Search Documents

  • SME
    LA Metro Regional Connector Transit Project: Successful Halfway-Through Completion

    By Tung Vu, Michael Harrington

    "The Regional Connector project is a complex subway light-rail project that runs through the heart of downtown Los Angeles, CA. The design-build contract was awarded in April 2014 to the Regional Conn

    Sep 1, 2019

  • CIM
    Industry-Scale Knowledge Management— RISKGATE and Australian Coal Operations (3cf88131-5641-4c50-aff6-185a04067883)

    ABSTRACT This paper details the work of RISKGATE, the largest Australian Coal Association Research Program (ACARP) occupational health and safety initiative to date. The program is an interactive onli

    Jan 1, 2014

  • AUSIMM
    Decision Support for an Underground Gold Mining Operation - A Case Study using the Schedule Optimisation Tool

    By B Maybee, L Fava, D Millar

    In the context of a case study for an underground gold mine, the value generated by a schedule optimisation tool (SOT) is assessed. SOT is a software tool for underground mine planning that maximises

    May 24, 2012

  • CIM
    Tantalum Mining Corporation's Gravity Concentrator-Recent Developments

    By R. O. Burt

    The original flowsheet of the TANCO mill consisted of a simple two-stage gravity circuit for the recovery of the tantalum concentrates. With decreasing grade and grain size of the tantalum minerals, c

    Jan 1, 1979

  • AIME
    Exploration Of Cuban Iron-Ore Deposits.

    By DIFTIGIHT E. WOODBRIDGE

    (Glen Summit Meeting, June, 1911,) DURING April, May, and June, 1910, I was in charge of an examination of the greater part of the Moa iron-ore area in Oriente Province, Cuba, on the north coast, nea

    Mar 1, 1911

  • AUSIMM
    Dynamic drop testing of Sandvik’s D47 and D39 MDX bolts at the Swerim’s testing facility

    By B Darlington, L Sandberg, O Vallati

    The D47 and D39 Mechanical Dynamic Extra bolts (D47 MDX and D39 MDX) have been developed in response to the ever-increasing demand from the mining industry for rock bolts with high dynamic capacity. T

    Nov 29, 2022

  • CIM
    Thermomechanical Characterization of AA5182, AA6111, AA3104 Aluminum Alloys y the Direct Chill Surface Simulator

    By D. Larouche, M. Mardan

    Hot tearing is a complex defect in aluminium castings which is produced during solidification when a certain amount of liquid phase remains and weakens tensile resistance of the alloy. In direct chill

    Jan 1, 2006

  • AUSIMM
    Subordinate Structures – Considerations and Benefits

    By M J. Nugus

    The structural models developed by exploration and mining geologists are most commonly concerned with the ‘main structures’ or key constituents that pertain to the associated mineralisation. To this e

    Aug 22, 2011

  • AUSIMM
    Development and permitting of an underground mine at Cowal Gold Operations

    By J Northfield, L Neesham

    The GRE46 Underground Project lies beneath the environmentally unique and culturally endowed shore of Lake Cowal. The ore body is open both along strike and at depth and is currently defined to a stri

    Mar 15, 2021

  • SME
    Evaluation Of Cement Raw Materials

    By Donald Towse

    Portland cement is a basic building material in every country in the world, and, fortunately, the raw materials required in its manufacture are widely distributed. It is a low-priced bulk commodity (p

    Jan 1, 1970

  • SME
    Mining And Ore Control Procedures At Gold Fields' Ortiz Mine

    By David M. Rubio

    The Ortiz Mine is an open pit-heap leach gold operation in central New Mexico processing about 3,100 tonnes (3,400 short tons) per day. It is the initial mining property in the United States developed

    Jan 1, 1984

  • AUSIMM
    Design of Air-Blast Plugs for a Sublevel Caving Operation

    The Telfer Underground sublevel cave (SLC) Operation is located approximately 850 m below surface. The cave was designed to propagate through an old decline which was initially used to monitor the cav

    Nov 25, 2010

  • CIM
    Sinking of a Circular Air Shaft to No. 12 Colliery at New Waterford, N.S.

    By W. C. Risley

    IN the year 1933, workings at the No. 12 colliery, New Waterford, of the Dominion Coal Company, Limited, had advanced to a point where additional ventilation would soon be required. Furthermore, devel

    Jan 1, 1936

  • AIME
    Institute of Metals Division - Observations on the Structure and Sintering Mechanism of Cemented Carbides

    By J. Gurland

    THE microstructure of sintered carbides consists of particles of metal carbides, such as WC and TiC, embedded in a metallic binder which is usually a cobalt—or nickel-rich solid solution. One of t

    Jan 1, 1960

  • AUSIMM
    Optimum embankment design for a tailings dam

    By A Fyans, B Ghahreman-Nejad

    This paper discusses the method and results of an options study into selection of the optimal form for a 130 m high tailings/water retaining dam, located in a region of high seismicity in central Iran

    Jul 23, 2018

  • AUSIMM
    Does process control sampling always have to be a compromise?

    By M Singh, R C. Steinhaus, J J. Rust

    Metallurgical process control systems in mineral plants often employ state-of-the-art monitoring analysers in an attempt to optimise plant operations and enhance mineral recoveries. These systems are

    May 9, 2017

  • CIM
    Hydrometallurgical Processing of Bozshakol (Kazakhstan) Deposit Mixed Ore

    By K. K. Mamyrbayeva, G. Z. Guseinova, V. A. Luganov

    This paper presents the results of theoretical and technological studies on leaching ore of Bozshakol deposit. The major oxidized copper mineral of Bozshakol ore is atacamite, and the content of malac

    Jan 1, 2016

  • AIME
    The Laws of Fissures

    By BLABIEY STEVENS

    THE object of this paper is to present a theory of the formation of fissures which seems to be supported by all available data. The investigation is, in the main, an exact one, and irregularities of t

    Aug 1, 1909

  • SME-ICGCM
    Evaluation of Rock Excavation Technologies for Seismically Active Mines

    By S. Paul Singh

    "The long-term viability of seismically active and/or deep mining operations hinges upon the industry's ability to maintain profitability in a climate of increasingly difficult conditions, escalating

    Jan 1, 2010

  • NIOSH
    RI 8959 - Bulkheads and Drains for High Sandfill Stopes

    By R. L. Soderberg

    Large open stopes mined by vertical crater retreat or sublevel s are sometimes backfilled with uncemented sand to support the stope walls and alleviate rock bursts. The failure of bulkheads in two dif

    Jan 1, 1985