Search Documents

  • AUSIMM
    Flotation Research on Cassiterite of Tailings

    Flotation Research on Cassiterite of Tailings

    Sep 13, 2010

  • SME
    A Robust Water-Balance Method For Sizing Heap Leach Solution Ponds

    By J. R. Kunkel, V. Lishnevsky

    At mine sites, the operational and required storage volumes of solution and water storage ponds and reservoirs are usually calculated based upon a water-balance approach. Many climatological variables

    Jan 1, 2002

  • SME
    Reproducibility Of Bond Work Index With Different Standard Ball Mills

    By P. C. Fletcher, E. Kaya

    The Bond grindability testing procedure has been standardized to measure the same grindability values, i.e. Bond work index (BWi), for the same ore when tests are performed in different laboratories o

    Jan 1, 2002

  • SAIMM
    Discussion : Reichert cones for Witwatersrand gold ores

    By G. F. Balderson

    In response to the written contribution made by G. J. C. Young to the above paper, I would like to make the following points. Paragraph 1 The build-up of oxidized coatings on cone surfaces has n

    Jan 1, 1982

  • AIME
    Flotation of Diamonds

    By R. G. Weavind

    ONE of the most important fields of investigation at the Diamond Research Laboratory in Johannesburg is concerned with improvements in metallurgical practices for the diamond mining companies, with pa

    Jan 7, 1951

  • CIM
    Grinding Circuit Improvements at Barrick Goldstrike’s Roaster Facility

    By Jim Wickens, Andy Cole, John Pekrul

    "The roaster facility at Barrick Goldstrike Mine treats double-refractory sulfidic/carbonaceous gold ore. Prior to oxidation in the roasters, the ore is ground in two parallel dry grinding circuits ut

    Jan 1, 2003

  • ISEE
    Software Blasting Tools Integrated with Electronic Initiation Systems

    By Thierry Bernard, Jean Marc Laboz

    This paper explains why and how integration of EIS (Electronic Initiation System) with dedicated software tools can increase benefits to blasters and at the same time simplify the design of blast sequ

    Jan 1, 2000

  • TMS
    Pressure Leaching of Enargite-Pyrite Concentrates

    By María Cristina Ruiz

    Enargite rich copper concentrates can not be treated by conventional smelting/converting technology and thus nonconventional methods such as leaching must be used. Since enargite (Cu3AsS4) is a hard t

    Jan 1, 2010

  • SME
    CFD Studies on the Phenomenon of Gob Breathing Induced by Barometric Pressure Fluctuations

    By A. Juganda, Jr. Bogin, S. Saki, R. Gilmore, J. Brune, J. Grubb, S. Lolon

    "In longwall mines, atmospheric or barometric pressure fluctuations can disturb the pressure balance between the gob and the ventilated working area of the mine, resulting in a phenomenon known as “go

    Jan 1, 2016

  • SME
    Cost-Saving Strategies For Environmental Compliance

    By J. H. Kempton

    Refinement of environmental procedures can produce significant cost savings at most mines. Grouting permeable aquifers reduces water pumping and disposal costs. Stable groundwater quality supports red

    Jan 1, 2000

  • SME-ICGCM
    Monitoring Roof Beam Lateral Displacement At The Waste Isolation Pilot Plant

    By L. J. Terrill

    Lateral displacement in the immediate roof beam at the Waste Isolation Pilot Plant (WIPP) is a significant factor in assessment of excavation performance for the design of ground control systems. Info

    Jan 1, 1996

  • SME
    Underground Mine Ventilation: Some General Considerations

    By L. K. Marshall

    The importance of high quality underground mine ventilation is readily apparent. The principles of primary and auxiliary mine ventilation, however, are sometimes less readily apparent. The first artic

    Jan 1, 1982

  • NIOSH
    RI 7088 Low-Temperature Chlorination Of Ferrochromium - Preliminary Studies

    By R. L. de Beauchamp

    A preliminary investigation was made of the extraction of chromium from ferrochromium by low-temperature chlorination in the 3400 to 5250 C range. The objective was to devise a method for separating c

    Jan 1, 1968

  • SME
    Deep Ripping-Coal Seams Stockpile And Reclamation Application

    By T. G. Hayes

    Economic and environmental regulations in the coal industry have required companies to evaluate their current blasting method of loosening in-situ coal. This paper will review ripping vs. blasting thi

    Jan 1, 1995

  • NIOSH
    Reducing roof bolter operator cumulative trauma exposure - Ergonomics considerations for reducing cumulative trauma exposure

    By Kim M. Cornelius

    Musculoskeletal injury is a term used to describe a wide range of soft tissue disorders which affect the nerves, tendons, and muscles. Common examples include lower back pain, tendonitis, and carpal t

    Jan 1, 1997

  • NIOSH
    OFR-71-82 Feasibility Study Of Coal Dust Measurement By Light Reflectance Photometry

    By Irvin Pritts

    This report describes the design, fabrication, and testing of a prototype instrument which demonstrates the feasibility of determining respirable coal dust concentrations by light reflectance photomet

    Jan 1, 1981

  • AUSIMM
    The Effects of Collector and Grinding Environment on the Flotation Selectivity of Rosh Pinah Pb/Zn Ore

    The Effects of Collector and Grinding Environment on the Flotation Selectivity of Rosh Pinah Pb/Zn Ore

    Sep 13, 2010

  • NIOSH
    OFR-127-81 Surface Chemical Technology For Improved Wetting Of Coal Dust

    By Nathan Feldstein

    The wetting of coal dust by aqueous solutions of surface active agents (surfactants) has been studied. Selected for study were thirty coals and typical surfactants selected from the typical classes of

    Jan 1, 1981

  • DFI
    Caltrans Bridge Seismic Design/Retrofit Criteria ? Synopsis

    By Brian Maroney

    In this paper an overview of the California Department of Transportation's (CALTRANS) bridge design criteria is presented. Special emphasis is focused upon seismic design and retrofit criteria. T

    Jan 1, 1993

  • CIM
    Pebble Grinding At Bethlehem Copper Corporation

    By E. A. Lowe, J. W. Smith, C. W. Overton

    "The operations of Bethlehem Copper are situated in the south-central interior of British Columbia at an elevation of 4900 feet above sea level. Main road and rail transportation systems pass through

    Jan 1, 1975