Search Documents

Search Again

Search Again

  • TMS
    Redesign and Rebuild of the Pan Pacific Copper Flash Smelting Furnace

    By Glenn Stevens

    After 40 years of operation with the original design, Pan Pacific Copper determined it was necessary to rebuild the Saganoseki Flash Smelting Furnace to continue safe operation. The original design em

  • SME
    Design Of Quality Assurance Programs For Coal Mines

    By B. A. Bancroft

    A quality assurance program consists of all those activities aimed at providing confidence to the purchaser that the suppliers quality system will provide a product that will satisfy the purchaser&apo

    Jan 1, 1994

  • SME
    Large Diameter Shaft Drilling; A Versatile Tool For Advanced Mining Applications

    By D. R. Zeni

    Current mine development requires the safe, 'expedient, economical construction of vertical shafts for ventilation and access in diverse ground conditions. Advancements in large diameter shaft dr

    Jan 1, 1994

  • CIM
    Depleted Uranium Processing and Fluorine Extraction

    By Steve T. Laflin

    Since the beginning of the nuclear era, there has never been a commercial solution for the large quantities of depleted uranium hexafluoride generated from uranium enrichment. In the United States alo

    Aug 1, 2010

  • NIOSH
    IC 6849 List Of Standard Starters Available To Prospective Builders Of Permissible Outfits

    By H. B. Brunot

    The United States Bureau of Mines under provisions of Schedule 2C4 issues approvals covering complete operating units such as loading machines, room hoists, and storage-battery locomotives. Certain ma

    Jan 1, 1935

  • IMPC
    A roadmap for simulation

    By Alan Bye, Nick Beaton, Wayne Stange, Emmy Manlapig, James Groutsch

    "For over 50 years the JKMRC has applied a unique education-based research strategy to develop modelling and simulation tools that are "fit for purpose" for industrial application. These tools are wid

    Jan 1, 2014

  • CIM
    Experiments in Real-Time Map-Based Underground Global Positioning

    By S. Radacina Rusu

    The satellite-based global positioning system (GPS) has significantly changed the way site operations are carried out in surface mining. The GPS has impacted safety, productivity, fleet efficiency, an

    May 1, 2011

  • CIM
    Development of the Cigar Lake Jet Boring Mining Method

    By M. L. Wacker

    "Cigar Lake high-grade uranium mine in Saskatchewan is operating after 25 years of test mining, construction, and mine flood remediation. Factors include ground stability, groundwater control, radiati

    Jan 1, 2017

  • SME
    Ten Common Mistakes In Conveyor Specification And Design

    By R. T. Swinderman

    This paper discusses how many of the common practices in conveyor specification and design are out of date compared to the current expectations of users for safe, serviceable, reliable, and fugitive m

    Jan 1, 2010

  • SME
    World’s largest live tunnel connection at TARP McCook Tunnel

    By Faruk Oksuz, Dave Schiemann, Matt Trotter, Mike Padilla, Carmen Scalise, Miquel Sanchez

    "The McCook Main Tunnel system consists of a 10-m (33-ft) finished diameter, 490-m (1,600-ft) long, hard rock tunnel constructed from a 27.5-m (90- ft) diameter and 92-m (300-ft) deep main gate and tu

    Sep 1, 2016

  • CIM
    Measurement of inert graphite anode wear using confocal surface profilometry

    By J. B. Rubenstein

    This work demonstrates the feasibility of using confocal surface profilometry to measure and characterize wear of graphite anode surfaces. This method was tested using anode samples that were electrol

    Jan 1, 2004

  • SME
    Going green with mobile mining equipment

    By Jake Gibson

    "As one of the most pressing and important political debates of this century, climate change has captured global attention and is forcing governments to take action toward decreasing greenhouse gas (G

    Jan 1, 2014

  • AIME
    Can Silver Come Back?

    By W. F. Boericke

    WORLD production of silver in 1929 totaled 256 million ounces. In 1928 production was 258 million ounces, and in 1927, 254 million ounces. With an actual decrease in the amount of silver produced last

    Jan 1, 1930

  • AIME
    Economic Aspects of Unit Operation of Oil Pools

    By Joseph E. Pogue

    THERE are two methods employed in the development of oil pools. The older and dominant method is one in which the primary object is the protection of the underground deposit from drainage through comp

    Jan 1, 1930

  • ABM
    Implementação Do Cockpit De Atendimento A Clientes Na Arcelormittal Tubarão

    By Jovanir Francisqueto

    O objetivo deste trabalho foi implementar a célula de atendimento a prioridades dos clientes na ArcelorMittal Tubarão (Cockpit de Atendimento a Clientes), com foco na melhoria dos indicadores relacion

    Aug 17, 2017

  • ABM
    The Effect Of Arcsavetm On The Eaf Process With Eccentric Bottom Tapping

    By Lidong Teng

    ArcSaveTM is a new generation of electromagnetic stirrer (EMS) from ABB for electric arc furnace (EAF) operation. Its goal is to improve the safety, increase the productivity and reduce costs. Electro

    Aug 16, 2017

  • ABM
    Impact Of Ultima® Roll Usage On Tco Development In Various Rod And Bar Mill Configurations

    By Michael Windhager, Karl H. Ziehenberger

    ULTIMA® are high performance, centrifugal cast, double poured (CC duplex) work rolls. This paper describes the principle of the ULTIMA® roll concept and its wide range of usability. The ULTIMA® concep

    Oct 1, 2019

  • DFI
    Design and In-Construction Geologic Characterization of Micropiles to Support a Historic Transmission Line Upgrade in the Steep Talus and Basalt Slopes of the Columbia River Gorge

    By Brian J. Olson, Kevin Haiar

    Originally constructed between 1939 and 1941 as part of Franklin D. Roosevelt’s New Deal programs, the Bonneville to Hood River 115 kV Transmission Line required an infrastructure upgrade to remain re

    Sep 8, 2021

  • SME
    Capitalization: Bolivia's Innovative Approach for Privatization, the Vinto Case

    By William P. Blacutt

    This paper describes the strategy, the struggles, and the obstacles encountered during the last two years in the ongoing process to capitalize Vinto. The effort involves the offering of a vertically i

    Jan 1, 1998

  • ISEE
    Gas control station for blasting process to fulfil the environmental goals set by the Chilean Ministry of Health.

    By Manuel Gutierrez, Roberto Gomez, Juan Aravena, Johan Gjoevad

    The use of explosives in mining operations is a process that involves the search for an ideal explosive for the type of geological condition of the mineral to be extracted. For the explosives present

    Jan 21, 2025