Search Documents

  • AIME
    Geophysics in the Metallic and Nonmetallic Field

    By Sherwin F. Kelly

    PLAIN mining engineers usually avoid any gathering of geo¬physicists because of the incomprehensibility of their discussion to the uninitiated. This being so, gradients, gravity and gammas will be def

    Jan 1, 1934

  • SME
    Development, Validation, And Use Of An Event-Oriented Haul-Cycle Simulation Program

    By William C. Dixon

    Since the mid 60's, several haul cycle simulation programs have been developed. However, most of these programs are believed to employ the continuous, rather than the discrete, event-oriented sim

    Jan 1, 1978

  • CIM
    The Reduction of Pressure Gradients in Oil Pipelines

    By M. E. Charles

    The use of water flowing as a lower layer to reduce pressure gradients in petroleum pipelines was investigated using 17.5 deg. A.P.I. Lloydminster crude oil in a 1-inch laboratory pipe-line and a 21h-

    Jan 1, 1960

  • SME
    Process Modifications At Reserve Mining Company

    By Charles L. Allie

    In June, 1980, Reserve Mining Company completed a 370 million dollar construction project which included process modifications required to reduce the silica content from nine to five percent by weight

    Jan 1, 1980

  • IMPC
    Investigation of the Influences of Citric Acid on the Flotation Behavior of Cassiterite

    By Y. M. Zhu, G. C. Gong

    "The influences of citric acid (CA) on the flotation behavior of cassiterite using styrene phosphonic acid (SPA) as the collector were studied via single mineral flotation tests, contact angle measure

    Jan 1, 2018

  • SME
    Efficient Lighting for the Presidio Parkway Tunnels

    By Pierre Longtin

    "Replacing the aging roadway access to the iconic Golden Gate Bridge, thereby ensuring traffic safety and robustness in case of seismic occurrences, provided an opportunity for major design improvemen

    Jan 1, 2016

  • AUSIMM
    Business Transformation - Lessons Learnt for Successful Change

    By G Campbell-Cowan

    Much has been written about the fact that most transformation efforts disappoint. This paper addresses factors that should be taken into consideration in planning and implementing transformation progr

    Nov 20, 2012

  • AUSIMM
    Surface Monitoring, Understanding and Modification at Molecular Level in Mineral Beneficiation by Infrared External Reflection Spectroscopy

    By E Mielczarski

    Determination of the adsorbed layer composition and structure at molecular and atomic levels and understanding adsorption mechanisms and dynamics are vitally important for the preparation of surface l

    Jan 1, 2005

  • SME
    The Advantage Of A Crowd For Acid Waste Liquors (36136083-067e-4f94-be20-c9512ab5ea75)

    By John H. Smith

    Because of increased pressure from Federal & State Regulatory Agencies, most acid flows will require some sort of treatment prior to being discharged to receiving streams. In many industries, the volu

    Jan 1, 1972

  • CIM
    Welding -A Useful Maintenance Tool

    By H. Thomasson

    This paper will deal with on-site maintenance welding using the stick electrode, electric arc process. It is primarily concerned with the underlying principles, the application of which, or the lack o

    Jan 1, 1967

  • TMS
    Process Off-Gas Cooling Design Considerations For Non-Ferrous Metallurgical Processes

    By Paykan Safe

    This paper reviews various process off-gas cooling options available for sulfide smelting processes. Advantages and disadvantages of each, system are discussed along with the selection criteria for a

    Jan 1, 1998

  • AIME
    Pittsburg International Session October, 1890 Paper - The Development of the Marine Engine, and the Progress made in Marine Engineering during the Past Fifteen Years

    By A. E. Seaton

    In this paper it will be my endeavor to trace the development of the marine engine and its appurtenances, and the general progress that has taken place in marine engineering generally during the past

    Jan 1, 1891

  • SME
    Accurate Mixing Of Sized Materials

    By Edward P. Larsen

    At our annual meeting in St, Louis, Mo. in February 1961, we presented a comprehensive paper (No. 61-B-22) on the subject of "Blending and Handling of Materials for Agglomeration". In that paper you w

    Jan 1, 1962

  • SME
    MINExpo 2012; More Than 50,000 Make It The Largest Show Ever

    By William Gleason

    The numbers tell the story of this one. More than 50,000 people and 1,890 exhibitors took over the Las Vegas Convention Center Sept. 24-26 for the largest mining trade show in the world ? MINExpo. In

    Jan 1, 2012

  • SME
    Evaluation of Post-blast Re-entry Times Based on Gas Monitoringof Return Air Mining, Metallurgy and Exploration

    By L. Yuan, J. H. Rowland, D. Bahrami, R. Thomas

    Blasting is the main method of production in many non-coal underground mining operations and produces multiple toxic gases as a result. The Mine Safety and Health Administration (MSHA) requires mine o

  • IIMP
    Factores que controlan la elección de un reactivo de flotación

    By Elmer Tveter

    El presente texto refiere los factores que controlan la elección de un reactivo de flotación como: Flow Sheet a emplearse, clase de mineral, suministro de agua, ubicación de la Planta y los sistemas d

    Jul 1, 1960

  • TMS
    Yunnan Copper Corporation's New Smelter China's First Isasmelt

    By Yun Li

    In 1999 Yunnan Copper Corporation (YCC) decided to modernise their copper smelter and change the existing sinter plant I electric furnace process to a combination of ISASMEL T and electric slag cleani

    Jan 1, 2003

  • TMS
    Yunnan Copper Corporation's New Smelter China's First Isasmelt (df7ddf50-ee43-4b28-b878-09128cee6894)

    By Yun Li

    In 1999 Yunnan Copper Corporation (YCC) decided to modernise their copper smelter and change the existing sinter plant I electric furnace process to a combination of ISASMEL T and electric slag cleani

    Jan 1, 2003

  • AUSIMM
    The Introduction of Axis at Black Star Open Cut

    By M Gabbitus, B Young, T Lukins, M Slater

    This paper details the implementation of a new type of grade control system at the Black Star open cut mine in Mount Isa, Queensland. It explores the site requirements for grade control, what as previ

    Sep 18, 2012

  • SME
    Indium Electrowinning from Sulfate Solutions: the Influence of Cathodic Support on the Process Effectiveness - Mining, Metallurgy & Exploration (2023)

    By A. Dell’Era, E. Ciro, C. Lupi

    The indium recovery via electrowinning from sulfate baths has recently gained significant attention as it does not present toxic emissions, hermetically sealed system requirements, human health, and e

    Jun 14, 2023