Search Documents

  • SME
    By-Product Marketing

    By Dennis R. Twining

    Recently a mining analyst for a major bank called me to say that during his travels he had encountered an electric utility interested in a new uranium supply. Since we produce uranium as a by-product

    Jan 1, 1983

  • TMS
    Electrode Tip Melting Simulation during Vacuum Arc Remelting of Inconel 718*

    By L. A. Bertram, F. J. Zanner

    "The goal of this paper is to present a tool to simulate transient melting of the electrode tip. This capability is needed to develop and test furnace control algorithms since experimental determinati

    Jan 1, 1986

  • SME
    The Lock Hopper Slurry Pump ? Summary

    By I. G. Bowen

    The pumping of abrasive and sometimes corrosive slurries is normally carried out at modest heads (say 100 ft) with specially designed centrifugal pumps. When heads become higher than this, two or more

    Jan 1, 1965

  • CIM
    Experimental Electric Smelting of Ores and Related Materials at the Department of Mines and Technical Surveys, Ottawa

    By G. E. Veins

    A three-phase, continuously-operated, 250 kv.a. electric smelting furnace has been installed at the Mines Branch, Department of Mines and Technical Surveys, Ottawa, for the experimental treatment of o

    Jan 1, 1957

  • CIM
    Reminiscences of Willet G. Miller

    By C. W. K

    This little sketch of the late Willet G. Miller, Provincial Geologist of Ontario, is intended to be neither a biography of his career nor a eulogy of his life. His biography has already been written i

    Jan 1, 1925

  • ABM
    Highly Flexible Deburring Grinding Solutions For Slabs, Blooms And Billets For Continuous Production

    By Norbert Asamer, Stefan Purrer

    Depending on the product or the material grade, conventional deburring machines, such as e.g. with rotating hammers, are in many cases not capable to reliably or completely remove burrs from the edges

    Oct 1, 2019

  • AIME
    The Notion Of "Extension Variance" And Its Application To The Grade Estimation Of Stratiform Deposits

    By Michel David

    One of the most important questions that arises in ore estimation can be stated as follows: What is the error when one extends the grade of a sample to a certain volume? The theory of regionalized var

    Jan 1, 1969

  • AIME
    Biographical Notice Of William Phipps Blake.

    By Rossiter W. Raymond

    (Canal Zone Meeting, November, 1910.) THE death of Professor Blake removes the oldest of American economic geologists and mining engineers, and deprives this Institute of one of its, earliest and mos

    Sep 1, 1910

  • AIME
    San Francisco Meeting Plans

    By AIME AIME

    THE revised program for the San Francisco meeting, with assignment of the various papers to the several sessions is now available and is printed below : MONDAY, OCT. 7 . General Meeting, 11-12 A.M

    Jan 1, 1929

  • DFI
    Ground-Supported Working Platforms For Tracked Plants And Mobile Cranes – Investigations Of Intercaction Effects

    By Moritz Schleeh, Christian Moormann

    Temporary working platforms are generally required in order to ensure that heavy construction machinery such as drilling and trench wall units, pile drivers, vehicle and crawler cranes can be set up s

    May 1, 2022

  • CIM
    The Fluosolid Roaster at Campbell Red Lake Mines, Limited

    By J. B. McKay

    It is the purpose of this paper to present an initial report on the construction and operation of the Fluo-Solid roaster at the property of Campbell Red Lake Mines, Ltd., Balmertown, Ontario. The roa

    Jan 1, 1951

  • AUSIMM
    Copper Leaching at Gunpowder

    By G D. Richmond, J C. Chomley

    Copper has been mined intermittently at Gunpowder, north of Mount Isa, since 1927. Most ventures have had some initial success but fluctuating copper prices, the small-scale of the operations and the

    Jan 1, 1998

  • CIM
    Development of Process Computer Control For Sherritt’s Ruttan Concentrator

    By G. M. Hughes, R. W. Dunn

    "AbstractCurrently installed an analogue instrumentation devices at Sherritt 's Ruttan Concentrator control. and/ or measure mill tonnages, grind, pH, density , some reagent and slurry flows, and cell

    Jan 1, 1977

  • SME
    Comparative Analysis of Open Pit Gold Mine Project NPV’s Under Price Uncertainty Using Real Options and Dynamic Mine Plans

    By M. Visnjic

    Open Pit Mine Production scheduling under commodity price uncertainty suffers from an exponentially increasing problem size as simulations and real options flexibility are used to generate and evaluat

    Jan 1, 2019

  • ABM
    Envio Direto De Pelotas Usina 8 (Vale) Para Abastecimento De Alto Fornos Na Arcelor Mittal Tubarão

    By Fabio Dummer

    Este trabalho apresenta o desempenho de duas grandes empresas, após a implantação do envio direto de pelotas da Usina de Pelotização Vale 8 para abastecimento dos Alto Fornos da Arcelor Mittal Tubarão

    Oct 30, 2017

  • SAIMM
    A Version of Gy’s Equation for Gold-bearing Ores

    The two methods for calibrating the parameters K and (alpha) for use in Gy’s equation for the Fundamental Sampling Error (FSE)–, Duplicate Sampling Analysis (DSA) and Segregation Free Analysis (SFA)–,

    Jan 1, 2017

  • AUSIMM
    Improving Rehabilitation Outcomes using Biocrusts

    By S Doudle

    The Iluka Resources Ltd Jacinth-Ambrosia heavy mineral sand mine (South Australia) is located in an undisturbed semi-arid landscape consisting of sparse trees, shrubs and grasses. The soil interspaces

    Oct 5, 2011

  • ABM
    Integração De Informações Na Automação De Fornos Industriais Combustol

    By Mario Teruo Enju

    Soluções flexíveis, com baixo custo de implantação e manutenção, de sistemas de controle de processos e informação utilizando tecnologias de ponta desenvolvidas em plataforma .Net Framework. Focadas i

    Jul 30, 2018

  • SME
    Limestone Scrubbing For High Sulfur Coal ? Introduction

    By Robert E. Barry

    For new coal-fired power plants, federal regulations require that emissions of sulfur dioxide be limited to 1.2 pounds for every million BTU'S burned. This is equivalent to coal with a sulfur con

    Jan 1, 1974

  • CIM
    Some Testwork Interpretations

    By J. C. Loretto, H. A. Simons

    The paper discusses how, in the routine testing of ores, insufficient communication between the laboratory and the design personnel can lead to misunderstanding or misinterpretation of test results an

    Jan 1, 1972