Search Documents

  • SME
    The Integration Of Overburden Casting Techniques Into The Mine Production Cycle

    By D. A. Smith

    The successful integration of overburden casting techniques into the mine production cycle can be an extremely cost effective use of explosives. The entire mining cycle revolves around the cast blasti

    Jan 1, 1993

  • ISEE
    Journal: From the Executive Director / The Explosives Industry and the New Economy / ISEE’s 35th Anniversary marks economic challenges

    By Jeff Dean

    As the Society celebrates its 35th year as an explosives industry association, it is clear that we are part of an industry that covers many sectors of economic activity. We are the voice of those who

    Jan 1, 2010

  • AUSIMM
    Systems and Protocols of Geological Information Management at Telfer Gold Mine, Western Australia

    By G R. Howard, G Back

    Management of information systems for data collection is essential to maintain data integrity and continuity, and manage loss control on a large world-class mine such as Telfer Gold Mine. This paper a

    Jan 1, 2000

  • SME
    The Valuation Of Dimension Stone Building Deposits

    By W. Robert Power

    Dimension stone includes a wide variety of natural materials that are put to an equally wide variety of uses. It is possible to classify dimension stone according to the end use to which the stone is

    Jan 1, 1972

  • AIME
    Mining - Theory and Practice of Rock Belting

    By T. A. Lang

    For permanent structure underground, where rock is not competent, support usually consists of concrete or reinforced concrete. However, temporary supports in the form of timber or steel are often nee

    Jan 1, 1961

  • NIOSH
    RI 3479 Review Of Cutler's Rule Of Well Spacing

    By R. V. Higgins, H. C. Miller

    "INTRODUCTION The development of methods for determining the total quantity of crude oil that a given pool could be expected to produce in the future and the well-spacing and drilling programs most li

    Nov 1, 1939

  • RMCMI
    Morning Session Wednesday, June 26, 1957

    The Wednesday Morning Session of the Rocky Mountain Coal Mining Institute was called to order by Albert Keenan of the Thompson Creek Coal and Coke Company, Denver, Colorado, in the absence of the Pre

    Jan 1, 1957

  • SAIMM
    Research On The Foaming Property Of Blast Furnace Slag Bearing TiO2

    By H. Pei

    PZH (Pan Zhi Hua) Iron and Steel (Group) Corporation, the biggest steel company in southwest China, has been using titanium-vanadium-magnetite as the main raw materials for blast furnace iron making p

    Jan 1, 2004

  • NIOSH
    OFR-131-84 Design, Develop And Demonstrate The Use Of Hollow Cutter Bars/Evaluation Of Wet Bar Techniques

    By Terry Muldoon

    In conventional noncoal, room-and-pillar mining, the cutting machine is frequently a major source of airborne dust. Water is often used for dust control. An evaluation of typically used water systems

    Jan 1, 1983

  • CIM
    Road to Resources A Two-Way Street

    By Arthur Laing

    "IT is indeed a pleasure to have the opportunity of addressing this group today. Not only does it give me the opportunity of meeting with representatives of what is considered by many to be the most d

    Jan 1, 1966

  • CIM
    A Comparison of Ferrihydrite and Aluminum-Modified Ferrihydrite for the Removal of Arsenate from Aqueous Solution by Co-Precipitation

    By J. W. Hohn

    The precipitation of Fe(III) to form ferrihydrite in the presence of arsenic is the United States EPA's Best Demonstrated Available Technology for treating arsenic-containing hydrometallurgical s

    Jan 1, 2006

  • AIME
    Deep Well Pumping In California

    By Hallan Marsh

    THE subject of this paper is apt to bring to mind wells ranging from 6000 to over 8000 ft. in depth. However, it is uncommon to pump wells at depths greater than about 5000 ft. Fig. 1 shows the number

    Jan 1, 1928

  • SME
    Practical Solutions Of Machinery And Maintenance Vibration Problems - Understanding Resonance

    By Ralph T. Buscarello

    For practical purposes, the terms "natural frequency," "resonance" and "critical speed" are synonymous. A part passing though its "critical" or "critical speed" may also be said to be "resonant" or "r

    Jan 1, 1970

  • DFI
    The Evolution of Augered Cast-in-Place Piles

    By Willie M. NeSmith, W. Morgan NeSmith, Alan Roach

    "In 2013, Augered Cast-in-Place (ACIP) piles are a mature foundation technology throughout the United States. General guidelines for the design and construction of ACIP piles are available along with

    Jan 1, 2013

  • NIOSH
    OFR-107-82 Demonstration Of Coal Mine Illumination Systems (Machine Lightning Design For Coal Mine Applications)

    By William F. Hahn

    This project focused effort on three separate areas: demonstration of a low seam longwall illumination system, design of illumination systems for low coal auger miners, and an assessment of machine li

    Jan 1, 1982

  • SME
    Mini Symposium - Coal Pile Management Policies And Practices ? Coal Utilization - Coal Pile Management Policies And Practices - Heating Of Coal I~n Stockpiles - Introduction

    By William L. Husk

    Stockpiles have always been a necessary part of coal mining except, perhaps, when a person was mining only for the needs of his family from a seam on his home place or coal mined for the use of a smal

    Jan 1, 1981

  • CIM
    Potential of Sensor-Based Sorting for The Gold Mining Industry (93612de3-4206-4802-ac82-31d158d41b35)

    By H. Wotruba, L. von Ketelhodt, M. Kowalzcyk, M. Robben

    ABSTRACT Decreasing reserves, water shortages, increasing energy costs, and environmental and social constraints are challenges to the gold mining industry that must be met with innovative machines an

    Jan 1, 2013

  • TMS
    Dissolution of Gold with Bromine from Refractory Ores Preoxidized by Pressure Oxidation

    By Batric Pesic

    Recovery of gold from refractory ores was studied by pressure oxidation as the method of ore pretreatment followed by bromination of oxidized residues. Three different ores were examined, Au-Ag, Au-Ag

    Jan 1, 1992

  • CIM
    Introduction of and Experience Gained With Cemented Hydraulic Fill at the Gossan Hill Mine, Western Australia (5fc42dae-6b1c-469d-926f-1a8ca2654f54)

    On the 26th of June 2000 a hydraulic fill retaining barricade failed at the Bronzewing mine in Western Australia. The barricade failure resulted in the release of 19,000 m3 of saturated hydraulic fil

    May 1, 2007

  • AIME
    Work Measurement and Coal Mining

    By Theodore M. Barry

    Work measurement is the most common of many titles given to determining the amount of human work required to do any job. A new technique-like most modern management tools-it still needs years of const

    Nov 1, 1955