Search Documents

  • AIME
    Clayton Garrett Ball, Chairman, Coal Division, AIME

    By AIME

    COAL, its acquisition and consumption, has loomed large enough in the lives of many of us at one time or another, not from a technical standpoint, perhaps, but on a utility basis, to keep the house wa

    Jan 1, 1948

  • SME
    Eisenhower Memorial Tunnel - How Colorado Department Of Highways Improved Contracting Practices And Management

    By P. R. McOllough

    The Colorado Department of Highways awarded a contract to construct the Second Bore of the Eisenhower Tunnel in August, 1975. The contract was completed June 29, 1979, nine days ahead of schedule, wit

    Jan 1, 1981

  • NIOSH
    Technology News - No. 535 - NIOSH Releases New Educational Video Escape From Farmington No. 9: An Oral History

    Researchers with the National Institute for Occupational Safety and Health (NIOSH) have developed a training module to educate both new, inexperienced miners as well as veterans on important issues re

    May 1, 2009

  • RMCMI
    2008 Safety Awards

    Producers with Zero Reportables 2007!: ?New Horizon Mine, Western Fuels Colorado LLC ?Isaacs Run HWM, ICG ADDCAR Systems, LLC ?Savage Mine, Westmoreland Savage Corporation ?South Hallsville No 1

    Jan 1, 2008

  • SME
    SME Leadership Forum Addresses Shortage of Mining Professionals

    By Steve Kral

    In 2002, many in the mining industry — companies, academia and government — realized that the industry would soon be facing a serious shortfall in salaried and hourly employees. Depending on whose nu

    Jan 1, 2006

  • IIMP
    Flotación en la descarga de la molienda primaria: una alternativa para mejorar la performance metalurgica en la Compañía Minera Raura

    By Fernando Bermejo

    El presente texto describe la implementación del método Flash - Flotation para el proceso de optimización de plantas concentradoras polimetálicas en la Compañía minera Raura donde se tienen diferentes

    Sep 12, 2005

  • AUSIMM
    Developments in Diamond Drilling Deflection Equipment and Techniques at Broken Hill South Ltd.

    By Jones S. C

    A specific arc can be cut in hard rock formations using a specially designed multistep piloI bit, variable sized drift joint and long heavy control rod as a stabilizer rather than the Vaughan Thompson

    Jan 1, 1966

  • CIM
    The application of residence time distributions to flotation and mixing circuits (50aced84-3f19-4383-b90c-f475002bcac5)

    By J. E. Nesset

    "This paper discusses the importance of considering residence time distribution (RTD) in the design of flotation and mixing circuits and in the analysis of operating problems. The experiences and succ

    Jan 1, 1988

  • AIME
    Three Fall Meetings of the Institute in 1920

    By AIME AIME

    FOR many years it has been the invariable custom of the Institute, in addition to its annual meeting in February, to hold a technical meeting in the fall in some mining or metallurgical center in the

    Jan 1, 1920

  • NIOSH
    RI 4340 Investigation Of The Argall (Baggaley) Zinc-Lead Mine, Iowa County, Wis.

    By M. Howard Berliner

    In August 1943 the Bureau of Mines completed seven churn-drill holes in an area of old mine workings near Linden, Wis., formerly known as the Argall mine. The work was undertaken as part of a general

    Jan 1, 1948

  • AIME
    Reservoir Engineering - Interfacial Tensions at Reservoir Pressures and Temperatures; Apparatus and the Water-Methane System

    By B. B. Wood, M. J. Rzasa, E. W. Hough

    An apparatus for the determination of fluid-fluid interfacial tension by the pendant drop method has been constructed. The apparatus is refined beyond those previously described in that the samples ar

    Jan 1, 1951

  • AIME
    Reservoir Engineering - Interfacial Tensions at Reservoir Pressures and Temperatures; Apparatus and the Water-Methane System

    By E. W. Hough, B. B. Wood, M. J. Rzasa

    An apparatus for the determination of fluid-fluid interfacial tension by the pendant drop method has been constructed. The apparatus is refined beyond those previously described in that the samples ar

    Jan 1, 1951

  • AIME
    Ultimate Pit Limit Design Methodologies Using Computer Models - The State of the Art

    By Young C. Kim

    Abstract-The use of computer models to design the ultimate open pit limits during feasibility studies as well as during long-range mine planning is becoming an enforced Practice in all types of mining

    Jan 10, 1978

  • AIME
  • AIME
  • AIME
  • AIME
  • AUSIMM
    Effluent Treatment System at Pasminco Metals - EZ

    By Plamer D. J, Newman O. M G

    The Effluent Treatment System at Pasminco Metals - EZ (PMEZ) was commissioned in December, 1991 and has operated satisfactorily, ensuring that aqueous discharges from PMEZ comply with the Tasmanian

    Jan 1, 1993

  • SME-ICGCM
    Prediction Of Shearer Cutting Performance (2d8ef98a-f84a-4c60-8ac8-2edff3e8f14f)

    By D. L. Price

    This paper presents a method of measuring field power consumption of shearers and deriving specific energy consumption versus shearer haulage speed performance curves. A description of a computer prog

    Jan 1, 1992

  • ISEE
    Evolution of Single Shot Drawbell Blasting at New Afton Mine

    By Mike Lovitt

    New Gold Inc. had commissioned Orica to assist with the design of the drawbell blasting at New Afton Underground copper/gold block cave at Kamloops, British Columbia, Canada. Orica have had much succe

    Jan 1, 2013