Search Documents

  • AIME
    Addition Method For Calculating Rockwell C Hardness Of The Jominy Hardenability Test

    By John L. Lamont, Walter Crafts

    ADEQUATE hardenability has long been recognized as one of the first requirements for producing desired mechanical properties in a heat-treated steel. Since the introduction of the Jominy end-quench te

    Jan 1, 1945

  • DFI
    Modification of Best-Fit Interpretation Method for Ultimate Capacity of Screw Pile

    By Adnan A. Malik, Tadashi Maejima, Jiro Kuwano

    "ABSTRACTTheoretical approach to estimate the ultimate pile capacity gives a rough idea at the initial stage of design that later on strengthen by the execution of static pile load test at site. The s

    Jan 1, 2014

  • NIOSH
    NBSIR 74-378 - Time And Amplitude Statistics For Electromagnetic Noise In Mines

    By Motohisa Kanda

    The time and amplitude statistics necessary to adequately describe electromagnetic (EM) noise in mines are illustrated through computer software techniques. They are 1) Allan Variance Analyses (AVA),

  • TMS
    Characterization of Nickel Oxide Nanoparticles for Hydrogen Adsorption with External Electric Fifled

    By Xiang Sun, Zheng Zhang, Jiann-Yang Hwang, Zhiwei Peng

    "Nickel oxide nanoparticles were synthesized using sodium dodecyl sulfate as the surfactant and urea as the hydrolyzing agent and different calcination temperatures and time were selected for preparat

    Jan 1, 2012

  • SME
    CYANIDE RECOVERY BY THE SART PROCESS FOR THE Loso-MARTE PROJECT, CHILE

    By C. A. Fleming, K. W. Sarbutt, P. K. MacPhail

    The SART process has been developed for Teck to treat bar­ren solution from the cyanidation/CIP process that has been developed for the Lobo-Marte project in Chile. The objective of the process is to

    Jan 1, 1998

  • AUSIMM
    A New Materials Handling Technique for Cemented Rockfill Distribution in VBM Mining

    By Szymanski J

    Although efforts towards producing a `total quality rockfill product' have allowed cemented rockfill costs to be reduced considerably, there is still tremendous potential for further cost reduc

    Jan 1, 1995

  • NIOSH
    Process For Recovering Neodymium And Iron From Permanent NdFeb Magnet Scrap - Objective

    Develop hydrometallurgical or pyrometallurgical recycling methods to recover valuable rare-earth compounds from various forms of NdFeB magnet scrap. Background The U.S. Bureau of Mines (USBM) ha

    Jan 1, 1993

  • CIM
    Centre for Coal and Mineral Processing at the University of British Columbia

    By G. W. Poling

    "Construction, equipping and planned operation of a new laboratory for engineering-teaching and research in coal and mineral processing is described. This facility will provide approximately 1860 m2 (

    Jan 1, 1980

  • AUSIMM
    Newly Developed Method and Equipment for Tunnel Excavation-Construction of Myojin Tunnel

    By Fukuichi K, Matsukawa H, Nakagawa M

    The Myojin Tunnel, located on the Shikoku Expressway being constructed by the Japan Highway Public Corporation, is 3,770 m long with a cross sectional area of 80 m2. Kajima Corporation, the contrac

    Jan 1, 1987

  • NIOSH
    RI 8424 - A Fail-Safe Control System for a Mine Methane Pipeline

    By P. W. Jeran, S. J. Pepperney, M. C. Irani, F. F. Kopsch

    The Bureau of Mines has designed and put into operation a fail-safe control system for use in underground coal mines equipped with methane drainage pipelines. This control system can detect certain un

    Jan 1, 1980

  • DFI
    Toe Protection For H-Piles On Sloping Bedrock At Rainy River - Summary

    By Jon E. Bischoff

    Construction of a secondary clarifier on the banks of Rainy River, Northern Minnesota, required the driving of H-piles 14HP102 to a sloping, very strong bedrock through thick deposits of soft and medi

    Jan 1, 1993

  • IMMS
    The Kermadec Arc: A Hot Prospect For Gold-Rich Massive Sulfide Deposits?

    By Cornel E. J. de Ronde

    Volcanic arcs, including both island arc and intra-oceanic arc systems, combined extend for ~22,000 km around the Earth, with the majority (~20,000 km) occurring in the Pacific basin. These arcs are

    Jan 1, 2002

  • DFI
    A New Method of Quality Control for Construction Joints in Diaphragm Walls

    By Nikolaus Schneider

    "Abstract: The combination of failure in joints of diaphragm walls and their exposure to water pressure may have far reaching effects ranging from water leakage to the risk of catastrophic loss of sta

    Jan 1, 2014

  • AUSIMM
    Gold Particle Characteristics in Narrow Vein Deposits - Implications for Evaluation and Metallurgy

    By I M. Platten, Y Xie

    Narrow vein gold mineralisation generally contains both fine (<100 ¦m) and coarse (>100 ¦m) gold particles. The in situ size and shape, deportment, distribution and abundance of the particles co

    Jan 1, 2008

  • SME-ICGCM
    Pillar Design Issues For Underground Stone Mines (5c6602ba-4b85-4ec3-ad15-c1c321c1afcd)

    By A. T. Iannacchione

    Underground stone mining represents an emerging sector for the U.S. mining industry. As this expansion takes mines under deeper cover and as more efficient mining methods are utilized, adequate stone

    Jan 1, 1999

  • AUSIMM
    Structural Analysis of Acoustic Televiewer Logs for Large Diameter Raise Bored Shafts

    By R M. Stephenson

    Large diameter raise boring is a common raise excavation method in the Australian mining industry. Geotechnical investigations were conducted on several large diameter raise bore projects at Gwalia Mi

    Mar 24, 2014

  • AUSIMM
    Related Genesis for Iron, Manganese and Gold-copper Ores in Western Australia

    By P B. Schwann

    The commonly accepted genetic theories of Pilbara iron ores and Woodie Woodie manganese ores have often presented them as quite unique. This apparent uniqueness is not confined to just iron and mangan

    Jul 13, 2015

  • IMMS
    The Initial Spreading of Turbidity Plumes – Dedicated Laboratory Experiments for Model Validation

    By Frans van Grunsven, Cees van Rhee, Geert Keetels

    One of the obstacles during the initial phases of project development is the assessment of the environmental impact. Mining residue, consisting of fine seafloor sediments, are to be discharged subsea

    Jan 1, 2018

  • TMS
    State of the International Nickel Industry -A Canadian Perspective

    By Robert G. Telewiak

    During the past few years, the international nickel industry has taken some important steps to respond to conditions of global production overcapacity, relatively flat demand and low prices. These inc

    Jan 1, 1988

  • AIME
    Production - Domestic - Oil and Gas Development in North Central Texas for 1939

    By H. W. Immolz

    The Palo Pinto limestone pools of Jones and Shackelford Counties were defined and almost fully developed during the year. A new Palo Pinto limestone pool was apparently discovered when the K. B. Nowel

    Jan 1, 1940