Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design/Build Agreement For The Niagara Tunnel ProjectBy Russel Delmar, Rick Everdell, Harry Charalambu, John Tait
Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam
Jan 1, 2007
-
Hydrosizing of Industrial MineralsBy Robert Moore Lewis
A unit for separating minerals Into two prescribed size fractions, designated as a Lewis Hydrosizer, was developed at the North Carolina State University Minerals Research Laboratory Ore samples with
Jan 1, 1983
-
3-D Weld Pool Convection - A Dimensionless PresentationBy Y. H. Wang, S. Kou
"Three-dimensional weld pool convection was computer simulated using dimensionless variables. The electromagnetic force, the buoyancy force and the surface tension gradient on the pool surface were tr
Jan 1, 1986
-
Horizontal Drilling Technology for Coal Seam Methane RecoveryBy Bockhorst R. W, Christopher D. A
Over the past fifteen years, horizontal drilling in coal seams for advance degasification has become an established practice in the United States of America. Consolidation Coal Company pioneered t
Jan 1, 1988
-
An Investigation on the Effect of the Ore Particle Size on the Efficiency of Sarcheshmeh Copper Mine Crushing UnitBy Mohsen Amir-Rahmat
The ore of Sarcheshmeh copper deposit that has been located in the south ?east of Iran, contains four type of rock that they have their specific hardness and strength according to their alteration typ
May 1, 2003
-
Improve Milling Through Better Powder DistributionBy Jack Eloranta
Optimization of blasting requires the comprehension of processes including drilling through milling. The author has previously considered the role of powder factor in relationship to downstream proces
Jan 1, 2001
-
-
The Preparation Of Brown Iron-Ores.By H. S. Geismer
INTRODUCTION. THERE are three general methods available for obtaining commercial brown iron-ore : hand-screening; washing; and washing and concentrating. Hand-screening has produced a large tonnage
Aug 1, 1911
-
Roadblocks: Increasing Production, Reducing ProblemsBy Greg Parker
"As the Explosives Industry continues to evolve and condense, those involved, such as Blasters,Contractors, Distributors and Consultants, continue to be challenged by both internal and externalforces.
Jan 1, 1999
-
Death of a Coal ShovelBy Roger G. Sprague
With the passing of time, changing marketplaces and years of hard service, coupled with new machines, increased productivity, rapidly improving technology, equipment which used to be the latest in mod
Jan 1, 1998
-
Sealing designWaste areas of a mine should be sealed especially if there is a risk of spontaneous combustion. Leakage through and around such seals can be problematic. Pressure balancing has been one of the favored
Jan 1, 2009
-
The Development of a Non-Roasting Technology for Polymetallic Gold and Silver-Bearing Sulfide Concentrates TreatmentThe Development of a Non-Roasting Technology for Polymetallic Gold and Silver-Bearing Sulfide Concentrates Treatment
Sep 13, 2010
-
Characterization of Vitrified Tile Bodies with Kaolinitic Clay and Nepheline-SyeniteBy C. M. F. Vieira
This work has as its objective to characterize ceramic bodies for vitrified tiles elaborated with the mixture of nepheline-syenite flux and kaolinitic clay. Formulations were prepared with 0, 30 and 5
Jan 1, 2010
-
The Technology And Performance Of The Hi-Capacity ThickenerBy R. C. Emmett
The industrial practice of concentration of solids and production of clear solution by gravity sedimentation is an old technology. Through the years, many devices have been designed and built to aid t
Jan 1, 1978
-
Panel?scale Modeling of a Deep Longwall Panel: the MULSIM AlternativeBy Mark K. Larson
Panel-scale modeling of stress changes induced by longwall coal mining is a challenging problem, particularly in deep mines of the western United States. Two common approaches to this problem are the
Jan 1, 2013
-
The effects of design and operating variables on rod mill performanceBy J. A. Finch
"This paper describes major technical developments in rod mill design and operating practice since its introduction into the North American minerals industry over fifty years ago. The basic operating
Jan 1, 1986
-
Geotechnical Design Considerations For The Proposed Oyu Tolgoi Open Pits, Southern MongoliaBy Peter Voulgaris, Allan Haines, Diane Walker, Ian de Bruyn
The Oyu Tolgoi porphyry gold and copper project is located in the south Gobi region of Mongolia. The Ivanhoe Mines project has the potential to become a long-life copper and gold producer that could
Jan 1, 2006
-
A geological appraisal of the coal resources of Nova ScotiaBy Peter A. Hacquebard
Recent drilling programs have shown that the in-situ coal resources of Nova Scotia are very substantial. The grand totals of the measured, indicated and inferred categories amount to 232 m, 646m and 9
Jan 1, 1979
-
Northside Storage Tunnel ProjectBy R J. Cuttler
In January 1998 Sydney Water Corporation formed an Alliance with construction contractor Transfield, and engineering consultants Connell Wagner and Montgomery Watson, to design and construct the North
Jan 1, 1999
-
Rock Mass Mechanical Behavior Assessment at the Porce III Underground Powerhouse Complex, ColombiaBy Ludger Suarez-Burgoa
At the Porce III Underground Powerhouse Complex in Colombia, the observational method (Peck, 1969), was used to provide information to an underground wedge and a 2D Finite Element Method numerical mod
Jan 1, 2008