Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Drift Of Things (bdf812ad-2df7-4c56-8872-21c314be3141)By John V. Beall
There were no easily identifiable tourists. Everybody carried attaché cases and sported the buttoned-down look in dress. They were all there at the Hotel Indonesia to make a deal. But deals don't
Jan 1, 1970
-
Underground Work At CalaverasBy Kenneth R. Dickson, I. Michael Gowring
This paper describes the underground work associated with the North Fork Stanislaus River Hydroelectric Development currently being constructed by Sierra Constructors for the Calaveras County Water Di
Jan 1, 1987
-
Northland Halloysite ù Past, Present and FutureBy S Marsters
Imerys Tableware New Zealand Limited has mining rights to four deposits of halloysite, which are located about 203 km north of Auckland, New Zealand. These primary deposits were formed by the hydrothe
Jan 1, 2002
-
OFR-54-80 Natural Cementation Of Retorted Oil ShaleBy Clifford B. Farris
The natural cementation strength of retorted oil shale is the focus of this investigation. The optimum retorting temperature and residence time to obtain natural cementation strength in retorted Gr
Jan 1, 1979
-
RI 7303 Gas Combustion Retorting Of Oil Shale Under Anvil Points Lease Agreement: Stage IBy J. R. Ruark
This report presents results of mining operations and of research and development work done during stage I of the gas combustion retorting research program conducted by the Colorado School of Mines Re
Jan 1, 1969
-
-
-
Cement Deep Soil Mixed Walls/Grout Plug for Groundwater Cut Off and Excavation Support at the Bart Warm Springs ExtensionBy Harry Schnabel, Mitchell L. Fong, Douglas R. Jenevein, Thomas S. Lee
"The Warm Springs Extension (WSX) is one of a series of projects that will eventually extend the Bay Area Rapid Transit System (BART) from Fremont to San Jose, California. A cut and cover tunnel was u
Jan 1, 2015
-
An Algorithm for Evaluation of Mining Cycle Parameters and Analysis of Periodic Roof Weighting Using Monitored Longwall Shield Pressures and Shearer Location "Mining, Metallurgy & Exploration (2021)"By Anand Kumar, Debasis Deb, V. N. S. Prasad. M, A. K. Mishra
Shield leg pressure data from all shields and shearer locationwith time stamp from a mechanized longwall face are monitored and recorded in a surface computer. These data contain random noise due to p
Nov 19, 2020
-
Regional Characteristics Of Porphyry Copper Deposits Of South America (60581b2f-38cb-4f27-98be-ead4c1f7096f)By V. F. Hollister
Although it is apparent that porphyry copper deposits may have formed in the Andean orogen from Permian time onward, commercial deposits thus far developed appear to have Cenozoic ages only. Following
Jan 1, 1973
-
Investigating the Key Parameters of an Agent-Based Model of Mining Community Preferences for Managing Social RisksBy M. K. Boateng, K. Awuah-Offei
"Mining companies have started using quantitative tools, including computer models of community interaction, to gain intelligence on social risks surrounding their projects. Models of changes in commu
Jan 1, 2018
-
Geologic Mapping With The Aid Of Magnetics, Tahawus Area, New YorkBy Malcolm Heyburn
Airborne and ground magnetic surveys were made over and in the vicinity of the Sanford Hill ore body at Tahawus, Essex County, New York. These geophysical surveys served to: l. delineate, lithologic a
Jan 1, 1961
-
Utilization Of A Cross-Pit Bucket Wheel Excavator To Assist ReclamationBy J. L. Roll
The Surface Mining Control and Reclamation Act of 1977 (SMCRA) and the regulations promulgated for that "Act" have resulted in changes to surface mining operations in order to comply with the stringen
Jan 1, 1986
-
A Checklist for Evaluating Cab Design of Construction EquipmentBy N. Kumar Kittusamy
-
Crushing, Grinding and ConcentratingBy David Runnels
The Mount Wright iron are mine and upgrading plant were brought on line in the fall of 1975. The mine is located near the Quebec - Labrador border some six hundred miles northeast of Montreal. This pa
Jan 1, 1977
-
Underground Mill Excavation at the Big Missouri MineBy D. S. Campbell
THE chief factors influencing the decision to build the Big Missouri mill underground were the topography of the country and the climate. The location underground assured certain saving in the cost of
Jan 1, 1938
-
"Blue Mining" The Future of Mining Initial Considerations for Underground Pumped Storage PlantsBy M. Kellner
Due to continuously growing resource demands and increasing requirements for sustainability, safety and environmental protection on the other hand, the mining industry is being subjected to these addi
Aug 1, 2013
-
Notes on the Banking of CoalBy J. Mullins
Coal was first banked by the Dominion Coal Company, Limited, in 1898, near No. 2 Colliery, the same site as is presently used for that purpose. Though today there are banks at Glace Bay, Sydney, and S
Jan 1, 1931
-
Key Technologies of Integration of Coal Mining–Gangue Washing–Gob BackfillingBy Wei Yin, Yu Wu, Xiexing Miao
"For engineering problems of “three under” coal (coal trapped under buildings, waters-bodies and railways) exploitation, environment protection and gangue separation from raw coal underground exist in
Jan 1, 2015
-
The Feasibility of Applying Virtual Reality Simulation to the Coal Mining OperationsIn the last two decades, equipment used in the coal mining operations has become much more sophisticated. The way that work is organised and performed in the industry has also changed significantly. C
Jan 1, 2003