Search Documents

  • CIM
    On the Optimal Profile of a Rock Slope

    By S. Utili

    "The optimal profile of a rock slope under given geometry constraint is investigated by means of the upper bound method of limit analysis. The optimal condition corresponds to maximizing stability fac

    Jan 1, 2015

  • AUSIMM
    Leaching Characteristics of Australian Uranium Ores

    The leaching characteristics of a number of Australian uranium ores were determined under acid and alkaline conditions. Ores from the Ranger, Nabarlek and Koongarra deposits in the Northern Territory

    Jan 1, 1979

  • SME
    Rock Mechanics Applications To The Design Of Oil Shale Pillars ? Introduction

    By Jose F. T. Agapito

    The mining engineer must be able to predict the structural behavior of the rock around underground openings so that he can answer questions relating to safety and economics. With the present status of

    Jan 1, 1974

  • DFI
    Case History: Estimating Ground Vibrations Caused By Pile Driving

    By Tracy Brettmann

    A new method for estimating ground vibrations caused by pile driving was developed as a result of a vibration monitoring program performed for a large pile driving project. The method is accurate, rat

    Jan 1, 1999

  • DFI
    Dynamic Analysis Correlation Of Standard Penetration Resistances With The Adhesion Of Very Stiff To Hard Clays On Driven Piles

    By Chris D. Thompson

    In Southern Ontario, Canada, piles are frequently driven through competent clayey soils to obtain end bearing on extremely dense till or bedrock. One reason for this is the difficulty at assessing the

    Jan 1, 2002

  • SAIMM
    Application Of Shotcrete At Oryx Mine

    By D. P. Venter

    When Oryx Mine down-scaled in 1994, focus was placed on development, with the primary aim being the exposure and proving of ore reserves. In order to achieve this aim, development ends had to be advan

    Jan 1, 1998

  • SME
    Performance Of A Soft Ground Tunnel On The Washington Metro

    By Edward J. Cording, William H. Hansmire

    INTRODUCTION The Washington Metro, a rapid transit system that will serve the District of Columbia, Virginia, and Maryland, has been under construction for about two years. Construction of the Metr

    Jan 1, 1997

  • DFI
    Design Parameter For Jacked Pile

    By Sugie Prawono

    Jacked pile is the only piling system in which the load capacity of the pile, at any penetration depth, could be monitored directly during its installation process. Each installed pile could have a gr

    Jan 1, 1999

  • TMS
    Properties and Benefication of Natural Sedimentary Zeolites

    By K. D. Mondale

    The chemical and physical properties of samples from ten sedimentary zeolite deposits. (representing chabazite, clinoptilolite, erionite and mordenite types), have been determined as a prelude to the

    Jan 1, 1988

  • SME
    Condemnation valuation : The taking of mineral bearing lands

    By M. C. Azar, W. B. Mason, G. L. Anderson

    Eminent domain overview Eminent domain is the power of the Government or a municipality to take property for public use without the consent or acceptance of the owner. Typically, the agency taking

    Jan 1, 1989

  • CIM
    Investigating Total Media Wear

    By Peter Radziszewski

    "Comminition process costs, which typically represent an important contribution to mining operating costs, can themselves be divided roughly between energy and liner /charge wear. As such, developing

    Jan 1, 2001

  • SME
    Cost Analysis for the Design and Operation of Sublevel Open Stoping

    By P. K. Chatterjee, G. D. Just

    Sublevel open stoping is a low-cost method that has been successfully employed in many large underground mining operations. Where ore body characteristics are suitable, extensive mechanization and the

    Jan 10, 1981

  • NIOSH
    Fatal And Nonfatal Injuries: MSHA Data

    This chapter presents an overview of fatal and nonfatal injuries reported to MSHA during 1986-1995. Reportable injuries follow the criteria for reporting specified in 30 CFR 50. These criteria are lis

    Jan 5, 2000

  • CIM
    Process Development at the Raglan Concentrator

    By Joe Holmes, Peter Langlois

    "Falconbridge’s Raglan Concentrator, located at the northern limit of Quebec’s Nunavik Region, has been in operation since December 1997. Originally designed to process 800,000 tonnes per year of high

    Jan 1, 2001

  • AUSIMM
    A General Description of Mining Operations at Vatukoula, Fiji

    Vatukoula, the Fijian equivalent of gold rock, is the name of the community embracing the gold mines owned and operated by Emperor Gold Mining Company Ltd., Loloma (Fiji) Gold Mines, N.L., and' D

    Jan 1, 1953

  • NIOSH
    OFR-151-81 Evaluation And Demonstration Of A New Post Disaster EM Communication Technique For Mines

    By M. P. Ristenbatt

    A new automated post-disaster signaling system, intended to use through-the-earth EM propagation, was demonstrated in the laboratory at an input SNR of -34 dB. The system presently available requires

    Jan 1, 1981

  • AIME
    Application Of Pyrometry To Problems Of Lamp Design And Performance

    By I. H. Van Horn

    IN the development of the incandescent electric lamp one aim of the investigators has been to establish the fundamentals of lamp design, so that the performance of any new lamp may be accurately predi

    Jan 9, 1919

  • DFI
    The Analysis Of Results From Routine Pile Load Tests

    By Bengt H. Fellenius

    THIS PAPER deals with the analysis of results from axial testing of vertical single piles, i.e. the most common field test per-formed. Despite the numerous tests which have been carried out and the ma

    Jan 1, 1988

  • SME
    Large Diameter Tunnel Boring Machine Development

    By Martin Herrenknecht

    The world?s growing population and rapidly proceeding urbanization are boosting an enormous demand for new and high-capacity infrastructures to secure the mobility of goods and people. Densely popula

    Jan 1, 2010

  • SME
    Underground Subway Construction Costs

    By Harry Sutcliffe

    THE PROBLEM Two and a half years have gone by since the December, 1976 Civil Engineering article on subway costs caused such a furore. What has happened in this interval? Even after discounting

    Jan 1, 1979