Search Documents

  • SME
    Design/Build Agreement For The Niagara Tunnel Project

    By Russel Delmar, Rick Everdell, Harry Charalambu, John Tait

    Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam

    Jan 1, 2007

  • SME
    Hydrosizing of Industrial Minerals

    By Robert Moore Lewis

    A unit for separating minerals Into two prescribed size fractions, designated as a Lewis Hydrosizer, was developed at the North Carolina State University Minerals Research Laboratory Ore samples with

    Jan 1, 1983

  • TMS
    3-D Weld Pool Convection - A Dimensionless Presentation

    By Y. H. Wang, S. Kou

    "Three-dimensional weld pool convection was computer simulated using dimensionless variables. The electromagnetic force, the buoyancy force and the surface tension gradient on the pool surface were tr

    Jan 1, 1986

  • AUSIMM
    Horizontal Drilling Technology for Coal Seam Methane Recovery

    By Bockhorst R. W, Christopher D. A

    Over the past fifteen years, horizontal drilling in coal seams for advance degasification has become an established practice in the United States of America. Consolidation Coal Company pioneered t

    Jan 1, 1988

  • CIM
    An Investigation on the Effect of the Ore Particle Size on the Efficiency of Sarcheshmeh Copper Mine Crushing Unit

    By Mohsen Amir-Rahmat

    The ore of Sarcheshmeh copper deposit that has been located in the south ?east of Iran, contains four type of rock that they have their specific hardness and strength according to their alteration typ

    May 1, 2003

  • ISEE
    Improve Milling Through Better Powder Distribution

    By Jack Eloranta

    Optimization of blasting requires the comprehension of processes including drilling through milling. The author has previously considered the role of powder factor in relationship to downstream proces

    Jan 1, 2001

  • AIME
  • AIME
    The Preparation Of Brown Iron-Ores.

    By H. S. Geismer

    INTRODUCTION. THERE are three general methods available for obtaining commercial brown iron-ore : hand-screening; washing; and washing and concentrating. Hand-screening has produced a large tonnage

    Aug 1, 1911

  • ISEE
    Roadblocks: Increasing Production, Reducing Problems

    By Greg Parker

    "As the Explosives Industry continues to evolve and condense, those involved, such as Blasters,Contractors, Distributors and Consultants, continue to be challenged by both internal and externalforces.

    Jan 1, 1999

  • ISEE
    Death of a Coal Shovel

    By Roger G. Sprague

    With the passing of time, changing marketplaces and years of hard service, coupled with new machines, increased productivity, rapidly improving technology, equipment which used to be the latest in mod

    Jan 1, 1998

  • SME
    Sealing design

    Waste areas of a mine should be sealed especially if there is a risk of spontaneous combustion. Leakage through and around such seals can be problematic. Pressure balancing has been one of the favored

    Jan 1, 2009

  • AUSIMM
    The Development of a Non-Roasting Technology for Polymetallic Gold and Silver-Bearing Sulfide Concentrates Treatment

    The Development of a Non-Roasting Technology for Polymetallic Gold and Silver-Bearing Sulfide Concentrates Treatment

    Sep 13, 2010

  • TMS
    Characterization of Vitrified Tile Bodies with Kaolinitic Clay and Nepheline-Syenite

    By C. M. F. Vieira

    This work has as its objective to characterize ceramic bodies for vitrified tiles elaborated with the mixture of nepheline-syenite flux and kaolinitic clay. Formulations were prepared with 0, 30 and 5

    Jan 1, 2010

  • SME
    The Technology And Performance Of The Hi-Capacity Thickener

    By R. C. Emmett

    The industrial practice of concentration of solids and production of clear solution by gravity sedimentation is an old technology. Through the years, many devices have been designed and built to aid t

    Jan 1, 1978

  • SME-ICGCM
    Panel?scale Modeling of a Deep Longwall Panel: the MULSIM Alternative

    By Mark K. Larson

    Panel-scale modeling of stress changes induced by longwall coal mining is a challenging problem, particularly in deep mines of the western United States. Two common approaches to this problem are the

    Jan 1, 2013

  • CIM
    The effects of design and operating variables on rod mill performance

    By J. A. Finch

    "This paper describes major technical developments in rod mill design and operating practice since its introduction into the North American minerals industry over fifty years ago. The basic operating

    Jan 1, 1986

  • SAIMM
    Geotechnical Design Considerations For The Proposed Oyu Tolgoi Open Pits, Southern Mongolia

    By Peter Voulgaris, Allan Haines, Diane Walker, Ian de Bruyn

    The Oyu Tolgoi porphyry gold and copper project is located in the south Gobi region of Mongolia. The Ivanhoe Mines project has the potential to become a long-life copper and gold producer that could

    Jan 1, 2006

  • CIM
    A geological appraisal of the coal resources of Nova Scotia

    By Peter A. Hacquebard

    Recent drilling programs have shown that the in-situ coal resources of Nova Scotia are very substantial. The grand totals of the measured, indicated and inferred categories amount to 232 m, 646m and 9

    Jan 1, 1979

  • AUSIMM
    Northside Storage Tunnel Project

    By R J. Cuttler

    In January 1998 Sydney Water Corporation formed an Alliance with construction contractor Transfield, and engineering consultants Connell Wagner and Montgomery Watson, to design and construct the North

    Jan 1, 1999

  • SME
    Rock Mass Mechanical Behavior Assessment at the Porce III Underground Powerhouse Complex, Colombia

    By Ludger Suarez-Burgoa

    At the Porce III Underground Powerhouse Complex in Colombia, the observational method (Peck, 1969), was used to provide information to an underground wedge and a 2D Finite Element Method numerical mod

    Jan 1, 2008