Methods Of Constructing Concrete Piles On Heavily Contaminated SitesBy N. C. Matheson
The West's Shell Pile has been used on sites with very soft ground conditions for over 60 years. Fibre reinforced precast concrete shells 900mm long are threadled onto an internal mandrel which c
Jan 1, 1989
-
Circular TunnellingThe work described herein is the opening phase of an extensive system of underground excavation undertaken under contract with a Malayan authority.The specifications called for the lining of all tunne
Jan 1, 1941
-
Solid-State 19F NMR On Cao-SiO2-CaF2 GlassesBy T. Watanabe, S. Hayashi, M. Hayashi, K. Nagata, H. Fukuyama
Chemical states of fluorine in CaO-SiO2-CaF2glasses in a composition range of CaO/SiO2=0.5?1.3 and 5?25 mol%CaF2have been investigated by 19F solid-state NMR with and without MAS. The isotropic chemic
Jan 1, 2004
-
Case History: Deep Soil-Cement Mixing At The I-90/I-93NB Interchange On The Central Artery/Tunnel Project, Contract C09A7 At Fort Point Channel Site, Boston, MA - SynopsisBy Robert Jakiel
The following paper is being presented to provide an understanding of the Deep Soil-Cement Mixing (DMM) performed at Contract C09A7 at the Fort Point Channel Site (FPC), for the I-90/I-93 Interchange
Jan 1, 2000
-
Pittsburgh Steelers Stadium - Deep Foundations Case StudyBy Larry Rayburn
In the spring of 1999, construction commenced on the new Steelers Football Stadium in downtown Pittsburgh, Pennsylvania. Richard Goettle, Inc. (RGI) was the successful bidder to install the specified
Jan 1, 2001
-
Blasting Mitigation Measures Used to Control a Highwall Failure RiskBy Jean-Sébastien Lambert, Joseph Kabuya, Richard Simon
Managing a highwall failure risk in an open pit mine by controlling and mitigating the impact of vibrations produced by blasting operations is key to achieving safe and cost-effective operations. The
-
Instrumentation Of Open Cut Subway Excavation For The Metropolitan Atlanta Rapid Transit Authority (MARTA)By Rodney K. Morrison
MARTA, The Metropolitan Atlanta Rapid Transit Authority, is building a 53 mile heavy rail transit system to serve the City of Atlanta. Phase A of the Rail System, consisting of approximately 14 miles
Jan 1, 1979
-
Main fan energy managementSouth Africa?s primary electricity supplier, Eskom, provides incentives to reduce power demand during critical times by granting capital through a Demand Side Management programme. DSM encourages the
Jan 1, 2009
-
Collector Consumption Heads or TailsBy J. A. Meech, R. J. Tucker
"Since the establishment of froth flotation as an effective method of mineral beneficiation there has been both academic and industrial interest in the levels of the various reagents required to perfo
Jan 1, 1984
-
Pre-Blast Surveys; a Public Relations and Claim Reduction Tool (b114a2f5-7740-4145-afd2-f7ffc2af0fcd)By David Harrison, Edward J. Walter, Meitra Ferek
Agreat tool in the prevention of blasting complaints and subsequent damage claims. In today’s highly competitive industry, we are always looking for ways to become more cost effective. This article in
Jan 1, 1995
-
Driven Pile Foundation Design And Construction Genentech Hall - UCSF Mission Bay CampusBy Robert E. Fosse
Driven 14-inch-square concrete piles were used as the foundations of Genentech Hall at the new University of California, San Francisco Mission Bay Campus. The five-story, steel eccentrically-braced fr
Jan 1, 2002
-
Wipfrag and Wipjoint - To Measure, Record and Predict Blast ResultsBy John A. Franklin, Tom C. Palangio, Norbert H. Maerz
WipFrag systems I and II have become the world standard in photoanalysis systems to measure fragmentation. Mines, quarries and excavating contractors can now easily measure blast results and track the
Jan 1, 1997
-
Coal Pillar Design Formulae Review and AnalysisBy Xinzhi Du
Coal strength is essential to analyze the stability of excavation in coal. It is well known that the strength of coal tested in the laboratory is size-dependent, and different size specimens will prod
Jan 1, 2008
-
The Effect of Faults, Delay Time and Scaled Distance on Vibration ParametersBy Enver Alan, MerkeziYapı
People are migrating because of economic, social, natural and political reasons. These natural and humane factors effects the distribution of populations. The need for tunnels has grown in order to pr
-
Dip Sampling Cyanide Gold Bullion at the Sons of Gwalia Gold Mine, Gwalia, Western AustraliaThe difficulty of accurately sampling cyanide gold bullion for valuation is well known, and nothing new or original is claimed in presenting this paper, but it was thought that a record of differences
Jan 1, 1931
-
OFR-54-(2)77 Exploration Of Illumination Concepts For Underground Coal Mines - Appendix D -- Design DrawingsBy Lon A. Williams
This appendix contains drawing lists and drawings of components and assemblies designed for the prototype portable and machine mounted lighting systems per Tasks II & IV of Contract No. H0220065.
Jan 1, 1976
-
Kinetics and Mechanism of the Low-Temperature Water-Gas-Shift Reaction on Au/CeO2 CatalystsBy M. Kinne
Catalyst preparation/ characterization Slightly modified DP (~Schumacher et al. Catal. Lett. 89, 109, 2003) CeO2 HAS 15 from Rhodia calcined in air for~ 2h BET: ~188m2/g, particles size: 5.7nm (TEM
Oct 1, 2003
-
Static-Load Hydraulic Piledriving: An Alternative System For Noise & Vibration-Sensitive Applications ? IntroductionBy Robert A. Field
Static-Load Piledriving systems utilize hydraulic push to advance piles into the ground. Dynamic systems (ie. hammers and vibratory equipment) utilize impact, or vibration, to advance the piles. S
Jan 1, 1995
-
RI 3264 Smelting In The Lead Blast Furnace Handling Zinciferous Charges. XV.-Slags From The Trail Blast FurnacesBy G. L. Oldright
The past reputation of zinc as an ingredient in lead blast furnace slags has been bad. Zinc is thought of as a cause of accretions in the shaft of the blast furnace, of hot tops, of the formation of "
Jan 1, 1934
-
IC 7815 Petroleum Refineries, Including Cracking Plants In The United States, January 1, 1957 ? Summary ? Crude-Oil CapacityBy J. G. Kirby
According to the Bureau of Mines annual survey, there were 319 petroleum refineries in the United States as of January 1, 1957 capable of processing 9,123,674 [ ]-barrels of crude oil daily. This was
Jan 1, 1957