Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
-
Demolition of the ADMP-1 Jackup Platform for Aramco in the Arabain GulfBy J S. Brower
Disposing of the AMDP-1, Jackup drilling rig in the Arabian Gulf.
Jan 1, 1978
-
A Repumpable Emulsion for Use in Mines Subject to Afterblast Sulfide Dust ExplosionsBy Tom Medak, Don H. Cranney, G Paul McKay, R Douglas Reid
Explosive initiated afterblast dust explosions can occur in high sulfide ore mines when the flame generated by the detonating explosives ignites the sulfide dust produced from the blast, from previous
Jan 1, 1994
-
A Statistical Model for Strength Estimation of Cemented Rockfill in Vertical Block MiningBy J Szymanski, S Planeta
Extensive rockfill cylinder testing was performed to determine the effect that aggregate size, aggregate moisture, Portland cement, fly ash and cement dispersant addition has on compressive strength o
Jan 1, 1998
-
A Primer For Engineering And Technical Professionals Regarding Reclamation And Environmental Surety BondsBy W. T. Gorton
Bonds are required by state and federal law to address reclamation when the permittee defaults. Under various principles of law, a bonding company may propose to perform the obligations of the permit
Jan 1, 2003
-
Profile Of Risks Associated With Mine Flooding For Control Of Acid Mine DrainageBy Dr. Richard F. Coon, James D. Mavis
Risks and abatements associated with preliminary reconnaissance, plugging and filling, and maintenance of perched mine water pool are examined. This case history showed that the initial appeal of port
Jan 1, 1992
-
Development of hydrologic risk-based methodology for evaluation of dam safety in MissouriBy B. J. Swenty, J. L. Hubbard, R. L. Peyton
Based on the results of the National Program of Inspection of Nonfederal Dams conducted by the US Army Corps of Engineers during 1977-1981, Missouri was found to have the highest number of "unsafe" da
Jan 1, 1987
-
A Systems Approach For Worker Needs Analysis In Training Program Development (ABSTRACT PAGE)By C. J. Bise
Safety training requirements differ from mine to mine due to changes in the demographic characteristics of the workers or changes in job and organizational characteristics. Accordingly, a microcompute
Jan 1, 1995
-
An Erector Transporter For The Installation And Removal Of Specialized Mining Equipment UndergroundBy J. H. LaVerne Palmer, W. (Bill) C. Cox, Lorant B. Geller
An erector transporter (ET) has been designed and built to lift, carry and erect heavy machinery components, in particular the components of a 7.6 m diameter tunnel boring machine (TBM), within the ac
Jan 1, 1985
-
A Contracting Strategy for Managing Risk on Subsurface Projects Delivered Using Design-BuildBy David Corkum, David Hatem
Subsurface construction projects are risky ventures and the decision to deliver a project using the Design-Build model does not eliminate those risks. Differing site conditions, inadequate design, and
Jan 1, 2003
-
Engineering Considerations for Blasting at the Hanging Lake Tunnel Project, Glenwood Canyon, ColoradoBy Thomas R. Scotese, John L. Ackerman
The Hanging Lake Tunnel Project represents a major portion of the Glenwood Canyon Project, the last piece of Interstate 70 to be constructed. The project features twin bore, large span rock tunnels an
Jan 1, 1992
-
Extractive Metallurgy Division - Improved Methods for the Preparation of the Rare-Earth MetalsBy P. E. Palmer, A. H. Daane, C. E. Habermann
Jan 1, 1965
-
Theory, Practice and Developments of the DSM Heavy Medium Cyclone Process for MineralsBy J. Absil, H. Dreissen
Upgrading low-concentration ores is of increasing importance today. The heavy medium cyclone process, due to strong centrifugal forces, effectively separates particles varying only slightly in specifi
Jan 1, 1982
-
What Bankers Look For in Project Loan Applications (4a4b5185-fdb9-4687-8ae0-c7fe01858643)Perhaps, after years of concerted effort at a mineral prospect, your company has reached the stage of feasibility study. Detailed target investigations, drilling, bulk sampling, land acquisition, and
Jan 12, 1978
-
Experiences with a Density Recording and Controlling Instrument for Heavy-media Separation UnitsBy James J. Bean
Although determining and controlling specific gravity of operating medium in a heavy-media plant manually presents no problem, there are advantages to automatic recording and control. The two installa
Jan 3, 1950
-
The High Road to Environmental Compliance: A New Strategy for the Mining IndustryBy Richard E. Gertsch
The recent upswing in mining coincided with increased environmental concern. These trends have significantly increased regulation, but have not always provided sound environmental protection. Througho
Jan 1, 1991
-
Technical Notes - Thermal Segregation: A Mechanism for the Segregation of Hydrogen in SteelBy E. E. Duncan, G. Derce
REVIEW of the literature on hydrogen in steels indicates that inadequate consideration has been given to the influence of temperature gradients on segregation of this element. Even when segregation ha
Jan 1, 1951
-
Advanced Gravity Concentrators For Improving Metallurgical Performance (MINERALS AND METALLURGICAL PROCESSING MAY 1985)By R. H. Goodman, C. A. Brown
The development of improved new models of spiral concentrators is reviewed. The mechanics of separation of spiral concentrators are stated, including the effects of operating parameters. Some of the t
Jan 1, 1986
-
PC-Based Worker Scheduling System For Underground Mines (525809d6-2c82-44c1-80ab-2e76b51258c2)By R. L. Grayson
As a followup to a USBM-sponsored research project, the authors utilized the knowledge-base structure and system concepts from a Sun Sparcstation-based worker-scheduling system of the mine-management
Jan 1, 1997
-
Monitoring Indices for the Support and Surrounding Strata System on a Longwall FaceBy He F, Zhu D
How to monitor and control the support and surrounding strata system on a longwall face effectively is one of the major research problems in ground control. Based on observations on movements of t
Jan 1, 1992