Search Documents

  • AIME
  • ISEE
    Demolition of the ADMP-1 Jackup Platform for Aramco in the Arabain Gulf

    By J S. Brower

    Disposing of the AMDP-1, Jackup drilling rig in the Arabian Gulf.

    Jan 1, 1978

  • ISEE
    A Repumpable Emulsion for Use in Mines Subject to Afterblast Sulfide Dust Explosions

    By Tom Medak, Don H. Cranney, G Paul McKay, R Douglas Reid

    Explosive initiated afterblast dust explosions can occur in high sulfide ore mines when the flame generated by the detonating explosives ignites the sulfide dust produced from the blast, from previous

    Jan 1, 1994

  • AUSIMM
    A Statistical Model for Strength Estimation of Cemented Rockfill in Vertical Block Mining

    By J Szymanski, S Planeta

    Extensive rockfill cylinder testing was performed to determine the effect that aggregate size, aggregate moisture, Portland cement, fly ash and cement dispersant addition has on compressive strength o

    Jan 1, 1998

  • SME
    A Primer For Engineering And Technical Professionals Regarding Reclamation And Environmental Surety Bonds

    By W. T. Gorton

    Bonds are required by state and federal law to address reclamation when the permittee defaults. Under various principles of law, a bonding company may propose to perform the obligations of the permit

    Jan 1, 2003

  • SME
    Profile Of Risks Associated With Mine Flooding For Control Of Acid Mine Drainage

    By Dr. Richard F. Coon, James D. Mavis

    Risks and abatements associated with preliminary reconnaissance, plugging and filling, and maintenance of perched mine water pool are examined. This case history showed that the initial appeal of port

    Jan 1, 1992

  • SME
    Development of hydrologic risk-based methodology for evaluation of dam safety in Missouri

    By B. J. Swenty, J. L. Hubbard, R. L. Peyton

    Based on the results of the National Program of Inspection of Nonfederal Dams conducted by the US Army Corps of Engineers during 1977-1981, Missouri was found to have the highest number of "unsafe" da

    Jan 1, 1987

  • SME
    A Systems Approach For Worker Needs Analysis In Training Program Development (ABSTRACT PAGE)

    By C. J. Bise

    Safety training requirements differ from mine to mine due to changes in the demographic characteristics of the workers or changes in job and organizational characteristics. Accordingly, a microcompute

    Jan 1, 1995

  • SME
    An Erector Transporter For The Installation And Removal Of Specialized Mining Equipment Underground

    By J. H. LaVerne Palmer, W. (Bill) C. Cox, Lorant B. Geller

    An erector transporter (ET) has been designed and built to lift, carry and erect heavy machinery components, in particular the components of a 7.6 m diameter tunnel boring machine (TBM), within the ac

    Jan 1, 1985

  • SME
    A Contracting Strategy for Managing Risk on Subsurface Projects Delivered Using Design-Build

    By David Corkum, David Hatem

    Subsurface construction projects are risky ventures and the decision to deliver a project using the Design-Build model does not eliminate those risks. Differing site conditions, inadequate design, and

    Jan 1, 2003

  • ISEE
    Engineering Considerations for Blasting at the Hanging Lake Tunnel Project, Glenwood Canyon, Colorado

    By Thomas R. Scotese, John L. Ackerman

    The Hanging Lake Tunnel Project represents a major portion of the Glenwood Canyon Project, the last piece of Interstate 70 to be constructed. The project features twin bore, large span rock tunnels an

    Jan 1, 1992

  • AIME
  • AIME
    Theory, Practice and Developments of the DSM Heavy Medium Cyclone Process for Minerals

    By J. Absil, H. Dreissen

    Upgrading low-concentration ores is of increasing importance today. The heavy medium cyclone process, due to strong centrifugal forces, effectively separates particles varying only slightly in specifi

    Jan 1, 1982

  • AIME
    What Bankers Look For in Project Loan Applications (4a4b5185-fdb9-4687-8ae0-c7fe01858643)

    Perhaps, after years of concerted effort at a mineral prospect, your company has reached the stage of feasibility study. Detailed target investigations, drilling, bulk sampling, land acquisition, and

    Jan 12, 1978

  • AIME
    Experiences with a Density Recording and Controlling Instrument for Heavy-media Separation Units

    By James J. Bean

    Although determining and controlling specific gravity of operating medium in a heavy-media plant manually presents no problem, there are advantages to automatic recording and control. The two installa

    Jan 3, 1950

  • SME
    The High Road to Environmental Compliance: A New Strategy for the Mining Industry

    By Richard E. Gertsch

    The recent upswing in mining coincided with increased environmental concern. These trends have significantly increased regulation, but have not always provided sound environmental protection. Througho

    Jan 1, 1991

  • AIME
    Technical Notes - Thermal Segregation: A Mechanism for the Segregation of Hydrogen in Steel

    By E. E. Duncan, G. Derce

    REVIEW of the literature on hydrogen in steels indicates that inadequate consideration has been given to the influence of temperature gradients on segregation of this element. Even when segregation ha

    Jan 1, 1951

  • AIME
    Advanced Gravity Concentrators For Improving Metallurgical Performance (MINERALS AND METALLURGICAL PROCESSING MAY 1985)

    By R. H. Goodman, C. A. Brown

    The development of improved new models of spiral concentrators is reviewed. The mechanics of separation of spiral concentrators are stated, including the effects of operating parameters. Some of the t

    Jan 1, 1986

  • SME
    PC-Based Worker Scheduling System For Underground Mines (525809d6-2c82-44c1-80ab-2e76b51258c2)

    By R. L. Grayson

    As a followup to a USBM-sponsored research project, the authors utilized the knowledge-base structure and system concepts from a Sun Sparcstation-based worker-scheduling system of the mine-management

    Jan 1, 1997

  • AUSIMM
    Monitoring Indices for the Support and Surrounding Strata System on a Longwall Face

    By He F, Zhu D

    How to monitor and control the support and surrounding strata system on a longwall face effectively is one of the major research problems in ground control. Based on observations on movements of t

    Jan 1, 1992