Search Documents

  • SME
    Application Of The Taguchi Orthogonal Array Design To Cr (VI) Solvent Extraction

    By M. Kul

    In this study, the effects of various extraction and stripping parameters, such as equilibrium pH (7.0, 8.5 and 10), extractant concentration (5, 10 and 20 volume %), organic-to-aqueous (O/A) ratio an

    Jan 1, 2010

  • CIM
    Use of Concrete 1n Mining at the Jeffrey Mine

    By D. P. R. Smyth

    The limestone reef reservoir at Swan Hills consists essentially of a "buildup" of successively smaller atoll-like layers. Precipitation of calcium carbonate within the lagoonal area of each layer esse

    Jan 1, 1961

  • CIM
    Determining Milling Parameters of a Pear-Shaped Ball Mill for Grinding High-Talc Oxidized Copper-Cobalt Ore

    By M. B. Kime, A. T. Kaniki

    "Grinding tests were conducted on an oxidized copper-cobalt ore using a pear-shaped ball mill. Twelve mono-sized ore fractions were prepared and wet ground batchwise. The mill was run for 0.5 to 30 mi

    Jan 1, 2017

  • TMS
    Cerro Verde Hydrometallurgical Plant Design Features and Operation

    By O. Durand

    The Cerro Verde Hydrometallurgical Plant, located at Arequipa in the southern part of Peru, started its operation in 1977 with a design capacity of 33,000 MT/year of copper cathodes. The plant has tr

    Jan 1, 1987

  • CIM
    Simulation of Extrusion Processes of Aluminum Profiles with Modeling of Microstructure

    By A. Ockewitz, A. Trondl, D. -Z. Sun

    "Numerical simulation of extrusion processes offers an efficient method for tool design and optimization of geometries and properties of extruded parts. However, until now there are few systematic inv

    Jan 1, 2018

  • SME
    Effect Of Topography On Ground Movement Due To Longwall Mining

    By A. W. Khair

    In 1985, an extensive longwall mining research project was initiated by the West Virginia University Research Center entitled "An Improved Longwall Mining Technique" with the purpose of providing oper

    Jan 1, 1987

  • SME
    An Integrated Process For Recovery Of Coal Fines From Waste Streams Using The Packed Flotation Column

    By D. C. Yang

    A practical and economical flowsheet has been developed and demonstrated by integrating the packed column flotation with the GranuFlow process for fine coal recovery. Orimulsion, which was used as an

    Jan 1, 1998

  • IMPC
    Relationship between Froth Behavior and Operating Parameters of Flotation Column

    By Amir Hajizadeh Omran, Mehdi Irannajad, Sima Mohammadnejad, Fardis Nakhaei

    "This study presents an experimental program performed to investigate the effects of flotation variables including gas flow rate, froth depth, slurry solids percent, frother/collector dosage and pH on

    Jan 1, 2018

  • IMPC
    The Use of Fenton’s Reagent on Selective Flotation of Chalcopyrite and Molybdenite

    By Hajime Miki, Gde Pandhe Wisnu Suyantara, Tsuyoshi Hirajima, Keiko Sasaki

    "Hydrogen peroxide (H2O2) is frequently used as an oxidizing agent in various applications. It has also been reported to reduce the recovery of sulfide minerals. Moreover, the previous work applied H2

    Jan 1, 2018

  • SAIMM
    Effect of Yield Strength on Wear Rates of Railway Wheels

    By J. W. van der Merwe, A. S. Bolokang, M. J. Phasha, V. J. Matjeke, C. Moopanar

    "Excessive wear rates on railway wheels can result in rolling-stock derailments. If wear is detected early the possible derailments can be prevented by prematurely replacing wheelsets, although the in

    Jan 1, 2016

  • AUSIMM
    Ore Selection and Sequencing

    By J E. Everett

    A block model of the orebody is used to plan a mine. The first requirement is to identify ore to be extracted, discarding waste, so as to meet target grade, generally in multiple analytes. Commonly, c

    Sep 5, 2011

  • SAIMM
    Evaluating the Value of Including Physicochemical Property Correlations on the Prediction Capability of a Dynamic Electrowinning Model

    By C. Dorfling, M. Tadie, S. Grobbelaar

    The physicochemical properties of the complex electrolytes used in direct copper electrowinning are an important consideration for the development of a high-fidelity model of the process. Direct elect

    Jan 1, 2023

  • TMS
    The Rotating Disc Study of Gold Dissolution with Bromine

    By Batric Pesic

    Dissolution of gold with elemental bromine was studied by using a rotating disc technique. The main parameters studied were: bromine concentration, stirring speed, pH, and temperature. Additionally, e

    Jan 1, 1991

  • SME
    Soluble Manganese Recovery From Mine Water Using A Laboratory Fluidized-Bed

    By Felicia F. Peng

    Using granular media for removal of soluble manganese from mine water and industry waste stream has the advantage of forming a compact surface layer of manganese oxide coating on the media. This proce

    Jan 1, 1996

  • AUSIMM
    The Wonawinta Silver Project – Value Engineering at Work

    By P G. Greenhill

    The Wonawinta silver project near Cobar in NSW is under development by Cobar Consolidated Resources Limited (CCR). RMDSTEM Limited is part of the owner’s team for feasibility, design, engineering, con

    Aug 8, 2011

  • SME
    Innovative Rehabilitation of Existing Tunnels under Minimum Impact on Operation

    By A. G. Nitschke, I. Ossenbühl, W. Dolsak, J. Dase

    "The authors have successfully developed an innovative rehabilitation concept, which meets actual technical standards and minimizes the impact on the operation of a key conveyor tunnel. A flexible and

    Jan 1, 2015

  • SME
    Assessment of the Role of Chemical Retardants on the Spontaneous Heating Liability of Coal - Mining, Metallurgy & Exploration (2024)

    By Sandeep Kumar Asarapalli, Sunil Kumar Bisoyi, Bhatu Kumar Pal

    Spontaneous heating of coal is one of the major concerns in the coal mining industry. Hundreds of millions of tons of coal are lost each year because of spontaneous heating. If necessary arrangements

    Dec 23, 2023

  • AUSIMM
    How to Create a Perfect Storm

    By A Chadwick, J de Ross, C Adams

    Imagine a æshinyÆ new mine, $1 B in the bank and record commodity prices. So how does a company and its management team create enough tension to maximise profit and to establish a culture that can wea

    Nov 20, 2012

  • AUSIMM
    Raising the Simulator Training Bar - Strategies for Improved Work Performance and Effective Utilisation of Site-Based Simulators

    By P Wood, S Leveritt

    This paper will introduce some innovative strategies for simulator training that are intended to improve the level of safety and operational performance of heavy equipment operators. The key strategy

    Sep 18, 2012

  • NIOSH
    RI 3241 Formulas For Designing Natural-Gas Pipe-Line Systems Consisting Of Parallel Lines

    By T. W. Johnson

    The United States Bureau of Mines, in cooperation with the Natural Gas Department of the American Gas Association, has been studying actively for the past several years the flow of natural gas through

    Jan 1, 1934