Search Documents

  • AIME
  • CIM
    The Metallurgy of High Strength Linepipe Steels

    By A. J. DeArdo

    Linepipe steels have come a long way in the past forty years. In fact, modern, high strength steels for large diameter linepipe applications represent one of the seminal accomplishments in metallurgy

    Jan 1, 2005

  • CIM
    Characterization of Nanometer and Ultrafine Diesel Aerosols in the Underground Mining Environment

    By Aleksandar D. Bugarski

    Despite extensive research efforts conducted in the past decades, occupational health risks associated with exposure to nano and ultrafine aerosols emitted by diesel power equipment are still not comp

    May 1, 2007

  • SME
    Things We'd Have Done Differently at Chimney Creek (1989)

    By John Marsden, John Mansanti, Jim Arnold, Mike Gleason

    DOUG HALBE: We're not quite to the end of our session, but we're close. We've had a lot of fun with some of these spill ideas. But these are serious problems, and I think we might be ab

    Jan 1, 1998

  • IMPC
    Increasing Drying Efficiency by Modifying the Design of Feed Chute of the Gol-E-Gohar Pelletizing Plant Ball Mill

    By S. Banisi, A. R. Hasankhoei, A. R. Ghasemi, E. Razi, G. A. Parsapour

    At the pelletizing plant of the Gol-E-Gohar mining and industrial company two parallel dry closed grinding circuits, each with the average throughput of 300 t/h, are used. Each grinding circuit consis

    Jan 1, 2018

  • NIOSH
    IC 8954 Automatic Fire Protection For Mobile Underground Mining Equipment

    By Guy A. Johnson

    To improve productivity and cut costs, modern underground mining operations have become more mechanized. This mechanization has increased the usage of fuels, hydraulics, and electrical equipment assoc

    Jan 1, 1983

  • CIM
    The Changing Canadian Nickel Smelting Landscape - Late 19th Century to Early 21st Century

    By C. M. Diaz, S. W. Marcuson

    In the late 19th century, the discovery of rich nickel-copper sulfide ore bodies in Sudbury and the need for tonnage quantities of the metal to be used in nickel steel armor provided the foundation fo

    Jan 1, 2005

  • SME
    Fine Particle Flotation ? Introduction

    By Thomas P. Meloy

    Floating "fines" differs from floating "sands" because the fines have a much larger surface area compared to their mass. The forces that arise from this large specific surface the key to understanding

    Jan 1, 1962

  • AIME
    Optimizing Grades of Coal Cleaning in Mineral Processing - Circuit Analysis (e548b55d-7923-4ea4-a114-14cbb89d7ef6)

    By T. P. Meloy

    Economic constraints require that the optimum mineral processing circuit be chosen for a given ore and then the circuit be optimized. Meloy (1983) developed a general methodology for finding the best

    Jan 1, 1984

  • TMS
    Recovery of Palladium from Spent Catalysts—A Critical State-of-the-Art Review

    By Paula Ana Paiva

    The high economic value and unique technological properties of the platinum-group metals (PGMs), plus their growing scarcity in the Earth’s crust, justify the crucial importance of developing recyclin

  • NIOSH
    RI 2113 The Field of Work of the U.S. Bureau of Mines

    By Van H. Manning

    "Under the organic act establishing it, the Bureau of Mines is authorized to conduct investigations designed to improve health and safety conditions in the mineral industry and to promote efficient de

    Apr 1, 1920

  • DFI
    Deep Foundation Shoring in South Florida

    By Douglas C. Brunot

    Mabey Inc. is providing for the shoring design for the Naples bay Center project, located in Naples, FL. The excavation is approximately 374' long by 164' wide and is 27'-8" deep at the shoring line w

    Jan 1, 2018

  • IMPC
    Expansion from 18 Mtons to 36 Mtons at the Aitik Concentrator

    By N. J. Bolin

    The Aitik copper mine is located in the north of Sweden and the concentrator at the mine started its operation in 1968 with a capacity of 2 Mton ore per year. Since then the operation has expanded sev

    Jan 1, 2014

  • CIM
    Coordination Guidelines for Virtual Design and Construction

    By Anoop Sattineni

    Over the past decade the use of BIM in the AEC industry has grown several fold and with it the number of standards available for implementing BIM. The ?National BIM Standard? by buildSmart Alliance, t

    Aug 1, 2013

  • AUSIMM
    Utilising Orebody Knowledge to Improve Comminution Circuit Design and Energy Utilisation

    By M S. Powell

    In this paper it is argued that we are entering a new mining era, based on considerably more challenging orebodies as we rapidly expand minerals production by exploiting previously uneconomic deposits

    Sep 29, 2013

  • AUSIMM
    Data Metallogenica ù Around the Pacific Rim and Across the World

    By A D. T Goode

    Data Metallogenica (DM) is unique as a global mineral sample collection and deposit database with over 70 000 rock samples and a wide range of descriptive, photographic and measurement data. Subscribe

    Jan 1, 2004

  • NIOSH
    OFR-6(5)-81 Mine Electrical Power Systems - Transients Protection, Reliability Investigation, And Safety Testing Of Mine Electrical Power Systems - Vol. V - Periodic Inspection Of Mine Electrical Power Systems

    By E. K. Stanek

    This report contains the results of an investigation into the feasibility of periodically measuring parameters of the insulation for a mine electrical power system in order to detect incipient faults.

    Jan 1, 1979

  • AIME
    Report Of Committee On Uniform Mining Laws For Prevention Of Mine Accidents.

    By AIME AIME

    TO THE AMERICAN MINING CONGRESS. AMERICAN INSTITUTE OE MINING ENGINEERS. MINING AND METALLURGICAL SOCIETY OF AMERICA. The committee that makes this report was appointed at the meeting of the Americ

    Jan 10, 1910

  • AUSIMM
    A ‘no tailings dam future’ – preconcentration strategies ‘down the sizes and across the value chain’

    By P Revell, B Adair, D King, L Keeney

    Grade Engineering®, integrated across the mine value chain, has a pivotal role to play in achieving step change reductions in energy and water usage in mine operations. High levels of gangue rejection

    Nov 10, 2020

  • AUSIMM
    E26 Lift 1 North block cave development and construction

    By R Cunningham

    The E26 Lift 1 North Project took 37 months from the approval on 1st January 2019 to the commencement of production on 1st March 2022. This was five months ahead of the feasibility plan. When compared

    Mar 29, 2023