Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The George Fisher Project to Increase Recovery in the Mount Isa Lead/Zinc ConcentratorBy K S. Fisher, J D. Pease
The installation of the George Fisher flowsheet in the lead/zinc concentrator at Mount Isa Mines Limited has recently been completed. The George Fisher flowsheet involved moving flotation capacity fro
Jan 1, 2000
-
RI 5074 A Hydraulic-Powered Platform For Scaling High Backs And Walls - SummaryBy C. K. Rose
A hydraulic scaling rig was placed in operation at the Bureau of Mines oil-shale mine near Rifle, Colo., in 1953. The rig consists of a self-leveling platform mounted on a hydraulic-powered boom. The
Jan 1, 1954
-
Plenary Address: Slags and fluxes entering the new millennium: an analysis of recent trends in research and developmentBy R. Boom, K. C. Mills, S. Riaz
This paper details the recent trends in slag-related research from 1999 to 2003. The trends in thefollowing are outlined: • Annual publication rate • Geographical origin of the work • Nature of th
Jan 1, 2004
-
Environmental and Social Responsibility Practices ? Moving to a Global Level Playing FieldBy Arthur D. FitzGerald
EDC established an Environmental Review Framework in 1999. Throughout the early fall of 2001, the Corporation held public consultations across Canada to strengthen that framework, leading to a public
May 1, 2002
-
150th Anniversary Victoria Bridge, 1859 - mid-December, first train; 1860 August, celebrationBy H. J. McQueen
ORDER OF PRESENTATION ?INTRODUCTION TO THE VICTORIA BRIDGE ?REASONS FOR A BRIDGE AT MONTREAL ?RAILROAD BRIDGE REQUIREMENTS ?IRON PRODUCTION CANADA / WORLD AL ?METALLURGICAL INDUSTRY CANADA ?FA
May 1, 2011
-
Stress Issues Impacting Design And Stability At OCI Wyoming’s Big Island Trona MineBy J. F. T. Agapito, L. J. Gilbride, K. Hollberg
Room-and-pillar mining at the Big Island Mine uses narrow, yield (i.e., load transferring) pillars to achieve high resource recovery and productivity. Two flat-lying 3- to 3fi-meter (10- to 11fi-ft) s
Jan 1, 2004
-
Brunswick Mine SAG Mill Liner Design and WearBy Chris Larsen, Ian Orford, Marilene Renaud, Mike Cooper, Lud Strah
"An AG/SAG mill was commissioned at the Brunswick Mine concentrator in October 1998. This paper discusses the original liner design for the bi-directional AG/SAG mill, observed liner wear, subsequent
Jan 1, 2003
-
RI 9576 - Rock Mechanics Study of Shaft Stability and Pillar Mining, Homestake Mine, Lead, SD (In Three Parts)By M. E. Poad, M. M. McDonald, J. C. Johnson, W. G. Pariseau
A U.S. Bureau of Mines case study of pillar recovery in high-grade ore near the Ross shaft at the Homestake Mine, Lead, SD, has demonstrated the usefulness of the finite-element method for evaluating
Jan 1, 1995
-
Size Dependent Gold Deportment In The Products Of Copper Flotation And Methods To Increase Gold RecoveryPlant survey data has shown that gold recovery through a specific copper concentrator was significantly lower than copper recovery. Size-by-size analysis revealed that this was due to poor recovery of
Jan 1, 2003
-
OFR-132-80 Steering System Survey For Surface Mining EquipmentBy Jack L. Woodward
The evolution of surface mining equipment has resulted in larger, faster haulage units, loaders, etc., resulting in increased demands on steering technology. Careful analysis of these systems was warr
Jan 1, 1979
-
Hyperspectral image processing and analysis for exploration in the mining industryBy S Prakash, M Danish, D Kumar
The green energy transition is speculated to cause an increase in the demand for raw materials while recycling rates are improving; discoveries are required to maintain supply. Geological remote sensi
Sep 1, 2024
-
Shanxi Wanjiazhai Yellow River Diversion Project—Lots II & IIIBy Edgardo Fogli, Mario Lampiano, Antonio Nicola
The project is located in the northern region of the People’s Republic of China and was awarded to Impregilo, as sponsor of the Wan Long Joint Venture, in September1997. The project consists of fo
Jan 1, 2001
-
Potential for Revegetating Base-Metal Tailings at the Tui Mine Site, Te Aroha, New ZealandBy P E. H Gregg, D Horne, R B. Stewart, N Bolan
The Tui mine site is situated on the NW flank of Mt. Te Aroha, at approximately 400 m altitude. During underground mining operations two lead-copper-zinc ore bodies were exploited and processed on sit
Jan 1, 1995
-
On the Role of Dixanthogen in Froth FlotationOn the Role of Dixanthogen in Froth Flotation
Sep 13, 2010
-
Zooming Out – Learning to See Rehabilitation through Stakeholders’ EyesBy J L. Merritt
The mining industry seeks to engage with and respond to stakeholders through open consultation processes during the various phases of a mining project (Department of Industry, Tourism and Resources, 2
Jun 28, 2016
-
Ventilaticm Computer Programs – Then and NowBy Betty L. Gibbs
A clear and accurate knowledge of the status of ventilation in an underground mine is essential to continuing safe operation. In a small mine with a few working faces, the problem is simple and can ea
Jan 1, 1987
-
Mine Emergency Response Command Center Training Using Computer SimulationBy Launa G. Mallett, Dana Reinke, Charles Vaught, Michael J. Brnich
As mines become safer and major disasters fewer, the number of experienced emergency responders is decreasing. This decrease will create a gap in response expertise which could have serious ramificati
-
Phosphate Beneficiation – Trends of the 90’sBy Jinrong (Patrick) Zhang
Improvement of conventional flotation efficiency, separation of carbonates from apatite, recovery of phosphate values from phosphatic clay and other ways of utilizing the clay, disposal of clay slurri
Jan 1, 1993
-
Case History of the Discovery of the Hishikari Gold Deposit, JapanThe Hishikari gold deposit, discovered by the Metal Mining Agency of Japan, has become a giant class epithermal gold deposit with the highest grade of gold yet recorded in the world through detailed
Jan 1, 1995
-
Part X - Some Correlation Procedures Based on the Larson-Miller Parameter and Their Application to Refractory Metal DataBy J. B. Conway
Stress-vuptuve data for several of- the refractory metals are frequently found to yield a linear relationship between the Larson-Miller parameter and the logarithm of the applied stress. In such cases
Jan 1, 1967