Search Documents

  • SME
    Confirmatory Factor Analysis Model Of The Reliability Of A Measure Of The Severity Of Coal Mine Injuries In The United States (71bbe54e-af56-46ce-8243-04d172d64253)

    By David Lynn Passmore

    The reliability of mine operators reports to the Health and Safety Analysis Center of the U.S. Deparetment of Labor of days lost from work by injured miners is .267.

    Jan 1, 1985

  • CIM
    La Silice de Charlevoix (9945a8e8-5a24-4e47-baa7-1323ed5a28a8)

    By Jehan Rondot, Raymond Marleau

    "Des quartzites trés pars ont été découverts au cours de la cartographie de la region du lac des Martres, étape de l'étude géologique de la region de Charlevoix.On distingue quatre groupes métasédimen

    Jan 1, 1977

  • IIMP
    Generación eléctrica y desalinización de agua de mar

    By Enrique Monge

    El presente texto aborda el problema de la salinización y escasez del agua para la costa del Perú a través del uso de la generación eléctrica. La disponibilidad de energía eléctrica permitirá la expl

    Sep 1, 1964

  • SME
    Limestone Marketing In A Changing Economy - The Economic Realities

    By Robert C. Freas

    While on the surface limestone marketing may appear mundane, it has continued to provide a series of challenges beyond the realm normally envisioned with this industry. This paper presents a case hist

    Jan 1, 1981

  • SME
    International Standards for Tailings Management - SME Annual Meeting 2025

    By Charles Dumaresq

    The management of mine tailings poses a complex range of potential risks, including physical risks, such as the risk of catastrophic failure of a tailings facility and chemical risks such as the risk

    Feb 1, 2025

  • AUSIMM
    Wireless Ad hoc System for Positioning – Effective Equipment and Personnel Location for Mining Operations

    By M Hedley

    Tracking plant and personnel in mining operations provides multiple potential benefits for a mine including improved safety, better monitoring of production, traffic control and, in the future, monito

    Nov 22, 2011

  • SAIMM
    The Establishment Of A Mine Design Laboratory For Improved Teaching Of And Learning By Mining Engineering Students: A Case Study ? Synopsis

    By B. Genc

    Improving student success rates without compromising the quality of graduates is one of the biggest challenges expanding university programmes are facing in South Africa. By establishing a new Mine De

    Jan 1, 2012

  • SME
    Exploration and Improvement of Fuzzy Evaluation Model for Rockburst - Mining, Metallurgy & Exploration (2024)

    By Tuanhui Wang, Qiwei Wang, Quanrui Liu, Jianhui Xu, Chao Wang, Yu Liu, Yuefeng Li

    Rockburst is a highly destructive geological hazard that can cause casualties and equipment damage. To achieve highaccuracy discrimination of rockburst intensity, this article proposes an improved mod

    Feb 28, 2024

  • SME
    Geometallurgical Studies for the Mineração Rio Do Norte Bauxites Plateau Saracá III, Brazil

    By M. A. S. Martins, H. Medeiros, B. Y. B. Dos Santos

    This paper contains the geometallurgical studies, performed for Mineração Rio do Norte bauxites, applied to a selected area belonging to Plateau Saracá III, referring to an exploitation period of one

    Jan 1, 1998

  • TMS
    Improved Technology For Precipitating Metal Hydroxides

    By Roger N. Kust

    Removal of heavy metals from industrial process streams is becoming increasingly important for _the recovery and reuse of values in process tails. Technology has been available for several years which

    Jan 1, 1992

  • ABM
    Diagnosis Solutions For Rolling Condition And Product Quality At Metal Plants*

    By Haruki Inami, Takashi Ishida, Kazuhiro Ohara, Hiroyuki Imanari

    The highly competitive business environment of the international metals industry is driving demand for more cost-effective operation of steel making facilities, rolling mills, and strip processing lin

    Oct 1, 2019

  • SME
    An Update On Face Ventilation Research For Improved Longwall Dust Control

    By R. A. Jankowski

    Although the number of operating longwall mining systems has remained relatively consistent over the past five years, longwall production levels have increased significantly during this period. Longwa

    Jan 1, 1998

  • AUSIMM
    REFLUX versus hydraulic classifier – a comparative analysis for hematite concentrate cleaning

    By E Bouchard March, F Lavoie, B Legare, K Bourassa

    Quebec Iron Ore (QIO), a subsidiary of Champion Iron Limited (Champion), completed the restart of the Bloom Lake iron ore mine located in the heart of the Labrador Trough region of Northern Quebec, Ca

    Nov 8, 2021

  • AUSIMM
    Sustainability Reporting and Mining - An Assessment of the State of Play for Environmental Indicators

    The global mining industry is perceived to be a world leader in sustainability reporting û with a 2008 Ernst & Young survey placing four mining companies in their top five performers in sustainabi

    Jan 1, 2009

  • SME
    A Forecasting Methodology For Aluminum Prices

    By Paul H. Earl

    This paper discusses the evolution of a modeling methodology for explaining price behavior in the aluminum industry. Three generations are described, each utilizing as a foundation a microeconomic sta

    Jan 1, 1979

  • CIM
    Prospects For Improved Monitoring Systems

    By J. O?Shea

    From the characteristics of the new (1976) electronic components and units that are being marketed, the author has tried to foresee the types and the performances of the near-future slope-monitoring e

    Jan 1, 1978

  • CIM
    Blind drilling for shaft development

    By James H. Cobbs

    Blind boring of shafts is becoming an increasingly important part of shaft sinking. Blind-bored shafts have reached diameters of 25 It in Europe and 16-1/2 ft in the United States. Much of the technol

    Jan 1, 1979

  • DFI
    Drilled Pier Foundation with Ground Improvement Using Cement Deep Soil Mixing for Highway Bridges

    By Shahriar Vahdani, Andy Herlache, Andrew Bro, Wei-Yu Chen

    "The Presidio Parkway Project will reconstruct approximately 1.6 miles of highway, including seven bridges, three cut-and-cover tunnels, and an undercrossing connecting the Golden Gate Bridge to the C

    Jan 1, 2014

  • ISEE
    New Dimensions for Drilling and Blasting In Surface Mining of Precious Metals

    By Tom Short, Paul Kunze

    In this paper, the authors describe major changes in drilling and blasting methods instituted at the Zortman And Landusky Mining Company Properties to maintain the viability of these north central Mon

    Jan 1, 1986

  • CIM
    Sulphide Precipitation and Ion Exchange Technologies for Cost Effective Removal of Selected Metals in Wastewater

    By A. Consigny

    New "clean technologies" to treat mining and metallurgical effluents containing dissolved metals have been successfully applied at mine sites in North America and Asia, treating water flows up to 24,0

    Jan 1, 2011