objetivo adequar às propriedades mecânicas dos perfis ASTM A572 G60, através do estudo da influência dos parâmetros de processo de laminação e composição química do aço.

    Jul 30, 2018

  • AUSIMM
    New Continuous Production System in Block Cave Mining – the Rock Flow System

    By M Frenzel

    At the last MassMin Conference in Sudbury, Caterpillar’s vision of a continuous mining concept for block caving operations was presented on the background of global raw material demand and its continu

    May 9, 2016

  • AUSIMM
    Optimisation of Hydraulic Filling for Underground Disposal of Tailings in Peru

    By D M R Stone

    Failings di,posal presents many challenges at metal mines in Peru where the extreme relief yields very little useable land area. These challenges are amplified by other hazards such as the high seis

    Jan 1, 1998

  • AIME
    Effect of the War on the Mineral Engineering Schools

    By William B. Plank

    ENROLMENT data given in this report of the seventh study of the schools by the Mineral Industry Education Division reveals the critical situation in the mineral engineering schools of the United State

    Jan 1, 1944

  • AIME
    Humphreys Spiral Concentration On Mesabi Range Ores

    By Whitman E. Brown

    The installation in 1948 of a Humphrey spiral concentrator section at the Hill-Trumbull plant of The Cleveland-Cliffs Iron Co. is the latest commercial method on the Mesabi Range being used for the re

    Jan 1, 1949

  • AUSIMM
    The æSmoking GunÆ of Detailed Mine Closure Cost Over-Run - A Review Using Case Studies of the Real Costs Associated with the Demolition and Removal of Infrastructure in Mine Closure

    By A Hutton, C Dick, D Fletcher

    Mine and facility closure planning is a dynamic and rapidly evolving landscape. In this landscape, mining companies and industry consultants are generally good at estimating the associated earthworks

    Jul 10, 2012

  • CIM
    The Examining Engineer and the Mining Industry

    By J. D. Galloway

    The mining industry of British Columbia continues to grow steadily in importance. The gross value of the production in 1925, sixty-two and a half million dollars, was a record, and ali indications poi

    Jan 1, 1926

  • NIOSH
    RI 2469 The Desulfurization of Coke by Air

    By Alfred R. Powell

    In another paper the writer has described an investigation in which the forms of sulphur in coke were determined and described. Coke was found to contain four characteristic forms of sulphur- namely,

    Apr 1, 1923

  • AUSIMM
    Geotechnical Factors Affecting the Surface Placement of Process Tailings in Paste Form

    By D J. A Van Zyl, J C. Cunning

    Technological advances associated with the expanded application of paste technology in underground mine backfilling are now stimulating an interest in the disposal of process tailings as paste in the

    Jan 1, 1998

  • ISEE
    The Environmental Disturbance from Special Effects Blasting in Open Water

    By C. Adcock, R. Farnfield, G. Adderley

    The use of explosives to create special effects in the film industry is a well-known past time. A recent production required simulation of a large scale water splash from the effect of a statue fallin

    Jan 1, 2010

  • NIOSH
    IC 7433 Diamond-Drilling Blast Holes, Eastern Magnetite Mine C

    By McHenry Mosier

    Diamond -drilling blast holes at Eastern Magnetite Mine C is proving economical in boundary shrinks , in removing pillars not readily accessible for percussion drilling , and in driving scraper drifts

    Feb 1, 1948

  • TMS
    Application of a Self-Directed Process Control System in a Production Environment

    By S LeClair

    Intelligent manufacturing involves intelligent, product-directed systems that facilitate the on-line, real-time generation of an improving product process cycle. A first step in the journey relates to

    Jan 1, 1992

  • ABM
    High-turbulence Roll Cooling In Tata Steel Ijmuiden Hot Strip Mill 2

    By George Schipper, Peter Gelten, Pepijn Adriaen, Hugo Uijtdebroeks

    Tata Steel IJmuiden Hot Strip Mill 2 (HSM2, 5.5 Mtonnes/yr) is currently being upgraded, resulting in an increased rolling force and motor power capacity. With the current conventional work roll spray

    Oct 1, 2019

  • DFI
    Improved Drainage by Drilled Filter Drains, Dam Safety Upgrade, Case Study

    By Carl-Oscar Nilsson, Åke B. Nilsson

    "The embankment dam at Storfinnforsen is 23 m high and was completed in 1954. The dam has an impervious zone with timber sheet piles and a support fill of glacial till. The pore water pressure in the

    Jan 1, 2016