Search Documents

  • SME
    NPV Or IRR? Why Not Both? (d5648446-7f8d-4e8f-bd84-e1fb937dd64c)

    By T. F. Torries

    The primary merit criteria used by the mining industry is internal rate of return (IRR) rather than net present value (NPV) although NPV is favored by academicians. This paper discusses the problems w

    Jan 1, 1997

  • NIOSH
    RI 7277 Factors Affecting Detonation Velocities Of Desensitized Nitroglycerin In Simulated Underground Fractures

    By J. S. Miller

    The Bureau of Mines conducted surface tests to determine the feasibility of using liquid explosives for underground rock fracturing. The effects of configuration, confinement, length, critical layer t

    Jan 1, 1969

  • AUSIMM
    Taxation Neutrality in Mining

    The Government signalled its intention in the Economic Statement on 17 December 1987 to improve the fairness of the taxation system and to facilitate the process of economic adjustment by: removing t

    Jan 1, 1988

  • TMS
    Emission Control of Air Pollutants in Hot-Dip Zinc Galvanizing Plants

    By W. Riekehof

    The paper explains required practice and equipment for capturing airborne fumes and particulates in hot-dip zinc galvanizing plants. An economic and technical comparison of enclosure and tank rim suct

    Jan 1, 1992

  • AUSIMM
    Marmatite Depression in Galena Flotation

    By G Hobart

    Laboratory flotation tests were conducted to investigate the role of pH, zinc sulfate and potassium metabisulfite in the flotation of galena and marmatite in the Broken Hill orebody. Marmatite was dep

    Jan 1, 2005

  • CIM
    Maintenance control system software from Caterpillar

    By V. Casaletto, L. Widdifield

    "Equipment capable of higher production requires more sophisticated maintenance programs. Reduction in fleet size through use of modern technology requires higher utilization and greater availability.

    Jan 1, 1992

  • AUSIMM
    Practical Implicit Geological Modelling

    By H J. Ross, R K. Beatson, T J, W R. Fright

    Traditional method of explicitly defining three-dimensional (3D) ore-waste and geological boundaries relies heavily on a time-consuming process of manual digitisation. This method of modelling can be

    Jan 1, 2003

  • CIM
    The Pacific Great Eastern Railway

    By Thomas Kilpatrick

    The liability created by building this railway is the great financial problem before the people of British Columbia at the present time. In dealing with the subject, I propose to divide it into three

    Jan 1, 1925

  • NIOSH
    MLA 23-87 - Mineral Resources Of The Little Humboldt River Study Area, Elko County, Nevada - Summary

    By Peter N. Gabby

    A mineral purvey of 40,000 acres of the 42,213-acre Little Humboldt River Wilderness Study Area was conducted by the U.S. Bureau of Mines in 1985 at the request of the U.S. Bureau of Land Management.

    Jan 1, 1987

  • AIME
    Summary of Hecla Reconstruction

    By E. L. WOOD

    IN ATTEMPTING to summarize briefly the reconstruction of the Hecla plant since the fire, three important facts must be held in mind; namely: a hurry-up job with the shadow of an insurance company in t

    Jan 1, 1924

  • SME
    Industrial Minerals 2004 - Diatomite

    By A. Founie

    The United States continues to be the world’s leading producer and consumer of diatomite. Production of diatomite in the United States during 2004 was estimated to be 635 kt (700,000 st). This was a

    Jan 1, 2005

  • SME
    The methane-air explosion hazard within coal mine gobs

    By Jürgen Brune

    This is a shortened version of the paper ?The Methane-Air Explosion Hazard Within Coal Mine Gobs published in the 2013 volume of SME Transactions (Brune, 2013, pp. 376-390). This paper analyzes the e

    Feb 1, 2014

  • SME
    Limestone Marketing In A Changing Economy - The Economic Realities

    By Robert C. Freas

    While on the surface limestone marketing may appear mundane, it has continued to provide a series of challenges beyond the realm normally envisioned with this industry. This paper presents a case hist

    Jan 1, 1981

  • DFI
    Piling Design and Construction Codes and Standards for Buildings A United States Perspective

    By Rudolph P. Frizzi

    "Abstract Pile design for building structures in the United States is typically performed by: 1) investigating and assigning engineering parameters to the respective ground bearing materials, 2) calcu

    Jan 1, 2014

  • CIM
    Geology of the Moose Mountain Mine and its Application to Mining and Milling (77523cfb-fb7e-48bc-bc17-49c8c4bf638c)

    By G. D. Markland

    "The Moose Mountain mine is located in a belt of Precambrian volcanic rocks situated 20 miles north of Sudbury, Ontario. It was the first iron mining operation in the Archean iron-formations of the Ca

    Jan 1, 1966

  • AUSIMM
    Historical Challenges, Modern Solutions at Ballarat East

    By M Sykes

    Gold was initially discovered at Ballarat in 1851. After initial alluvial mining, underground quartz mining commenced in 1853, continuing until 1918. The historic miners were considered to be capable

    Jan 1, 2008

  • CIM
    AG Milling with and Without Pebbles Recycle - Effect on Multi-Component Ore Deportment and Throughput

    Palabora Mining Company (PMC) processes a multi-component ore body using a circuit consisting of two AG mills in parallel, closed with vibrating double deck screens and hydrocyclones. The bottom scree

    Jan 1, 2012

  • AIME
    Part III – March 1969 - Papers- Epitaxial Growth of GaAs1- x Px on Germanium Substrates

    By R. W. Regehr, R. A. Burmeister

    Epitaxial growth of GaAs 1-xPx on germanium substrates was achieved using an open tube vapor transport system. The compositional range of 0.3 < x < 0.4 was examined. The best results were obtained

    Jan 1, 1970

  • AUSIMM
    Strategy and Tactics Implemented to Achieve Energy-efficient Ventilation and Cooling of Mines

    By J J. L du Plessis

    Escalating energy and electricity costs have become one of the biggest expenditure drivers in mining operations. During the last eight years, energy costs have trebled when expressed as a percentage o

    Aug 31, 2015

  • SME
    A Comparison Of Em Emission Reduction Methods For Personal Dust Monitors - SME Annual Meeting 2023

    By Y. Zhang, M. Yekich, C. Zhou, C. Jobes, J. Galanko, D. Tuchman, J. Srednicki, J. Carr

    The continuous personal dust monitor (CPDM) is an essential instrument for working in hazardous environments, is used to monitor real-time coal dust exposure, and is mandated by the Mine Safety and He

    Feb 1, 2023