Search Documents

  • AUSIMM
    Enhancing the Business Environment for Prospecting, Exploration and Mining (Past and New Initiatives)

    By K L. Temel, W P. Player

    The underlying message of this paper is that investment in prospecting, exploration and mining in New Zealand is welcomed. The Government's policy with respect to Crown owned minerals is for cont

    Jan 1, 1997

  • SME
    Evaluation of Geological Conditions Ahead of TBM Using Seismic Reflector Tracing and TBM Driving Data

    By Descour Jozef, Suguru Shirasagi, Takuji Yamamoto, Koji Murakami

    For TBM tunneling no visual inspection of excavated ground is possible. This may hinder the high-speed excavation, particularly in complex ground conditions. The TBM Excavation Control System was deve

    Jan 1, 2007

  • AUSIMM
    Investigation of the Ferruginous Manganese Deposits at Ripon Hills, Pilbara Manganese Province, Western Australia

    Ferruginous manganese deposits have been known at Ripon Hills since the late 1950s. The main group of deposits occur in an area 6 km by 5 km and these were extensively investigated by Longreach Metals

    Jan 1, 1977

  • AUSIMM
    Notes on the Geology of the Pinnacles Mine and District

    A homely simile will serve to epitomise an interpretation of the rock structures and associated phenomena of the block of country under review, as it appears to the writer.Disregarding the many thousa

    Jan 1, 1927

  • CIM
    Development and field testing of a tension measuring gauge for cable bolts used as ground support

    By P. Choquet, F. Miller

    "The development and testing of a simple low-cost gauge for measurement of tension in a cable bolt grouted in a borehole are presented. Its principle is based on a resistance wire which is wound on a

    Jan 1, 1988

  • DFI
    Pile Load Test Results Using The New Statnamic Method

    By Matthew Janes

    Quality control procedures are increasingly important with today's higher capacity foundations and complex loading conditions. The need for a mobile, repeatable, nondestructive and economical loa

    Jan 1, 1990

  • AUSIMM
    A New Metaheuristic Algorithm for Long-Term Open Pit Production Planning

    By C Niemann-Delius

    The problem of long-term open pit mine planning is a large combinatorial problem, which canÆt be solved easily by mathematical programming models because of the large problem size. In this paper a new

    Sep 26, 2011

  • AUSIMM
    Application of Mine Records to Reduce Project Risk During the Evaluation of Historical Goldfields

    By W B. Edgar, I M. Platten, C A. J Towsey, B W. Cuffley

    The evaluation of historical goldfields has been common over the past 15 years, reflecting changing economic conditions, improvements in knowledge and technology and lack of greenfield sites. Many gol

    Jan 1, 2009

  • ISEE
    "Journal: Evaluating and Managing Blasting Risk Part II"

    By Gordon Revey

    The challenge of managing blasting risk, types of risk, public perception, and a system for managing risk were covered in the first part of this article in the May/June 2000 issue of the Journal of Ex

    Jan 1, 2001

  • SAIMM
    Annual Financial Statements - Report Of The Independent Auditors

    To the members of The South African Institute of Mining and Metallurgy We have audited the annual financial statements of The South African Institute of Mining and Metallurgy set out on pages 483 t

    Jan 1, 2004

  • NIOSH
    IC 9154 Computer Modeling of the Effect of Mine-Fire-Induced Ventilation Disturbances on Stench Fire Warning System Performance

    By Linneas Laage, Thomas Weber, William Pomroy

    "Underground mine fires can significantly influence mine ventilation airstreams, in some cases throttling or even reversing airflows. As a result, the performance of a metal and nonmetal mine stench f

    Jan 1, 1987

  • AUSIMM
    Operations at Mount Isa Copper Smelter

    Operations of the new copper smelter at Mount Isa commenced on the 6th February, 1953. Prior to this date a paper by R. V. Anderson (1953) outlined the smelter layout, proposed operation and expected

    Jan 1, 1957

  • SME
    The Priceless Ingredients

    By Grant P. Cordon

    Our subject, "Safety, Legal, and Contracting," is a range of topics which covers a broad spectrum, but is obviously Intended to focus our attention upon certain particular aspects of tunnel problems.

    Jan 1, 1974

  • SAIMM
    The Influence Of Rockpass Excavation And Operation On The Structural Design Of Box Fronts

    By S. Achilleoudes

    This paper describes the various factors that contribute to the maximum design pressures acting on box fronts and how these factors influence the mass and economy of box front steelwork. The influence

    Jan 1, 2005

  • NIOSH
    Enhanced Surface Control For Roof And Rib Support

    By Stephen C. Tadolini, Dennis R. Dolinar

    The risk of injury caused by minor roof falls continues to increase in underground mining. Most ground control injuries result from small rock falls that occur in a supported area, but do not involve

  • AIME
    Institute of Metals Division - Fatigue Behavior of Hydrogen-Charged Tantalum (TN)

    By B. A. Wilcox

    ThERE are several reports in the literature which indicate that both solid-solution hydrogen and hydride precipitates can promote low-temperature em-brittlement of tantalum.1-3 For example, Imgram et

    Jan 1, 1964

  • SME
    Construction Of Drilled Shafts For The Upper Northwest Interceptor, Sections 1&2 Project?Sacramento, CA

    By Jeremy Theys

    The Sacramento Regional County Sanitation District (SRCSD) is improving the sewer system in the Natomas area of Sacramento, CA. The Upper Northwest Interceptor (UNWI) system is an ongoing series of tu

  • NIOSH
    RI 7070 New England Beryllium Investigations

    By William R. Barton

    Sampling to determine development potential of beryllium deposits was conducted at 31 New England localities. A total of 54 additional areas where the geochemical environment appeared favorable were s

    Jan 1, 1968

  • NIOSH
    The Effects Of Restricted Workspace On Lumbar Spine Loading

    By Mark S. Redfern, Kim M. Corneliusa, Christopher A. Hamrick, Sean Gallaghera

    Coal miners often handle heavy electrical power cables, weighing up to 10 kg per meter. These cables are manually lifted and attached to the mine roof to prevent damage from mobile underground equipme

  • SME
    New Dragline Bucket Improves Stripping Efficiency

    By Dean Bray

    During the past three years, a new rear-dumping dragline bucket technology has been patented, developed and tested at North Dakota coal mines. Field testing has shown that this new concept in draglin

    Jan 1, 1999