Search Documents

  • AIME
    PART IV - Orientation-Dependent Dislocation-Damping Factors

    By Robert E. Green, T. Hinton

    Expressions are derived for tke orientation factors appearing in the Grana to -Lucke theory of dislocation damping, for fcc crystals. The factors are given as functions of the elastic constants, the d

    Jan 1, 1967

  • SME
    Mining Foundation of the Southwest Honors Year 2000 Inductees

    The 18th annual American Mining Hall of Fame Awards Banquet sponsored by the Mining Foundation of the Southwest will be held on Saturday, Dec. 2, 2000 at The Westin La Paloma in Tucson, AZ. The 200

    Jan 1, 2000

  • SAIMM
    Effect Of Dual Phase Microstructure On The Toughness Of A Cr-Mo Low-Alloy Plate Steel - Synopsis

    By L. J. Leach

    Quench and tempered Cr-Mo plate steel was found not to contain a fully martensitic structure as a result of either slow slack quenching or insufficient hardenability at the cooling rates used. The res

    Jan 1, 2013

  • ISEE
    New Innovations in Drilling and Bit Technology, "Integrated Sectional Drill Steel System"

    By Steve Collinsworth, Nils Heinke

    In 1989, I realized the definite need for change in the Blast Hole Drilling Industry. With over 25 years of experience in dealing with the industry, I am well inGormed and educated concerning the prob

    Jan 1, 1997

  • SME
    Application Of A Perchloroethylene Medium In Coal Cleaning

    By T. A. Vivian

    The use of heavy media organic solvents to recover coal from its attendant gangue is hardly new. DuPont built a pilot plant using pentachloroethane in 1936 at Weston Coal Company, Weston Breaker, Shen

    Jan 1, 1984

  • ABM
    ESTIMATIVA DE FORMAÇÃO DA FASE G EM AÇOS HP POR MEIO DE TERMODINâMICA COMPUTACIONAL

    By Renato Affonso de Lima

    As colunas utilizadas para a produção de hidrogênio em fornos de reforma a vapor são submetidas a temperaturas da ordem de 900°C. Dessa forma, os aços inoxidáveis austeníticos da classe HPNb se mostra

    Oct 30, 2017

  • ABM
    Integridade Superficial Do Aço Aisi H13 Usinados Por Edm Na Fabricação De Matrizes De Conformação A Quente

    By Thiago Marques Ivaniski

    A fabricação de componentes para conformação mecânica possui uma gama de exigências devido aos esforços cíclicos, como por exemplo, fadiga térmica. Devido à capacidade de formar geometrias complexas e

    Aug 17, 2017

  • DFI
    Construction Productivity Advancement Research Program (CPAR)

    By Jesse A. Pfeiffer

    CPAR, the Construction Productivity Advancement Research Program, is a new initiative of the Corps of Engineers to enhance U.S. construction industry productivity through the development and applicati

    Jan 1, 1989

  • SME
    Construction Of The MCUA Tunnel And Force Mains Under The Raritan River, New Jersey: A Case History

    By Bob Rautenberg

    The Construction of Tunnel and Edison Force Mains contract involves the installation of two new force mains to provide a redundant means for sewage conveyance from Middlesex County Utility Authority?s

  • NIOSH
    25th International Conference On Ground Control In Mining - A Retrospective Assessment Of Longwall Roof Support With A Focus On Challenging Accepted Roof Support Concepts And Design Premises

    By Thomas M. Barczak

    The era of the shield-supported longwall face began in the United States a little over 25 years ago. The most fundamental development of the shield in the past 25 years has been an increase in size a

  • NIOSH
    IC 7976 Injury Experience In Coal Mining, 1955-56 - Analysis Of Mine Safety Factors, Related Employment, And Production Data - Introduction And Summary

    By John C. Machisak

    INJURY DATA and experience at coal mines in the United States for 1956 and 1956 are presented in this publication with a minimum of interpretation and comment because of the numerous tables required t

    Jan 1, 1960

  • DFI
    Large Diameter CIDH Construction In Cohesionless Soils By The Use Of Rotator/Ocsillator Techniques: A Case Study - 116th Avenue Bridge Over The Gila River Phoenix, Az.

    By M. Cornelius

    Drilled shaft construction through caving soils has historically been an uncertain, risky and costly operation. Uncertain, because the zone of caving may or may not be known, risky because the loss of

    Jan 1, 1999

  • TMS
    Studies on Coal in Pressure Leaching of Marmatite Concentrates

    By Zhigeng Xu

    Pressure leach of a Yunnan marmatite concentrates with adding coal as the elemental sulfur disperser was investigated. The experimental results show that the coal with carbon content higher than 70% i

    Jan 1, 2008

  • TMS
    Sulfur Compounds and Heavy Metal Removal Using Bioprocess Technology

    By Andre L. De Vegt

    For the past eight years Paques has been engaged in the development and installation of treatment systems based on biotechnological processes to remove sulfur compounds from water, air and gaseous str

    Jan 1, 1996

  • AUSIMM
    Leaching of Some Australian Nickeliferous Laterites with Sulphuric Acid at Atmospheric Pressure

    Sulphuric acid leaching at atmospheric pressure of a number of Australian nickeliferous laterites was examined in detail. The results obtained indicate that nickel can be extracted from these ores, al

    Jan 1, 1978

  • ABM
    Início E Estabilização Da Operação Do Alto Forno 1 Da Csp

    By Erik Álan de Arruda Vieira

    O início de operação da companhia Siderúrgica do Pecém foi um grande marco para a tecnologia e economia do estado do Ceará. O alto-forno é parte principal da área denominada “Redução”, onde ocorre o p

    Oct 30, 2017

  • ABM
    Estudo De Caso: Desgaste Nos Bocais Supersônicos Do Bico De Lança Da Aciaria Bof

    By Fabrício Silveira Garajau

    O sopro de oxigênio é a principal operação durante o processo de refino de aço em aciarias BOF (Basic Oxygen Furnace). Este sopro é feito por uma lança de injeção de oxigênio através de bocais supersô

    Aug 17, 2017

  • AUSIMM
    Instrumented column testing of salt uptake from compacted red mud into a cover

    By Y Zhu, D J. Williams, M O’Neill, C Zhang, X Lei

    A cover of inert material overlain by topsoil is required over compacted, seawater-neutralised red mud, a waste product from the refining of bauxite to produce alumina. The cover is to be revegetated,

    Jul 23, 2018

  • AUSIMM
    From mines to lungs – navigating the landscape of respirable dust characterisation

    By D I. Cliff, K Johnstone, N LaBranche

    The resurgence of silicosis and coal worker’s pneumoconiosis (CWP) in mining and the recent ban of engineered stone products underscore the need to comprehensively address mineral dust exposures and t

    Apr 16, 2024

  • DFI
    Behavior Of Large Bored Piles With Grouted End

    By Zhang Yaonian

    This paper describes full-scale tests on ten large bored piles with grouted end conducted for three projects in the urban area of Fuzhou city. Test program included site investigation, pile installati

    Jan 1, 2004